    • 1. 发明专利
    • Spear for pulling out steel pipe and method for pulling out steel pipe
    • 用于拔出钢管的SPEAR和用于拔出钢管的方法
    • JP2008106480A
    • 2008-05-08
    • JP2006289147
    • 2006-10-24
    • Nissaku:KkToa Tone Boring:Kk株式会社日さく株式会社東亜利根ボーリング
    • SHIBAMIYA ICHIROABE TAKESHIKITAHARA TOSHIHIROKURIMOTO TAMOTSUOTA DAISUKE
    • E02D9/02
    • PROBLEM TO BE SOLVED: To pull a steel pipe buried in the ground out of the ground simply by utilizing an internal wall of the steel pipe.
      SOLUTION: A spear 1 is attached to a tip of a boring rod 2 while a slider 3 is positioned in the lowermost part and is inserted into the steel pipe 21. The boring rod 2 is rotated and a spear 1 body is rotated to lift the slider 3 for the body by action of a screw. A friction spring of a jaw 4 is pressed against the internal wall of the steel pipe 21 to prevent the jaw 4 and the slider 3 from rotating together by friction resistance. The jaw 4 is pushed out onto an outer side by lifting the slider 3 and is pressed against the internal wall of the steel pipe 21 so that teeth 40 of the jaw 4 bite into the internal wall of the steel pipe 21. The boring rod 2 is gradually pulled up, the jaw 4 bites into the internal wall of the steel pipe 21 completely, and the spear 1 and the steel pipe 21 are mutually integrated to pull up the boring rod 2 while applying vibration to the boring rod 2.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:通过利用钢管的内壁将埋在地下的钢管拉出地面。 解决方案:将矛杆1安装在镗杆2的前端,同时滑块3位于最下部,并插入钢管21中。镗杆2旋转,矛1体旋转 通过螺丝的作用提升身体的滑块3。 颚4的摩擦弹簧被压靠在钢管21的内壁上,以防止夹爪4和滑块3通过摩擦阻力一起旋转。 通过提起滑块3将夹爪4推出到外侧,并将其压向钢管21的内壁,使得夹爪4的齿40咬入钢管21的内壁。镗杆2 颚部4被逐渐拉起,颚部4完全咬入到钢管21的内壁,矛杆1和钢管21相互一体成型,同时向镗杆2施加振动,从而拉出镗杆2。 >版权所有(C)2008,JPO&INPIT
    • 3. 发明专利
    • Digger
    • DIGGER
    • JP2007146514A
    • 2007-06-14
    • JP2005343179
    • 2005-11-29
    • Toa Tone Boring:Kk株式会社東亜利根ボーリング
    • KITAHARA TOSHIHIROIGARASHI TAKUJIRO
    • E21B7/00
    • PROBLEM TO BE SOLVED: To provide a digger which improves construction efficiency by preventing clogging with gravel. SOLUTION: The digger 1 is fitted to the front end of a rod 11, and is suspended in the earth for drilling work. A fixed pipe 12 for reverse circulation is fixed to the front end of the rod 11, and hydraulic motors 2, 2, which rotates a bit 3, are disposed on both sides of the fixed pipe 12. Earth and sand dug up by the rotation of the bit 3 is sucked together with dug mud water into the front end entrance of the fixed pipe 12, and is sent out onto the ground by an underwater sand pump 4, which is driven by a hydraulic motor 40, as shown by an arrow in the drawing. The digger 1 includes a fixed teeth 51 which are spaced at proper intervals and are fixed to the inner surface of the front end of the fixed pipe 12, and crushing teeth 52 which extend from the base of the bit 3 to the inside of the fixed pipe 12 and circle along the inner periphery of the fixed pipe 12 as the bit 3 rotates. Gravel is crushed by the fixed teeth 51 and crushing teeth 52, and is sent out onto the ground smoothly. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种通过防止用砂砾堵塞来提高施工效率的挖掘机。 解决方案:挖掘机1安装在杆11的前端,并悬挂在地面进行钻孔作业。 用于反向循环的固定管12固定在杆11的前端,而位3旋转的液压马达2,2设置在固定管12的两侧。通过旋转挖掘地球和沙子 的位3与挖泥泥水一起吸入固定管12的前端入口,并由水下马达40驱动的水下砂泵4送出到地面,如箭头所示 在图中。 挖掘机1包括固定齿51,其以适当间隔隔开并固定到固定管12的前端的内表面;以及破碎齿52,其从钻头3的底部延伸到固定的内侧 管12旋转时沿着固定管12的内周圆形。 砾石被固定齿51和破碎齿52破碎,并顺利地送出到地面上。 版权所有(C)2007,JPO&INPIT