会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Reinforcing short fiber for cement-based formed body
    • 基于水泥的成型体加固短纤维
    • JP2009234796A
    • 2009-10-15
    • JP2008078877
    • 2008-03-25
    • Toda Constr Co LtdUbe Nitto Kasei Co Ltd宇部日東化成株式会社戸田建設株式会社
    • OTA SHINJIKATO YAICHIYASHIRO HIROFUMITANAKA TORUKAWABATA YUKI
    • C04B16/06D01F6/06
    • PROBLEM TO BE SOLVED: To provide a reinforcing short fiber for a cement-based formed body where problems in charging workability of the fiber, dispersibility, workability in concrete construction and the like do not occur and where the bending toughness of a hardened cement-based formed body can be enhanced.
      SOLUTION: The reinforcing short fiber for the cement-based formed body which is a stretched fiber whose main ingredient is a polypropylene resin is characterized by having a nearly quadrangular cross-sectional shape with four projected parts, having recessed parts formed with a specified interval along the longitudinal direction of the fiber on nearly quadrangular opposing two faces and having recessed parts formed with a specified interval along the longitudinal direction of the fiber on the nearly quadrangular projected parts.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:为了提供一种用于水泥基成型体的增强短纤维,其中不会发生纤维的填充加工性,分散性,混凝土构造等的可加工性等问题,并且硬化的弯曲韧性 水泥基成型体可以增强。 解决方案:作为主要成分为聚丙烯树脂的拉伸纤维的水泥基成形体的增强短纤维的特征在于具有四个突出部的近似四边形的横截面形状,具有形成有凹部的凹部 沿着纤维的长度方向在大致四边形相对的两个表面上具有指定的间隔,并且具有沿近似四边形突出部分沿着纤维的纵向以特定间隔形成的凹部。 版权所有(C)2010,JPO&INPIT
    • 3. 发明专利
    • Concrete material
    • 混凝土材料
    • JP2014114176A
    • 2014-06-26
    • JP2012267443
    • 2012-12-06
    • Nishimatsu Constr Co Ltd西松建設株式会社Toda Constr Co Ltd戸田建設株式会社
    • SATO KOZOSHIINA TAKAYOSHIKAWAGUCHI YASUHIROTANAKA TORU
    • C04B28/04C04B18/14C04B20/00
    • Y02P40/143Y02W30/94
    • PROBLEM TO BE SOLVED: To provide a concrete material in which while a unit water content and a used amount of a chemical admixture that are approximately equal to those in a case in which only cement is used are secured, lowering of slump by a lapse time from milling finish can be made small.SOLUTION: The concrete material is a concrete material that is produced such that a mixed cement including at least 70 mass% of an admixture, an aggregate, water, and a chemical admixture are mixed. The blending of the concrete material is made by addition amounts of a prescribed water cement ratio, a unit water content, a fine aggregate ratio and a chemical admixture that are necessary in a case in which only a cement is used to produce a concrete material, however, a chemical admixture that includes a constant amount of a thickener is used as the chemical admixture.
    • 要解决的问题:提供一种混凝土材料,其中确保与仅使用水泥的情况下大致相同的单位含水量和使用量的化学混合物,其中确保了坍落度降低了一段时间 可以制成从铣削加工成小的混凝土材料。混凝土材料是混凝土材料,其混合物包含至少70质量%的混合物,骨料,水和化学混合物的混合水泥。 混凝土材料的混合通过在仅使用水泥制造混凝土材料的情况下所需的规定水泥比,单位含水量,细骨料比和化学混合物的添加量, 然而,使用包含恒定量的增稠剂的化学混合物作为化学混合物。
    • 5. 发明专利
    • Time management system for concrete placement and the time management method
    • 混凝土时间管理系统和时间管理方法
    • JP2012229529A
    • 2012-11-22
    • JP2011096923
    • 2011-04-25
    • Toda Constr Co Ltd戸田建設株式会社
    • SATO IKUUMEMOTO MUNEHIROKATSUKI YASUKIIDO YASUHIROTATENO TAKANOBUBABA ASAYUKIHATA NAOTOTANAKA TORUYAMADA TSUTOMU
    • E04G21/00B28B1/08
    • PROBLEM TO BE SOLVED: To provide a time management system for concrete placement, which solves the problems in conventional time management systems for concrete placement that manual recording for each placement layer by an operator is time-consuming and erroneous due to negligence of measurement or recording, or misdescription of the time of placement on a consolidated fresh concrete.SOLUTION: A time management system 1 for concrete placement comprises an acceleration sensor device 3 which is set in a construction area 4 for placing concrete in a formwork so as to detect the vibration of a vibrator for compaction in use during concrete placement, a radio transmission device on the side of concrete placement site which is connected to the acceleration sensor device 3, a radio receiver on a management side which receives data from the radio transmission device, a management server 6 connected to the radio receiver, and a terminal computer 6b connected to the management server. The acceleration sensor device 3 detects the initiation and completion of the vibration of the vibrator for the management of concrete placement.
    • 要解决的问题:为了提供用于混凝土浇筑的时间管理系统,其解决了常规时间管理系统中用于具体放置的问题,操作者对于每个铺设层的手动记录是由于过度的错误而耗时和错误的 测量或记录,或者是将混合新拌混凝土放置时间的错误描述。 解决方案:用于混凝土浇筑的时间管理系统1包括加速度传感器装置3,该加速度传感器装置3设置在用于将混凝土置于模板中的结构区域4中,以便在混凝土浇筑期间检测振动器用于压实的振动, 与加速度传感器装置3连接的混凝土配置位置侧的无线发送装置,从无线发送装置接收数据的管理侧的无线接收机,连接到无线接收机的管理服务器6,以及终端 计算机6b连接到管理服务器。 加速度传感器装置3检测振动器的振动的开始和完成,以便管理混凝土的放置。 版权所有(C)2013,JPO&INPIT
    • 9. 发明专利
    • Method of control for precooling of casting concrete
    • 浇注混凝土预处理方法
    • JP2007130971A
    • 2007-05-31
    • JP2005328734
    • 2005-11-14
    • Iwatani Internatl CorpToda Constr Co Ltd岩谷産業株式会社戸田建設株式会社
    • HASHIMOTO MASAAKIINABA SHINYANARITA TADAYOSHINONOME HIROSHITANAKA TORUSOFUE SHUICHI
    • B28C7/00B28C5/42C04B40/00
    • PROBLEM TO BE SOLVED: To make a cooling unit smaller and simpler, achieve a more accurate temperature control for precooling and realize an easier method of control.
      SOLUTION: The method of control for precooling of casting concrete comprises pouring ready-mixed concrete into the drum 2 of the truck agitator 1, spraying a liquified gas through liquified gas spray nozzle 3 in the drum 2 while agitating, calculating the relationship between the temperature drop of the ready-mixed concrete and the amount of the sprayed liquified gas by adjusting the amount of the spray, setting the surface temperature detection spots 4, 4, ... on more than one spots on the surface of the drum 2 for detecting the temperatures corresponding to the temperature of the ready-mixed concrete in the drum 2 to enable a convertive determination of the temperature of the ready-mixed concrete from the surface temperatures of the surface temperature detection spots 4, 4, ... measured by non-contact thermometers and controlling the amount of the liquified gas sprayed into the drum 2 from the calculated values and the measured values of the surface temperatures to obtain a desired precooling temperature.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了使冷却单元更小更简单,可以实现更准确的预冷温度控制,实现更简单的控制方法。 解决方案:铸造混凝土的预冷控制方法包括将预拌混凝土浇注到卡车搅拌器1的滚筒2中,同时搅拌,将液化气体通过液化气喷嘴3喷射到滚筒2中,计算关系 在预拌混凝土的温度下降与通过调节喷雾量之间喷射的液化气体的量之间,将表面温度检测点4,4,...设置在滚筒表面上的多于一个点上 2,用于检测与滚筒2中的预拌混凝土的温度相对应的温度,以便能够根据表面温度检测点4,4,...的表面温度来转换确定预混混凝土的温度 通过非接触式温度计测量并根据计算值和表面温度的测量值控制喷射到滚筒2中的液化气体的量以获得欲望 d预冷温度。 版权所有(C)2007,JPO&INPIT