    • Method of repairing crack in mortar or concrete at radioactive waste disposal plant
    • 在放射性废物处理厂修复碎屑或混凝土中的裂纹的方法
    • JP2011196806A
    • 2011-10-06
    • JP2010063462
    • 2010-03-19
    • Denki Kagaku Kogyo KkToda Constr Co Ltd戸田建設株式会社電気化学工業株式会社
    • SEKINE ICHIROSEKIGUCHI TAKASHIYAMADA TSUTOMUISHIDA HIDEOHIRANO KENKICHI
    • G21F9/36E02D37/00G21F9/34
    • PROBLEM TO BE SOLVED: To provide a method of repairing a crack in mortar or concrete at a radioactive waste disposal plant in which a large effect on suppressing leaching is derived entirely against cracks up to deep portions by using an injection material which can be injected up to deep portions of fine cracks of 0.5 mm or less in mortar or concrete at a radioactive waste disposal plant.SOLUTION: An injection material containing ultrafine particles of spherical silica and water is injected into a crack in mortar or concrete at a radioactive waste disposal plant, and the ultrafine particles of spherical silica of the injection material filled from a surface layer up to deep portions of the crack are hardened by reaction with calcium leaching from the mortar or concrete. The concentration of the ultrafine particles of spherical silica is preferably more than 60% in the injection material.
    • 要解决的问题:提供一种修复放射性废物处理厂的砂浆或混凝土中的裂纹的方法,其中通过使用可注射的注射材料,完全不产生对抑制浸出的大的影响,从而破裂到深部 在放射性废物处理厂的砂浆或混凝土中的0.5mm以下的细裂纹的深部.SOLUTION:将含有球形二氧化硅和水的超细颗粒的注射材料注射到放射性废物处理厂的砂浆或混凝土裂缝中 并且通过与来自砂浆或混凝土的钙浸出的反应而使从表面层填充到裂纹的深部的注入材料的球形二氧化硅的超细颗粒硬化。 在注射材料中,球状二氧化硅的超微粒子的浓度优选大于60%。
    • 3. 发明专利
    • Time management system for concrete placement and the time management method
    • 混凝土时间管理系统和时间管理方法
    • JP2012229529A
    • 2012-11-22
    • JP2011096923
    • 2011-04-25
    • Toda Constr Co Ltd戸田建設株式会社
    • SATO IKUUMEMOTO MUNEHIROKATSUKI YASUKIIDO YASUHIROTATENO TAKANOBUBABA ASAYUKIHATA NAOTOTANAKA TORUYAMADA TSUTOMU
    • E04G21/00B28B1/08
    • PROBLEM TO BE SOLVED: To provide a time management system for concrete placement, which solves the problems in conventional time management systems for concrete placement that manual recording for each placement layer by an operator is time-consuming and erroneous due to negligence of measurement or recording, or misdescription of the time of placement on a consolidated fresh concrete.SOLUTION: A time management system 1 for concrete placement comprises an acceleration sensor device 3 which is set in a construction area 4 for placing concrete in a formwork so as to detect the vibration of a vibrator for compaction in use during concrete placement, a radio transmission device on the side of concrete placement site which is connected to the acceleration sensor device 3, a radio receiver on a management side which receives data from the radio transmission device, a management server 6 connected to the radio receiver, and a terminal computer 6b connected to the management server. The acceleration sensor device 3 detects the initiation and completion of the vibration of the vibrator for the management of concrete placement.
    • 要解决的问题:为了提供用于混凝土浇筑的时间管理系统,其解决了常规时间管理系统中用于具体放置的问题,操作者对于每个铺设层的手动记录是由于过度的错误而耗时和错误的 测量或记录,或者是将混合新拌混凝土放置时间的错误描述。 解决方案:用于混凝土浇筑的时间管理系统1包括加速度传感器装置3,该加速度传感器装置3设置在用于将混凝土置于模板中的结构区域4中,以便在混凝土浇筑期间检测振动器用于压实的振动, 与加速度传感器装置3连接的混凝土配置位置侧的无线发送装置,从无线发送装置接收数据的管理侧的无线接收机,连接到无线接收机的管理服务器6,以及终端 计算机6b连接到管理服务器。 加速度传感器装置3检测振动器的振动的开始和完成,以便管理混凝土的放置。 版权所有(C)2013,JPO&INPIT