会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Pulse detection device, and pulse detection method
    • 脉冲检测装置和脉冲检测方法
    • JP2009284042A
    • 2009-12-03
    • JP2008131543
    • 2008-05-20
    • Nec Electronics CorpNecエレクトロニクス株式会社
    • KASHIWAGI YOSHIKI
    • H03K5/19H03K5/153
    • H03K5/1252
    • PROBLEM TO BE SOLVED: To highly accurately detect a pulse signal.
      SOLUTION: A pulse detection device 1 detects a pulse signal including an intermediate potential during a predetermined period. The pulse detection device 1 is provided with a signal fixing means for fixing the intermediate potential of the pulse signal at a low level or a high level. The signal fixing means is preferably a pull-down resistor 9 or a pull-up resistor which is connected to an input signal line to which the pulse signal is input. A pulse detection method includes a signal fixing step of fixing the intermediate potential of the pulse signal at the low level or the high level.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:高精度地检测脉冲信号。 解决方案:脉冲检测装置1在预定时段内检测包括中间电位的脉冲信号。 脉冲检测装置1设置有用于将脉冲信号的中间电位固定在低电平或高电平的信号固定装置。 信号固定装置优选地是连接到输入脉冲信号的输入信号线的下拉电阻器9或上拉电阻器。 脉冲检测方法包括将脉冲信号的中间电位固定在低电平或高电平的信号固定步骤。 版权所有(C)2010,JPO&INPIT
    • 2. 发明专利
    • Method for verifying delay time
    • 验证延迟时间的方法
    • JP2005242697A
    • 2005-09-08
    • JP2004052048
    • 2004-02-26
    • Nec Electronics CorpNecエレクトロニクス株式会社
    • YAMAMOTO HIROSHIKASHIWAGI YOSHIKI
    • G06F17/50H01L21/82H04L12/26
    • G06F17/5022
    • PROBLEM TO BE SOLVED: To provide a delay time verification method capable of verifying whether delay time in a section to be verified satisfies prescribed timing restriction or not even when the reverse phenomenon of a temperature characteristic appears.
      SOLUTION: The delay time of the verification section is calculated by using a delay time MIN table 11 prepared at the minimum temperature in an operation guarantee range at first (step S11). Then the delay time of the verification section is calculated by using a delay time MIN table 12 prepared at the maximum temperature in the operation guarantee range (step S12). Then whether the delay time of the verification section satisfies the prescribed timing restriction or not is verified by using the shorter delay time out of the delay time calculated in the step S11 and the delay time calculated in the step S12 (step S13).
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种延迟时间验证方法,即使当出现温度特性的反向现象时,能够验证待验证的部分中的延迟时间是否满足规定的时序限制。 解决方案:首先通过使用在最低温度下制备的延迟时间MIN表11来计算验证部分的延迟时间(步骤S11)。 然后,通过使用在操作保证范围内的最高温度下准备的延迟时间MIN表12来计算验证部的延迟时间(步骤S12)。 然后,通过使用在步骤S11中计算的延迟时间中的较短的延迟时间和在步骤S12中计算的延迟时间来验证验证部分的延迟时间是否满足规定的时序限制。 版权所有(C)2005,JPO&NCIPI