会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Hot water supply system
    • 热水供应系统
    • JP2009058169A
    • 2009-03-19
    • JP2007225145
    • 2007-08-31
    • Noritz CorpNoritz Electronics Technology Kkノーリツエレクトロニクステクノロジー株式会社株式会社ノーリツ
    • OKAMOTO SHINICHIKISHIMOTO TOMOKIKIMURA ENRYUKONISHI DAISUKEHOU TAKAOYAMAGUCHI HIDEKIKAMIYOSHI EIJI
    • F24H1/10
    • PROBLEM TO BE SOLVED: To provide a hot water supply system capable of stably supplying hot water without misjudging a gas meter as gas leakage even when an emergency operation is started due to failure of a system controller.
      SOLUTION: When the system controller SC controlling a plurality of water heaters WH1-WH6 can be normally operated, a delay time from establishment of combustible conditions in each water heater to execution of combustion start processing, is set in advance to each of the water heaters WH1-WH6 from the system controller SC, and the delay times are respectively stored in non-volatile storing means of the water heaters WH1-WH6. When a power source of each water heater is reset in accompany with the failure of the system controller SC, a timing of the combustion start processing is delayed according to the delay time set in each of the water heaters WH1-WH6 to prevent the combustion operations from being simultaneously started.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种能够稳定地供应热水的热水供应系统,即使当由于系统控制器的故障而开始紧急操作时,也不会误判燃气表作为气体泄漏。 解决方案:当控制多个热水器WH1-WH6的系统控制器SC可以正常工作时,从建立每个热水器中的可燃状态到执行燃烧开始处理的延迟时间预先设置为 来自系统控制器SC的热水器WH1-WH6和延迟时间分别存储在热水器WH1-WH6的非易失性存储装置中。 伴随着系统控制器SC的故障而使每个热水器的电源复位时,根据在每个热水器WH1-WH6中设置的延迟时间来延迟燃烧开始处理的时间,以防止燃烧操作 从同时开始。 版权所有(C)2009,JPO&INPIT
    • 8. 发明专利
    • Bath device
    • 浴室装置
    • JP2008224096A
    • 2008-09-25
    • JP2007060618
    • 2007-03-09
    • Noritz Corp株式会社ノーリツ
    • YAMASHITA SATOSHISAKATA TAKESHITSUJI EIICHIKONISHI DAISUKEHOU TAKAOSHIMIZU TAKEHIRO
    • F24H1/00
    • PROBLEM TO BE SOLVED: To provide a bath device capable of making the heat retention of bathtub water and freeze proofing compatible even in a bathtub of a high-heat insulating specification.
      SOLUTION: A heat retention interval of a heat-retention interval timer is changed to "60 minutes" longer than an ordinary one by a Dip switch and the like. When the hot water supply is completed, a heat-retention time timer and the heat-retention interval timer are started. Whether freeze proofing conditions are satisfied or not is monitored while performing heat-retention reheating at each time-up of 60 minutes as a rule, and processing for interrupt freeze proofing processing is simultaneously continued when the conditions are satisfied. However, the heat retention reheating is not performed for the first 20 minutes since there is no possibility of freezing, and the heat-retention reheating is performed as the freeze proofing processing when the outside air temperature becomes lower than 1°C for 20-45 minutes, and when the outside air temperature becomes lower than 3°C for 45-60 minutes.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种即使在高绝热规格的浴缸中也能够使浴缸水的保温性和防冻性相容的浴装置。 解决方案:通过Dip开关等将保温间隔定时器的保温间隔改变为比普通保持间隔更长的“60分钟”。 当热水供应完成时,启动保温时间定时器和保温间隔定时器。 通常在60分钟的时间内进行保温再加热时,是否满足防冻条件的情况,并且当满足条件时,同时继续进行中断防冻处理。 然而,由于不存在冻结的可能性,所以在前20分钟内不进行保温再加热,当外部空气温度变得低于1℃20-45时,进行保温再加热作为防冻处理 分钟,外部空气温度低于3℃时45-60分钟。 版权所有(C)2008,JPO&INPIT
    • 9. 发明专利
    • Piping structure of jet bath
    • 喷气机管道结构
    • JP2003275117A
    • 2003-09-30
    • JP2002078913
    • 2002-03-20
    • Noritz Corp株式会社ノーリツ
    • HOU TAKAOMORIKAWA SATOSHI
    • A47K3/00A61H23/00
    • PROBLEM TO BE SOLVED: To use an outlet pipe made of a flexible material with a large hanging preventive force and strength larger than a rubber tube, etc., to reduce the number of connecting components or hanging preventive holders, etc., to be used, to facilitate the piping work, and to maintain the quality just as the initial piping design for a long period of time for facilitating the maintenance work.
      SOLUTION: A nozzle 2 for jetting circulation hot water with bubbles into a bathtub 1 is provided on a wall part 3 of the bathtub 1. The outlet pipe 5 made of the flexible material for hot water circulation is connected to a short piping connection part 4 of the nozzle 2 exposed to the outside of the bathtub 1. The piping connection part 4 is formed inclined viewed straight from the wall part 3 of the bathtub 1, and the outlet pipe 5 is connected diagonally to the piping connection part 4.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题为了使用具有大的悬挂力和强度大于橡胶管等的柔性材料制成的出口管,以减少连接部件或悬挂防止件等的数量, 用于促进管道工作,并保持质量,就像初期的管道设计一样长时间,以方便维护工作。 解决方案:在浴缸1的壁部3上设置有用于将带有气泡的循环热水喷射到浴缸1中的喷嘴2.由用于热水循环的柔性材料制成的出口管5连接到短管道 喷嘴2的连接部分4暴露于浴缸1的外部。管道连接部分4从浴缸1的壁部3直接倾斜地形成,并且出口管5与管道连接部分4对角地连接 版权所有(C)2003,JPO