会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • SHEATHING WORK FOR EXCAVATED TRENCH AND SHEETING THEREFOR
    • JPS5873623A
    • 1983-05-02
    • JP17106681
    • 1981-10-26
    • NIPPON STEEL CORPNIPPON STEEL METAL PROD
    • HIRANO MASATOOOHASHI KAZUHIKOENMEI YOSHIOMORITA AKIHIRO
    • E02D17/08
    • PURPOSE:To safely and efficiently perform a sheathing work by a method in which a sheeting provided with a jack is hung down by a wire between sheet pile holders facing each other in two stages (upper and lower stages) along the inner wall of an excavated trench for a gas tube, etc., and sheet piles are erected under the guidance of the sheeting. CONSTITUTION:A trench 1 for a gas tube is excavated, and connecting metal tools 2 of angular steel pipes are hung down in two stages (upper and lower stages) horizontally by means of a wire rope 3, arranged facing the inner wall of the trench 1 at intervals in the longitudinal direction of the trench 1, and fixed by fixing the rope 3 to the hanging receiver 4 of the trench 1. Then, a sheeting 9 formed by providing jacks 7 between ends of sheet pile holders 5 and by connecting bearing metals 7a on both ends with the ends of the holders 5 by pins 8 is hung down in the trench 1, and then the connecting metals 2 are fitted into the ends of the holders 5 and connected with pins 8. A light- weight sheet pile 10 is erected between the inner wall of the trench 1 and the holders 5, the trench 1 is further excavated to a given depth while penetrating the sheet pile 10, and the jacks 7 are extended to attain a sheathing work. Then, the hanging receiver 4 is removed.
    • 2. 发明专利
    • SHEATHING WORK AND HOLDING FRAME FOR EXCAVATED TRENCH
    • JPS5865821A
    • 1983-04-19
    • JP16314781
    • 1981-10-13
    • NIPPON STEEL CORPNIPPON STEEL METAL PROD
    • HIRANO MASATOOOHASHI KAZUHIKOMATSUI KIYOSHIENMEI YOSHIO
    • E02D17/08
    • PURPOSE:To exactly prevent the disintegration of soil and sand by a method in which a sheathing holding frame consisting of rectangular frames of a smaller width than that of an excavated trench is hung down and held in the excavated trench, sheet piles are erected, a waling is provided to hold the sheet piles, and then the sheathing holding frames are removed. CONSTITUTION:When burying a gas tube, a given width of a trench 1 is excavated in the road, and then sheathing holding frames 2 consisting of rectangular frames of a smaller width than that of the trench are hung down and held horizontally in two stages at an adequate interval by a manner that a wire rope 4 hooked on knobs 3 at fours places before and behind and right and left on the internal side of the holding frame 2 is fixed to an angular steel pipe 5 laid the opening edge of the trench 1. Then, sheet piles 6 are erected between the trench 1 and the sheathing holding frame 2 and the trench 1 is further excavated to a given depth while pressing down the sheet piles 6. Afterwards, walings 7 are attached horizontally in two stages to the sheet piles 6, cut beams 8 are laid on the walings 7 to hold the sheet piles 6, and then the sheathing holding frame 2 is removed from the trench 1.