    • METHOD AND APPARATUS FOR ERECTING MAIL CABLE FOR SUSPENSION BRIDGE OR THE LIKE
    • JPH0261209A
    • 1990-03-01
    • JP21339688
    • 1988-08-26
    • KOBE STEEL LTD
    • KUWAMOTO SHUNICHISUGII KENICHI
    • E01D11/00E01D11/02E01D19/16E01D21/00
    • PURPOSE:To make it possible to start work for temporary pulling on a transfer line by laterally transferring main cable's strand, drawn out on a draw-out line after completion of the drawing out, to transfer rollers provided on a transfer line that is placed on the top of a tower in parallel with the draw-out line. CONSTITUTION:After drawing out a strand 1 along each of draw-out rollers 10 of a draw-out line 11, slack of the drawn-out strand 1 is pulled in. then a supporting frame 21 is lifted up by operation of a lift cylinder 23 and through rise of a jack rod 24, and the drawn-out strand 1 is made afloat over the rollers 10 under free-hanging condition along the whole span of its extension. The drawn-out strand is then transferred horizontally to the side of a transfer line 20 by operation of a travelling cylinder 25. After rollers 11 and 19 are placed levelling each other, the supporting frame 21 is lowered and the strand 1, stretching over each of the draw-out rollers 10, is transferred to ride on each of the transfer rollers 19 of the transfer line 20. Therefore, it becomes possible to start, on the transfer line 20, works for temporary pulling that follow fitting of the temporary pulling clamps.