会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Joint structure of steel pipe pile and a pair of pliers
    • 钢管连接结构和一对钢管
    • JP2005344510A
    • 2005-12-15
    • JP2005256421
    • 2005-09-05
    • Nippon Steel CorpTokyo Electric Power Co Inc:The新日本製鐵株式会社東京電力株式会社
    • WADA SHUJISAKAMOTO HIROSHIKOMATSU AKIRATOYOFUKU KOJI
    • E02D7/20
    • PROBLEM TO BE SOLVED: To provide a technology of excellent workability using a steel pipe pile of a large bearing force as a foundation in a simpler and inexpensive joint structure and a joint method of a steel pipe pile and a column member.
      SOLUTION: The joint structure of the steel pipe pile and a pair of pliers in construction by a rotary press-in pile method comprises a ring flange 2 stuck to the upper end of the steel pipe pile 1, and the pliers comprising a connecting flange 61 formed at the lower end of a cylindrical body 60 formed with almost the same diameter as the steel pipe pile 1. The ring flange 2 and the connecting flange 61 are joined and fixed to perform construction by the rotary press-in pile method. After construction, the pliers are removed from the steel pipe pile 1, and the ring flange 2 stuck to the upper end of the steel pipe pile 1 is used as the foundation of a temporary iron tower, a scaffolding iron tower, or the like.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:以较简单且便宜的接头结构以及钢管桩和柱构件的接合方法,以大的承载力的钢管桩为基础,提供优异的加工性的技术。 解决方案:通过旋转式压入桩方式,钢管桩和一对钳子的接合结构包括粘附在钢管桩1的上端的环形凸缘2,并且钳子包括一个 形成在与钢管桩1的直径几乎相同的圆筒体60的下端的连接凸缘61.环形凸缘2和连接凸缘61接合固定,通过旋转压入桩方法 。 施工结束后,从钢管桩1上取下钳子,将作为钢管桩1的上端的环形凸缘2用作临时铁塔,脚手架铁塔等的基础。 版权所有(C)2006,JPO&NCIPI
    • 3. 发明专利
    • Pile support device of inclined shaft inclination adjusting device in full revolving all casing machine
    • 全套翻转机器的嵌入式轴承调整装置的支撑装置
    • JP2004308249A
    • 2004-11-04
    • JP2003103266
    • 2003-04-07
    • Nippon Steel Corp新日本製鐵株式会社
    • TAKEGAWA KEIGOTOYOFUKU KOJIYAMASHITA AKIRAAKASHI YUZO
    • E21B7/20E02D7/16E02D7/22
    • PROBLEM TO BE SOLVED: To perform rotary press-in construction while stably and surely supporting a rotary press-in steel pipe pile as an inclined shaft by an all casing machine. SOLUTION: This full revolving all casing machine inserts the rotary press-in steel pipe pile 1 having a spiral blade 14 in a lower part into a machine body via a pile inserting hole 77 of an upper face plate 76 of the full revolving all casing machine slantingly arranged at a prescribed angle; and repeats upwardly moving operation by releasing fastening of the pile outer periphery after a rotary and liftable chuck 28 moves downward by a prescribed stroke while applying torque by fastening the outer periphery of the steel pipe pile 1; and is constituted so that an inclination adjusting tool 65 constituted by installing an inclined shaft run-out preventing and support member 68 in a tool body 67, is arranged on the upper face plate 76; and adjusted to and positioned in a prescribed part of the upper face plate 76 by a positioning means such as a rope 66 to adjust an inclination of the steel pipe pile 1 positioned in a pile inserting part 83 of the machine body by applying the support member 68 to the outer periphery of the steel pipe pile 1. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过全套机器稳定且可靠地支撑旋转压入钢管桩作为倾斜轴,进行旋转压入施工。 解决方案:这种全旋转全套机将具有螺旋叶片14的旋转压入钢管桩1通过上面板76的整个旋转的桩插入孔77插入下部, 所有套管机器倾斜设置在规定的角度; 通过在旋转和可升降卡盘28向下移动规定行程之后释放紧固桩外周而重复向上移动操作,同时通过紧固钢管桩1的外周施加转矩; 构成为在上面板76上配置倾斜调节工具65,该倾斜调整工具65是将倾斜轴防止脱落支承部件68安装在工具主体67上而构成的。 并通过诸如绳索66的定位装置调节并定位在上面板76的规定部分中,以通过施加支撑构件来调节位于机体的桩插入部分83中的钢管桩1的倾斜度 68钢管桩1的外围。版权所有(C)2005,JPO&NCIPI