    • 4. 发明专利
    • Dry-process quenching apparatus for coke
    • 干式干燥设备
    • JPS5757786A
    • 1982-04-07
    • JP13303580
    • 1980-09-26
    • Nippon Kokan Kk
    • USAMI YOUJIROUMATSUDA TOSHIHARUKATADA TOSHINOBUSAITOU MASAKI
    • C10B39/02
    • PURPOSE: To build up the titled apparatus which is economical and in which safety and efficiency are high, by a method wherein red hot coke is supplied to a plurality of main bodies of quenching furnaces by means of the slewing motion of a girder, said main bodies being provided at equal distances from the guided center of the girder.
      CONSTITUTION: On both sides of a grider crane 26 having a grider 25, the main bodies 26, 26 of quenching furnaces are provided in such a manner that their furnace centers are adjusted with each other at equal distances from the guided center 31 of the girder 25. A bucket 5 containing red hot coke is put on a truck 30, and moved to a lifting position, where the bucket 5 is lifted by the hoisting mechanism 27 of the girder 25. The girder 25 is revolved upon its shaft 31 in a 90° arc and in a required direction to position the bucket just above the quenching furnace 26, and then the red hot coke in the bucket 5 is thrown into the furnace 26.
      COPYRIGHT: (C)1982,JPO&Japio
    • 目的:为了建立经济,安全高效的标题装置,通过利用大梁的回转运动将红热焦炭供给多个淬火炉主体的方法,所述主体 主体距梁的引导中心相等距离设置。 构成:在具有砂轮25的砂轮起重机26的两侧,淬火炉的主体26,26以这样的方式设置,使得它们的炉中心彼此相距距离大梁的引导中心31相等的距离 将含有红热焦炭的桶5放在卡车30上,并移动到提升位置,在该提升位置,通过大梁25的提升机构27将铲斗5提升。大梁25以其轴31为中心旋转 90度 电弧并且在所需方向上将铲斗定位在淬火炉26的正上方,然后将桶5中的红热焦炭投入炉26中。
    • 5. 发明专利
    • DRY EXTINGUISHING METHOD FOR COKE
    • JPS56151784A
    • 1981-11-24
    • JP5363080
    • 1980-04-24
    • NIPPON KOKAN KK
    • USAMI YOUJIROUKATADA TOSHINOBUTAKADA MASAFUMI
    • C10B39/02
    • PURPOSE:In a dry extinguishing furnace for coke, the secondary cooling gas is blown from the undermost part of the gas-blowing funnel in the cooling chamber to extend the cooling zone, thus enabling the contraction of the volume of the cooling chamber, resulting in increase in the cooling efficiency of the dry extinguishing of coke. CONSTITUTION:In a dry extinguisher for coke, the first cooling gas inlet 12 is formed with funnels 11 and 11a beneath the furnace 10. The circulation gas is heat exchanged, sent through a ring pipe 13 and the inlet 12 into the chamber and distributed by the distributor 15 on the center, thus cooling the red-heated coke in the furnace. Then, the secondary cooling gas is blown in through another inlet 22 for the secondary cooling gas at the undermost end of the funnel 11 and/or through the third inlets 23 on the upper hopper 18 which is placed beneath the funnel 11. The cooled coke is cut out by the cutting gate 17 into the upper hopper 18 and sent out to the lower hopper 20 by opening the upper trap 19.
    • 6. 发明专利
    • METHOD FOR ADHERING RING TO BUBBLING LANCE
    • JPS6256514A
    • 1987-03-12
    • JP19474285
    • 1985-09-05
    • NIPPON KOKAN KK
    • KATADA TOSHINOBUHAMAZAKI NARUO
    • C21C7/10B22D1/00
    • PURPOSE:To rationalize the work for adhering rings to a lance by mortar by providing a ring support device to a carriage for assembling the lance. CONSTITUTION:The rings 5 inserted onto a lance steel pipe 4 are assembled over the carriage 10 while the rings are held supported by ring 5 supporters 17. Such assembly is fixed onto a working floor by simultaneously hoisting the top end of the steel pipe 4 and the end brace 18 of the top end of a shaft 16 and inserting the rod into a hole 13d of guide 13b of a gripper 13a for the lance base part 4a at the bottom end in the adhering work place. Ring 5 supporting rings 17a which contact with stopper plates 17c of the supporters 17 are then rotated successively from the lower side around the shaft 16 and the rings 5 are dropped by each piece. The mortar is coated atop the rings 5 by utilizing the spacings generated between the rings 5 and 5 and the ring 5 upper than the coated ring is dropped thereonto so that the rings are adhered. The above-mentioned rod is removed when the adhesion of 4-5 pieces of the rings 5 is completed. The lance, etc. are lowered and when a guide 20 for fixing the lower lance comes to the position of the working floor, the rod is inserted into the guide 20 to fix the lance. The adhesion and assembly of all the rings 5 are completed by the same procedures mentioned above.
    • 8. 发明专利
    • Dry-process quenching apparatus for coke
    • 干式干燥设备
    • JPS5757783A
    • 1982-04-07
    • JP13303180
    • 1980-09-26
    • Nippon Kokan Kk
    • MATSUDA TOSHIHARUUSAMI YOUJIROUKATADA TOSHINOBU
    • C10B39/02
    • Y02P20/129
    • PURPOSE: To keep boiler function even when coke can not be cut down from lower part and to prevent the residence of gas in a furnace, by a method wherein in a cooling gas-forced circulation system the downstream side of a waste-heat boiler is connected to the top part of a furnace, and a by-pass pipe line is provided which is opened as the occasion demands.
      CONSTITUTION: The downstream side of a waste-heat boiler 25 is connected to the top part of a quenching furnace 25, and a by-pass pipe line 43 is provided which is opened as the occasion demands. When the supply of cooling gas becomes impossible by a trouble, an on-off valve 45 is adjusted and an on-off valve 44 is opened. The cooling gas is passed through the by-pass pipe line 43 into a duct 42, and then into the top part 38 of the furnace. Then the gas is contacted with red hot coke which is placed within a prechamber 25A and is not quenched under normal conditions. The gas heated to a high temperature is forcedly recycled through a throughhole 30, a circular gas 29, a duct 32, a waste-heat boiler 31 and a blower 34 to the by-pass pipe line 43. In this way, the same quantity of heat as during normal operation can be supplied to the waste-heat boiler 31. Since the recycling of the gas is continued, the prechamber is prevented from being filled with combustion gas.
      COPYRIGHT: (C)1982,JPO&Japio
    • 目的:即使当焦炭不能从下部被切割并且防止气体在炉中停留时,为了保持锅炉功能,通过一种方法,其中在冷却气体强制循环系统中,废热锅炉的下游侧 连接到炉的顶部,并且设置旁通管线,其根据需要打开。 构成:废热锅炉25的下游侧连接到淬火炉25的顶部,并且设有旁通管路43,其根据需要打开。 当难以供应冷却气体时,调节开关阀45并打开开关阀44。 冷却气体通过旁通管路43进入管道42,然后进入炉的顶部38。 然后气体与放置在预室25A内的红热焦炭接触,并且在正常条件下不淬火。 加热到高温的气体通过通孔30,圆形气体29,管道32,废热锅炉31和鼓风机34被强制循环到旁通管路43中。以这种方式,相同量 可以在废热锅炉31中提供正常操作时的热量。由于气体的再循环持续,所以防止了预燃室被燃烧气体填充。