会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明专利
    • CONSTRUCTION METHOD FOR UNDERGROUND CONTINUOUS WALL
    • JPH04285208A
    • 1992-10-09
    • JP7444591
    • 1991-03-15
    • KUMAGAI GUMI CO LTD
    • TOYOIZUMI HIDEOHIROMURA OSAMUHORIUCHI HARUO
    • E02D5/18
    • PURPOSE:To avoid the occurrence of poor replacement of slurry and bleeding and to check slurry from penetrating the ground by placing self-hardening slurry in a groove hole formed in the ground, and stirring the same while an accelerating agent is added thereto. CONSTITUTION:The ground 10 is dug to form a groove hole 16 while a stabilizer is filled therein, and a reinforcing member 18 such as an iron member, a reinforcing steel cage, PC plate or the like is built up in the groove hole 16. Self- hardening slurry 20 such as a material made by mixing at least one of clay, dug earth, sand, coal ash and an admixture, water and a solidifying agent is placed in the groove hole 16 to replace the stabilizer with the slurry 20. Subsequently, air is sent through an air compressor 30 and an air pipe 32 to generate air bubbles 28, thereby mixing the slurry 20, The remaining stabilizer is mixed with the slurry 20 and the groove hole 16 is filled with the above mixture to construct an underground continuous wall formed by a solidified material of the slurry which has no remaining stabilizer in the interior and little structural weak point.
    • 9. 发明专利
    • GROUND IMPROVEMENT METHOD AND DEVICE THEREOF
    • JPH04194213A
    • 1992-07-14
    • JP32266490
    • 1990-11-28
    • KUMAGAI GUMI CO LTD
    • HISHINUMA NOBORUHORIUCHI HARUONAGASAWA TAKESHISAKA HIDEMASA
    • E02D3/11
    • PURPOSE:To efficiently improve the ground and shorten the construction period by arranging a heating means having a heating body in the recess formed on the ground with banking, further charging sand around the heating means, and supplying electric power to heat the heating body. CONSTITUTION:A recess 14 of prescribed depth penetrating banking 12 banked on the ground is formed. A heating means of long pillar-like lengthy body longer than the depth of the recess 14 and having a heating body extending in lengthwise direction is arranged so as to conform the lengthwise direction with the depth direction of the recess 14, and sand 18 is charged around it. Next, electric power is supplied from a power source 20 to heat the heating body, generated heat is conducted to the sand 18, and water content in the sand 18 is heated and evaporated, Accompanied with the evaporation, water content in the ground 10 around the recess 14 is let flow to the sand 18 in order to evaporate, and hence the ground 10 is dehydrated. Hereby, without generation of pollution-causing substance, ground improvement can be performed with simple construction and in a short period.