    • JP2012197559A
    • 2012-10-18
    • JP2011060729
    • 2011-03-18
    • Kajima CorpSooki:KkFuji Bussan Kk富士物産株式会社株式会社ソーキ鹿島建設株式会社
    • SATO MASAAKISHIGENAGA AKIHIROITO YUJIFUKUYA YOSHINORIHAGIWARA TOMOHISATANAKA MASAYOSHIIMAOKA SHINJINOBUHARA KOJITOMITA SHOJIKASHIWA TADANOBU
    • E21D11/40
    • PROBLEM TO BE SOLVED: To provide a method for smoothly guiding a support to a prescribed position and improving position accuracy of support building-up while improving work efficiency of the support building-up.SOLUTION: A tunnel support guiding and building method is for holding supports 4L and 4R by a holding part of an erector device 1, guiding them to the vicinity of a face 5 of a tunnel and building them. Erector targets E1 and E2 are attached to the holding part of the erector device 1, support targets S1-S4 are attached to upper ends and lower ends of the supports 4L and 4R, positions of the erector targets E1 and E2 are measured, the erector device 1 is controlled on the basis of the positions of the erector targets E1 and E2, and the supports 4L and 4R are guided to the vicinity of the face 5. Then, positions of the support targets S1-S4 are measured, the erector device 1 is controlled on the basis of the positions of the support targets S1-S4 at the upper ends or lower ends of the supports 4L and 4R, and the supports 4L and 4R are guided to design positions and built up.
    • 要解决的问题:提供一种能够将支撑件平滑地引导到规定位置并提高支撑构造的位置精度的方法,同时提高支撑构件的工作效率。 解决方案:隧道支撑引导和建造方法是用一个竖立装置1的固定部分来保持支承件4L和4R,将它们引导到隧道的表面5附近并进行建造。 升降器目标E1和E2连接到竖立装置1的保持部分,支撑目标S1-S4连接到支撑件4L和4R的上端和下端,测量对象E1和E2的位置,竖立器 装置1根据竖立装置对象E1和E2的位置进行控制,并且将支撑件4L和4R引导到面部5附近。然后,测量支撑对象S1-S4的位置,竖立装置 基于支撑件4L和4R的上端或下端的支撑对象S1-S4的位置来控制图1,并且支撑件4L和4R被引导到设计位置并构建。 版权所有(C)2013,JPO&INPIT
    • 3. 发明专利
    • Tunnel construction information projection method
    • 隧道施工信息投影方法
    • JP2012184568A
    • 2012-09-27
    • JP2011047401
    • 2011-03-04
    • Kajima CorpSooki:Kk株式会社ソーキ鹿島建設株式会社
    • YOKOO ATSUSHIKOIKE TATSUOKAJISA FUKASHITANAKA MASAYOSHITOMITA SHOJIYAMAMOTO TOMOHIDE
    • E21D9/00G01C15/00
    • PROBLEM TO BE SOLVED: To provide a tunnel construction information projection method capable of increasing an information amount to be displayed on a face surface when constructing a tunnel and largely contributing to the support of tunnel construction.SOLUTION: By using a system comprising a personal computer 20 for storing projection data to be projected on a face surface and setting and outputting a reduction scale in the horizontal direction and vertical direction of the projection data and a projector 10 for performing projection on the face surface on the basis of input from the personal computer 20, a step of determining a reduction scale setting value for the horizontal direction and storing the horizontal direction reduction scale setting value while projecting line data in the horizontal direction, a step of determining a reduction scale setting value for the vertical direction and storing the vertical direction reduction setting value while projecting line data in the vertical direction, and a step of setting the reduction scale in the horizontal direction and the vertical direction on the basis of the stored horizontal direction reduction scale setting value and vertical direction reduction scale setting value and projecting construction information data as the projection data, are executed.
    • 要解决的问题:提供一种隧道施工信息投影方法,其能够在构造隧道时增加在表面上显示的信息量,并且在很大程度上有助于隧道施工的支持。 解决方案:通过使用包括个人计算机20的系统,用于存储要投影在表面上的投影数据,并且在投影数据的水平方向和垂直方向上设置和输出缩小比例,以及用于执行投影的投影仪10 基于来自个人计算机20的输入,在水平方向上确定缩小比例设定值并存储水平方向缩小比例设定值的步骤,同时在水平方向上投影线数据的步骤,确定步骤 垂直方向的缩小比例设定值,并且在垂直方向上投影线数据的同时存储垂直方向缩小设定值,以及基于存储的水平方向设定水平方向和垂直方向的缩小比例的步骤 缩小比例设定值和垂直方向缩小比例设定值和项目 执行作为投影数据的构造信息数据。 版权所有(C)2012,JPO&INPIT
    • 4. 发明专利
    • Tunnel construction information projection system
    • 隧道施工信息投影系统
    • JP2013023960A
    • 2013-02-04
    • JP2011161571
    • 2011-07-25
    • Sooki:Kk株式会社ソーキ
    • TANAKA MASAYOSHITOMITA SHOJIYAMAMOTO TOMOHIDE
    • E21D9/10
    • PROBLEM TO BE SOLVED: To provide a tunnel construction information projection system capable of increasing the amount of information displayed a cutting face during construction of a tunnel and capable of largely contributing to supporting of the construction of the tunnel.SOLUTION: An inventive tunnel construction information projecting system for supporting construction of a tunnel by projecting information relating to the construction on a cutting face comprises: a personal computer 20 which stores data to be projected on the cutting face; a projector 10 which is connected with the personal computer 20 and performs the projection on the cutting face on the basis of input from the personal computer 20; and a total station 30 which radiates a specified reference point to the cutting face. The personal computer 20 corrects the data on the basis of the reference point on the cutting face radiated by the total station 30, generates corrected data for projection, and inputs the corrected data to the projector 10.
    • 要解决的问题:提供一种隧道施工信息投影系统,其能够增加在隧道施工期间显示切割面的信息量,并能够大大有助于支撑隧道的施工。 解决方案:一种用于通过在切割面上投影与构造有关的信息来支撑隧道施工的创新的隧道施工信息投影系统包括:个人计算机20,其存储要投影在切割面上的数据; 投影机10,其与个人计算机20连接,并且基于来自个人计算机20的输入在切割面上进行投影; 以及将指定的参考点辐射到切割面的全站仪30。 个人计算机20基于由全站仪30发射的切割面上的参考点校正数据,生成用于投影的校正数据,并将校正的数据输入到投影仪10.版权所有(C)2013 ,JPO&INPIT