会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明专利
    • TUNNEL DIG-DOWN METHOD
    • JPH1150778A
    • 1999-02-23
    • JP21050197
    • 1997-08-05
    • KUMAGAI GUMI CO LTD
    • KAKIUCHI YUKIOMIMURA TOMOOKITAHARA SHIGEOGOTO MAKOTO
    • E21D9/01E21D9/00
    • PROBLEM TO BE SOLVED: To improve safety and work efficiency by digging right and left grooves by a trencher introduced into the upper half part of a tunnel, placing concrete in the grooves to form right and left side walls of the lower half part of the tunnel, and then digging between the right and left side walls to construct the lower half part of the tunnel. SOLUTION: At the time of digging down the upper half part 11A of a tunnel to construct the lower half part, or at the time of digging down the existing tunnel to be widened downward, first a trencher 12 is introduced into the upper half part 11A of the tunnel or the existing tunnel, and two lines of right and left grooves 14L, 14R are digged by the trencher 12. Subsequently, concrete is placed in the grooves 14L, 14R to for the left side wall 21L and the rigth side wall of the lower half part or the widened part of the tunnel. The space between the right and left side walls is digged to construct the lower half part or the widened part of the tunnel. Thus the work efficiency can be improved and at the time of digging, the natural ground at the back can be retained by the right and left side walls so as to improve the safety.