会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • CONSTRUCTION METHOD FOR UNDERGROUND SKELETON
    • JP2002081084A
    • 2002-03-22
    • JP2000269221
    • 2000-09-05
    • KAJIMA CORP
    • TANAKA SHUNPEITAKAHASHI TAKASHISUZUKI KOICHIMIZUTANI AKIRAOUCHI YOSHIOISANO KENUDA YUKIO
    • E02D17/04E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To minimize temporary materials by using permanent girders of an underground body structure and a movable shore strut timbering for an underground construction timbering, to reduce the scale of an earth retaining wall by suppressing the deformation and stress generated in the earth retaining wall, and to reduce the construction term by simultaneously progressing the construction of the underground skeleton to be the timbering and the ground excavation. SOLUTION: This underground skeleton is constituted by repeating the following processes in order: a process of disposing the movable shore strut timbering 1 in a primary excavation space, introducing preload to the earth retaining wall by a jack device 6, disposing the permanent girders 2 and 3 for a floor for the underground body structure, suspending and supporting movable permanent girders 3-1 and 3-2 for the underground floor from/to the first-floor permanent girders 2 by the rod 50 of a suspension device, and excavating the lower part of the strut timbering 1 from this initial state; a process of contracting a flat shape of the shore strut timbering 1 by the jack device 6 from a state where the floor of the permanent girders of the upper part is constructed to function as the timbering; a process of lowing the shore strut timbering 1 by the vertical slide device 4; a process of expanding the flat shape of the shore strut timbering 1 and introducing preload to the earth retaining wall; and a process lowering the underground-floor permanent girders by the vertical slide device 4.
    • 5. 发明专利
    • STRUCTURE OF PILE HEAD PART
    • JP2001011853A
    • 2001-01-16
    • JP18603299
    • 1999-06-30
    • KAJIMA CORP
    • SAITO HAJIMEYOSHIMATSU TOSHIYUKIKOBAYASHI MINORUMIYAMOTO MAKOTOISANO KENKATO TAKASHI
    • E02D5/34E02D27/12
    • PROBLEM TO BE SOLVED: To contrive the small diameter of a beam cross section by attaching a steel pipe-made band having a small diameter part on a pile head part to be constructed by cast-in-place concrete and reducing stress due to bending moment transmitted from the pile head part to a foundation beam. SOLUTION: An inverted funnel-like steel-made band 4 having a small diameter part (d) and a taper part 4a is attached to the head part (a) of a foundation pile 1, the connection part of a foundation pile 1, a foundation beam 2 and a column 3 is not in a complete restraint rigid joining state, and made the pin joining state of a degree of restraint of zero. Thus, high durability and stiffness (toughness and deformation capability) are displayed due to confined effect by a steel-made band 4 and the buckling suppression effect of the steel- made band 4 by concrete. Even when large horizontal force acts on the pile head part (a), the bending moment of the end of the pile head part (a) due to the horizontal force is not larger than the case of the rigid joining state of complete restraint. Thereby the cross section of the foundation beam 2 need not be enlarged more than necessary, and execution and economy can be improved.
    • 6. 发明专利
    • SLIDE TYPE EARTH RETAINING TIMBERING SYSTEM
    • JP2002081070A
    • 2002-03-22
    • JP2000269222
    • 2000-09-05
    • KAJIMA CORP
    • TAKAHASHI TAKASHITANAKA SHUNPEIUDA YUKIOOUCHI YOSHIOISANO KENIWATA NORIHIKO
    • E02D17/04E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To minimize temporary materials by using a permanent girder of an underground body structure and a slide type earth retaining timbering system for an underground construction timbering, to reduce the scale of an earth retaining wall by suppressing the deformation and stress generated in the earth retaining wall, and to reduce the construction term by simultaneously progressing the construction of the underground skeleton to be the timbering and the ground excavation. SOLUTION: This slide type earth retaining timbering system is constituted of a movable strut timbering 1 horizontally disposed in an excavation space in the earth retaining wall W and supporting the earth retaining wall W, and a vertical slide device 4(a) sliding down the strut timbering along a temporary prop P. The strut timbering 1 is constituted of a wale 11 urged against the earth retaining wall, a strut joining block 13 having a hole capable of being inserted by the temporary prop P, and a jack device 6 pushing and pulling the wale relative to the earth retaining wall. When the deformation of the earth retaining wall is small after completing the excavation, the strut timbering 1 is quickly slid down and erected near the excavation bottom.