会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • WATER DEPTH GROUND IMPROVEMENT METHOD
    • JPH09273145A
    • 1997-10-21
    • JP8225996
    • 1996-04-04
    • CHEMICAL GROUT COKAJIMA CORP
    • KUBO HIROAKISUZUKI SHIGETAKAHAYAKAWA YASUYUKI
    • E02D3/12E02D15/06
    • PROBLEM TO BE SOLVED: To provide a ground improvement method capable of constructing a block- shaped ground improvement body at high speed without causing environmental pollution in sea area or water basin. SOLUTION: A casing pipe 3 for bearing a hardener spouting pipe 4 having a monitor on the front end thereof on the center section with a centralizer is prepared. Then, the casing pipe 3 is conveyed to a specific position with a barge and is penetrated under the bottom of the sea with a vibro-hammer, a superhigh pressure jet J is jetted in the horizontal direction from the monitor on the front end of the hardener spouting pipe 4 at the same time as the penetration to cut earth and sand to move, the water level in the casing pipe 3 is lowered with difference in specific gravity between the inside and outside of the casing pipe 3, an air pipe and a discharge pipe are inserted into the casing pipe 3, compressed air A is jetted out from the air pipe to lead slime S to the inside of the exhaust pipe with an air-lift, the slime is sucked with a pump to discharge from the discharge pipe, the casing pipe 3 is pulled out up to specific length when it reaches specific depth, at the same time, the expansible hardener spouting pipe 4 is extend, and land formation is made with the superhigh pressure jet J, at the same time, to repeat the cycle for pulling out the casing pipe at specific speed to develop.
    • 10. 发明专利
    • EXCAVATION WALL CONSTRUCTION METHOD
    • JP2000297590A
    • 2000-10-24
    • JP10886099
    • 1999-04-16
    • CHEMICAL GROUT CO
    • SUZUKI SHIGETAKA
    • E02D17/04E21D1/03E21D5/00
    • PROBLEM TO BE SOLVED: To provide an excavation wall construction method requiring no earth retaining timbering for performing construction or reconstruction in a narrow space and for lowering a construction time and a construction cost. SOLUTION: This excavation wall construction method includes the following processes; an excavating building process in which a plurality of box column row walls 5 connecting working box column walls 3 installed in the four corners to each other are arranged and built in predetermined positions, a PC steel wire inserting process in which a plurality of PC steel wires 7 are curved arcuately so as to be inserted for penetrating the continuously built working box column walls 3 and the box column row walls 5, a PC steel wire straining process in which both ends in each of the PC steel wires 7 are pulled so as to be fixed to the working box column walls 3, a column wall inside concrete placing process in which concrete is charged and placed in all the working box column walls 3 and the box column row walls 5, and a shaft excavating process in which the inside of the excavation wall is dug for forming a space.