    • Long periodic wave height reducing structure installing construction method in port
    • 长周期波高减速结构在港口安装施工方法
    • JP2007016406A
    • 2007-01-25
    • JP2005196461
    • 2005-07-05
    • Penta Ocean Constr Co Ltd五洋建設株式会社
    • OSHIMA KAORITAJIMA YOSHIMITSUKOZUKA MASAYUKIMORIYA YOICHI
    • E02B3/04
    • PROBLEM TO BE SOLVED: To provide a construction method for installing a long periodic wave height reducing structure in a port to be installed in a sea bottom position for further effectively reducing the wave height.
      SOLUTION: A wave field calculation is made by taking into consideration a long periodic wave in the port, and a position of a node of an overlapping wave of the long periodic wave is grasped from the wave height distribution of a long periodic wave component in a calculation result of its wave field. Arrangement to the water bottom of a water permeable wave dissipating structure consuming energy by passing a water particle is designed with the position of its node as a standard. The wave height reducing effect of the long periodic wave is verified by making the wave field calculation in the port when installing the water permeable wave dissipating structure in a planned position based on the design. When recognizing the wave height reducing effect, installation of the water permeable wave dissipating structure is determined on that position, and the water permeable wave dissipating structure is installed.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种在安装在海底位置的端口中安装长周期波浪降低结构的构造方法,以进一步有效地降低波高。 解决方案:通过考虑端口中的长周期波来进行波场计算,并且从长周期波的波高分布中掌握长周期波的重叠波的节点的位置 其波场的计算结果中的分量。 以其节点的位置作为标准,设计通过通过水粒子消耗能量的透水波浪消散结构的水底的布置。 基于设计,将透水波浪消散结构安装在规划位置时,通过在端口中进行波场计算来验证长周期波的波浪降低效果。 当识别波浪降低效果时,在该位置确定透水波浪消散结构的安装,并安装透水波浪消散结构。 版权所有(C)2007,JPO&INPIT
    • 5. 发明专利
    • Design method for fixed sand bypass system
    • 固定砂轮旁路系统的设计方法
    • JP2006207121A
    • 2006-08-10
    • JP2005016499
    • 2005-01-25
    • Penta Ocean Constr Co Ltd五洋建設株式会社
    • TAJIMA YOSHIMITSU
    • E02F3/88
    • PROBLEM TO BE SOLVED: To provide a design method capable of optimizing the installed quantity and positions of pumps used for dredging beforehand when a fixed sand bypass system is installed and also minimizing the installation cost and operation cost of the system.
      SOLUTION: This design method for the fixed sand bypass system performing the dredging and moving of drift sand piled near a coast comprises a step for calculating the distribution of the amount of drift sand near the coast, a step for calculating the optimum position of a dredging pump corresponding to the distribution of the amount of drift sand, a step for calculating cost when the dredging pump is optimally disposed, and a step for calculating the installed number of dredging pumps based on the cost.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够在安装固定式沙子旁路系统时事先优化用于疏浚的泵的安装量和位置的设计方法,并且还使系统的安装成本和操作成本最小化。 解决方案:用于执行在海岸附近堆积的漂砂的疏浚和移动的固定砂旁路系统的设计方法包括计算海岸附近漂移砂量分布的步骤,计算最佳位置的步骤 对应于漂砂量的分布的疏浚泵,用于计算疏浚泵最佳设置时的成本的步骤,以及基于成本计算疏浚泵的安装次数的步骤。 版权所有(C)2006,JPO&NCIPI