会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Precast concrete member for parapet part of training wall of dam and method of manufacturing the same
    • DAM的训练场的PARAPET部分的预制混凝土构件及其制造方法
    • JP2010126977A
    • 2010-06-10
    • JP2008302308
    • 2008-11-27
    • Fujita Corp株式会社フジタ
    • HIRANO KATSUSATOSASAYA TERUMASAOTA HIROMICHINAKANISHI TADASHIMIZUNO MAKOTOKOJIMA AKIHONDA SHIGERU
    • E02B7/00
    • PROBLEM TO BE SOLVED: To reduce high lift dangerous works by precasting the parapet part of a training wall top part and streamline the construction of the training wall formed in a complicated shape when the training wall of a dam is constructed. SOLUTION: This precast concrete member 20 for the parapet part of the training wall of the dam includes a base 21 joined to the top part 11b of the training wall body 11 of the dam and an extension part 22 extending from the base 21 so as to extend from the top part 11b with the base 21 joined to the top part 11b. A connection hole 23 through which a connection member 13 projecting from the top part 11b can be inserted and a consolidation material injection hole 24 for injecting a consolidation material 14 into the gap between the mutually opposed surfaces of the base 21 and the top part 11b are formed in the base 21. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:通过预制训练墙顶部的护栏部分来减少高层起重危险作业,并且在建造坝的训练墙时,简化形成复杂形状的训练墙的施工。 解决方案:用于大坝训练墙的护栏部分的预制混凝土构件20包括:接合到坝的训练壁体11的顶部11b的基部21和从基部21延伸的延伸部22 从顶部11b延伸,基部21接合到顶部11b。 可以插入从顶部11b突出的连接构件13可以插入的连接孔23和用于将固结材料14注入到基部21的相互相对的表面之间的间隙中的固结材料注入孔24和顶部11b, 形成于基地21.版权所有(C)2010,JPO&INPIT
    • 4. 发明专利
    • Construction method for concrete overhang part
    • 混凝土结构施工方法
    • JP2004092098A
    • 2004-03-25
    • JP2002252487
    • 2002-08-30
    • Fujita Corp株式会社フジタ
    • HIRANO KATSUSATOSASAYA TERUMASANAKANISHI TADASHITAKITANI MAKOTO
    • E02B7/00E02B7/02E02B8/00E04B2/86
    • PROBLEM TO BE SOLVED: To enhance the workability of an execution method for an overhang part using a precast concrete form.
      SOLUTION: The precast concrete form 10 is split into two parts, that is, an upper form 10a and a lower form 10b. The upper form 10a and the lower form 10b are assemblably arranged in a working yard and the like, and assembled in the state in which steel such as H-shaped steel is mounted on the upper form 10a, the lower form 10b and the like, that is, in the state in which timbering 13 is applied to the upper form 10a, the lower form 10b and the like. The form 10 after assembly is fixed with a nut through the use of a steel bar 18 with a thread-shaped knot on the side of a concrete structure 17. After fixation, second stage concrete 25 is placed so that the concrete overhang part A can be constructed.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提高使用预制混凝土形式的悬伸部分的执行方法的可操作性。 解决方案:预制混凝土形式10分为两部分,即上部形式10a和下部形式10b。 上部形式10a和下部形式10b组装在工作场地等中,并且在H形钢等钢被安装在上部形状10a,下部形状10b等上的状态下进行组装, 也就是说,在将木材13施加到上部形状10a,下部形状10b等的状态下。 组装后的形式10通过在混凝土结构17侧使用具有螺纹状结的钢筋18,用螺母固定。固定后,放置第二级混凝土25使得混凝土突出部分A可以 被建造。 版权所有(C)2004,JPO