会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method and device for designing concrete or mortar
    • 用于设计混凝土或泥浆的方法和装置
    • JP2011157760A
    • 2011-08-18
    • JP2010021462
    • 2010-02-02
    • Landes Co LtdOkayama Univランデス株式会社国立大学法人 岡山大学
    • AYANO KATSUNORIHOSOYA TAKEFUJII TAKASHI
    • E03F3/04
    • PROBLEM TO BE SOLVED: To provide a method and a device for economically and rationally designing concrete or mortar for use in an atmosphere of a sulfuric acid.
      SOLUTION: The concrete or the mortar is immersed in the sulfuric acid with a predetermined concentration; a correlationship between the product of the concentration of the sulfuric acid and an immersion period, and the depth of the erosion of the concrete or the mortar by the sulfuric acid is kept grasped (step S1); durable years and the concentration of the sulfuric acid in the assumed installation environment of the concrete or the mortar are assumed (step S2); and the thickness of cover concrete or mortar for reinforcements is designed based on the durable years and the concentration of the sulfuric acid, and the correlationship (step S3).
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种经济合理地设计用于硫酸气氛的混凝土或砂浆的方法和装置。

      解决方案:将混凝土或砂浆以预定浓度浸入硫酸中; 掌握硫酸浓度与浸渍时间的关系以及硫酸对混凝土或砂浆的侵蚀深度的关系(步骤S1)。 假定在混凝土或砂浆的假定安装环境中硫酸的浓度是耐久的(步骤S2); 增强件覆盖混凝土或砂浆的厚度根据耐用年份和硫酸浓度及相关性(步骤S3)进行设计。 版权所有(C)2011,JPO&INPIT

    • 2. 发明专利
    • Side ditch block and drainage canal constructed by joining the same
    • 通过加工方式构建侧面排水沟和排水沟
    • JP2009007889A
    • 2009-01-15
    • JP2007172151
    • 2007-06-29
    • Landes Co Ltdランデス株式会社
    • OTSUKI TAKAYUKI
    • E03F5/04
    • PROBLEM TO BE SOLVED: To provide a side ditch block having an upper stage waterway and a lower stage waterway.
      SOLUTION: In the side ditch block 1, a sectionally U-shaped body 2 extending in a sectionally perpendicular direction and having a bottom face as the lower stage waterway 211, a flange part 3 protruding from one upper edge 221 of the body 2 in the sectional direction of the body 2 and having an upper face as the upper stage waterway 301, and an eave part 4 protruding from the other upper edge 231 of the body 2 in the sectional direction of the body 2 are integrally formed of concrete. The flange part 3 protrudes near the inside face of the body 2 having the other upper edge 231 to form a rainwater drop clearance 31 between the end face of an protruding destination and the inside face of the body 2 having the other upper edge 231. The eave part 4 protrudes right over the rainwater drop clearance 31 to form a rainwater inflow opening 41 between the end face lower edge or the lower face of a protruding destination and the end face upper edge or the upper face of a protruding destination of the flange part 3.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种具有上级水路和下级水路的侧沟块。 解决方案:在侧沟槽块1中,沿截面垂直方向延伸并具有底面作为下层水路211的截面U形体2,从主体的一个上边缘221突出的凸缘部3 2在主体2的截面方向上并具有作为上段水道301的上表面,并且从主体2的另一个上边缘231沿主体2的横截面方向突出的檐部4由混凝土一体地形成 。 凸缘部分3在具有另一个上边缘231的主体2的内表面附近突出,以在突出目的地的端面与具有另一个上边缘231的主体2的内表面之间形成雨水滴隙31。 檐部4在雨滴间隙31的右方突出,在突出目的地的端面下缘或下面与凸缘部的突出目的地的端面上缘或上表面之间形成雨水流入口41 3.版权所有(C)2009,JPO&INPIT
    • 3. 发明专利
    • Tunnel constructing precast beam, tunnel constructing precast column, tunnel constructing precast bottom slab, and tunnel construction method
    • 隧道建设预制梁,隧道建筑预制柱,隧道建筑预制底板和隧道施工方法
    • JP2007056512A
    • 2007-03-08
    • JP2005241696
    • 2005-08-23
    • Landes Co Ltdランデス株式会社
    • OTSUKI TAKAYUKIFUJITSUKA TOYOHIROMATSUOKA SATOSHI
    • E21D11/08E03F3/04
    • PROBLEM TO BE SOLVED: To provide a tunnel constructing precast member which is not only light in weight and easy to be transported and mounted, but also low in thermal stress generated in the member when manufactured or during application, and low in cross sectional force caused by a dead load, and proof against cracking. SOLUTION: A tunnel constructing precast beam 110 which is erected in the width direction of a tunnel for constructing the ceiling of the tunnel has a groove 111 which is formed on a front surface and/or a rear surface and extends in a longitudinal direction. A tunnel constructing precast column 120 erected for constructing the side wall of the tunnel, and a tunnel constructing precast bottom slab 130 laid along the width direction of the tunnel for constructing the bottom of the tunnel may have the same structure as that of the precast beam. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种不仅重量轻且易于运输和安装的隧道施工预制构件,而且在制造或施工期间在构件中产生的热应力低,并且十字形交叉 由静载引起的截面力,防止开裂。 解决方案:在隧道的宽度方向竖立的隧道构造预制梁110用于构造隧道的天花板,其具有形成在前表面和/或后表面上并且纵向延伸的凹槽111 方向。 竖立用于构造隧道侧壁的隧道施工预制柱120以及沿隧道的宽度方向铺设的用于构造隧道底部的隧道构造预制底板130可以具有与预制梁相同的结构 。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Laying block
    • 层块
    • JP2006009520A
    • 2006-01-12
    • JP2004191886
    • 2004-06-29
    • Landes Co Ltdランデス株式会社
    • OTSUKI TAKAYUKIOTSUKA TAKUJITANAKA HIDEKAZUFUJIKI AKIHIROYAMADA SHOJI
    • E01C11/24E01C5/06E01C5/22E01C15/00
    • Y02A30/64
    • PROBLEM TO BE SOLVED: To provide a laying block by which merits are enhanced and demerits are corrected in a conventional paving material like a wooden block, a concrete block in which wood chips or the like are used for the surface layer, or a water-permeable paving, and by which wear resistance (an anti-abrasion property) and strength needed as a road surface paving material are improved while assuring a water retaining property and water permeability.
      SOLUTION: A wood chip concrete is used as a base layer of a general-purpose interlocking block and a water-permeable concrete is used as a surface layer to form multi-layers. It is particularly preferable that the wood chip concrete used as the base layer is set to be 25 to 75 pts. vol. of the total volume.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种铺设块,通过这样的铺设块,在木块的常规铺路材料中,将木屑等用于表面层的混凝土块,或者将木屑等用于表面层的混凝土块,提高矫正和校正, 透水铺路,同时确保作为路面铺路材料所需的耐磨性(抗磨损性)和强度,同时确保保水性和透水性。 解决方案:使用木屑混凝土作为通用互锁块的基层,并且使用透水性混凝土作为表层以形成多层。 特别优选将用作基底层的木屑混凝土设定为25〜75个点。 第一卷。 的总量。 版权所有(C)2006,JPO&NCIPI
    • 8. 发明专利
    • EARTH RETAINING WALL CONSTRUCTION METHOD AND EARTH RETAINING WALL BLOCK USING THE SAME
    • JP2003232047A
    • 2003-08-19
    • JP2002030098
    • 2002-02-06
    • LANDES CO LTD
    • OTSUKI TAKAYUKIONO SHUJI
    • E02D29/02
    • PROBLEM TO BE SOLVED: To provide an earth retaining wall construction method by which natural ground can be protected and the earth retaining wall can be inexpensively constructed in a high efficiency without necessity of construction of a scaffold and blocks appropriate for the same. SOLUTION: A part of lower natural ground between upper stage block groups connected in the lateral direction of the upper part of the slope face is excavated to form an excavated slope face and an unexcavated natural ground. A part of the lower stage block groups and the upper stage block groups is vertically integrated. Next, an unexcavated natural ground left in the lateral direction of the lower stage block groups and in the lower aside of the upper stage block groups is excavated and formed. While a series of processes where other lower stage block groups are arranged and vertically and laterally integrated, is repeated in several times in the vertical and horizontal directions, the retaining wall is constructed downwards from above in the retaining wall construction method. A gap 11 for placing concrete having a concrete-placing opening 5 is formed above by the retaining wall construction method and a stay slab 8 obliquely formed in the front face via a beam 12, and a filling part 10 is formed at the back of the stay slab, in the retaining wall block. COPYRIGHT: (C)2003,JPO