会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • Greening system for folded plate roof
    • 折叠板屋顶绿化系统
    • JP2005068800A
    • 2005-03-17
    • JP2003299830
    • 2003-08-25
    • Fujita CorpHunet Inc株式会社ヒューネット株式会社フジタ
    • UCHIYAMA NAOAKIOKAMOTO SUMIYASUKURA MASAYUKIOKAMOTO TARO
    • A01G1/00A01G7/00E04D13/00
    • Y02A30/254Y02B80/32
    • PROBLEM TO BE SOLVED: To provide a greening system for a folded plate roof which is very simply and can be quickly constructed without impairing any function such as a drainage or the like of a folded plate roof.
      SOLUTION: The greening system 10 for the folded plate roof is constituted by including a metallic folded plate roof 12, a vegetation layer 14 and a reticulate member 16. The reticulate member 16 is laid on a large number of projected sections 12A of the folded plate roof 12 and is fixed by a mounting member 20. The vegetation layer 14 is constituted of a water permeable layer 32 having a soil holding function holding soil and permeability and mounted on the reticulate member 16, a soil layer 34 laid on the water permeable layer 32 and a vegetation mat 36 laid on the soil layer 34. The vegetation mat 36 is pushed against the soil layer 34 side by a holding member 40.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为折叠板屋顶提供一种绿化系统,其非常简单且可以快速构建,而不会损害折叠板屋顶的任何功能,例如排水等。 解决方案:折叠板屋顶的绿化系统10由包括金属折叠板屋顶12,植被层14和网状构件16构成。网状构件16铺设在大量的突出部分12A 折叠板屋顶12并由安装构件20固定。植被层14由具有保持土壤和渗透性的土壤保持功能的水可渗透层32构成,并且安装在网状构件16上, 透水层32和埋在土壤层34上的植被垫36.植被垫36由保持构件40推靠在土壤层34侧。版权所有(C)2005,JPO&NCIPI
    • 5. 发明专利
    • PRECAST CONCRETE STAIR
    • JPH07207863A
    • 1995-08-08
    • JP84394
    • 1994-01-10
    • FUJITA CORP
    • KURA MASAYUKI
    • E04F11/02
    • PURPOSE:To obtain excellent workability by disposing PC wall tread members, in which treads are protruded horizontally from the side faces of wall boards, in rows on a footing beam and coupling head connecting materials onto the top surfaces of each wall board while joining PC stair landings on receiving beams. CONSTITUTION:PC wall tread members A are built on connecting reinforcements 5 disposed in upright on a footing beam B, and joined with the footing beam B through mechanical reinforced joints buried at the lower ends of wall boards. A PC head connecting material C is dropped in extending over the top-section connecting reinforcements 3 of the wall boards of each PC wall tread member A, and the PC wall tread members A are bonded and stair-landing receiving beams Dare joined with the side faces of the wall boards. Stair landings E are set onto the stair-landing receiving beams D and connected through welding joints 6 while the stair landings E are joined with a building corridor F through the welding joints 6. Accordingly, the term of work is shortened, and the accuracy of execution can be improved.
    • 8. 发明专利
    • Carry-in/carry-out system
    • 携带/携带系统
    • JP2009190829A
    • 2009-08-27
    • JP2008032508
    • 2008-02-14
    • Fujita Corp株式会社フジタ
    • OKAMOTO SUMIYASUKURA MASAYUKIYAMAOKA HIROSHIANDO TOSHIHIROGOCHO SHINTAROINABA TERUO
    • B65G67/02
    • PROBLEM TO BE SOLVED: To provide a carry-in/carry-out system capable of effectively preventing outside air from blowing into a building during a carry-in/carry-out work, transferring and unloading a cargo from a transport vehicle by an overhead crane to a predetermined part of a main area in the building, and directly loading a cargo to the transport vehicle by the overhead crane from a predetermined part in a main area.
      SOLUTION: The carry-in/carry-out system comprises an opening/closing booth 2 which is installed in a building while being located on the inner side of a carry-in/carry-out entrance 11a to be opened and closed by a door, and capable of demarcating a cargo carry-in/carry-out area 2A isolated from a main area in the building, and the overhead crane 3 provided movably in the building via an upper side of the opening/closing booth 2. The opening/closing booth 2 is composed of a plurality of movable segments 21, 22 having canopies and telescopically overlapped while the transport vehicle is advanced therein. The movable segments 21, 22 are opened and closed by movement in a sliding door manner.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种携带/进出系统,其能够有效地防止在携带/携带工作期间外部空气吹入建筑物,从运输车辆转运和卸载货物 通过起重机到建筑物的主区域的预定部分,并且通过起重机从主区域中的预定部分直接将货物装载到运输车辆。

      解决方案:进/出运送系统包括一个安装在建筑物内的打开/关闭舱室2,该打开/关闭舱室2位于待打开和关闭的进/出口11的内侧上 并且能够划分与建筑物中的主要区域隔离的货物搬运/搬运区域2A,以及通过开闭舱2的上侧可移动地设置在建筑物内的起重机3。 打开/关闭台2由多个具有檐篷的可动部21,22构成,并且在运送车辆前进时能够伸缩地重叠。 可动部21,22以滑动门的方式通过移动而打开和关闭。 版权所有(C)2009,JPO&INPIT

    • 10. 发明专利
    • PRECAST CONCRETE STAIR
    • JPH07207862A
    • 1995-08-08
    • JP84294
    • 1994-01-10
    • FUJITA CORP
    • KURA MASAYUKI
    • E04F11/02
    • PURPOSE:To shorten the term of work by joining and contacting PC stair wall boards in upper and lower floors, engaging receiving beams to the engaging recessed sections of the wall boards and connecting treads, in which stair landings are unified. CONSTITUTION:PC stair wall boards A in upper and lower floors are built, and the upper end sections of the reinforcements 1 protruded from the top surface of the PC stair wall board A in the lower floor mechanical type reinforced joints 2 at the lower end sections of the reinforcements 1 of the PC stain wall board A in the upper floor are connected. A PC receiving beam B is fitted into the engaging recessed section 3 of the wall board A, a tread C with a PC stair landing 5 is placed and fixed onto the PC receiving beam B, and the stair landing 5 is welded to a building corridor D section. Accordingly, workability is improved extremely, and the term of work can be shortened.