会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • BUILDING METHOD FOR UNDERGROUND BODY FOR BUILDING
    • JPH04194121A
    • 1992-07-14
    • JP32102990
    • 1990-11-27
    • FUJITA CORP
    • YAMAMOTO ITSUOHAMAZUKA SEIJIKOBAYASHI KATSUMIMARU TAKAHIRO
    • E02F7/00E02D27/10E02D29/045E21D13/00
    • PURPOSE:To improve work executing ability of an underground body by a method wherein after excavation down to a given depth is executed, a stage is assembled and fixed to structural central columns and a landslide protection wall through jacks, the stage is acted as a strut, and used for excavation of the whole surface of a ground below the stage and construction of an upper slab and a beam. CONSTITUTION:A landslide protection wall 1 forming an underground outer wall and a pile and structural central columns 3 to support a pile 2 below an inside column and upper concrete are built from a ground surface part. After first stage excavation is completed, a stage 4 is fixed in a position to the central columns 3 and the landslide protection wall 1 by means of jacks 5 and 6. An excavator previously mounted on the under surface of the stage 4 is operated to excavate a ground below the under surface of the stage 4. Excavated soil is discharged by means of an excavated soil horizontal and vertical conveying member interlocking with movement of an excavator 7. Meanwhile, by means of the stage serving as a support bed, forms for a slab 11 and a beams 12 are frames and reinforcing bars are arranged to place concrete. After concrete of the slab 11 is cured, hydraulic jacks 5 and 6 are contracted, the stage 4 is lowered to a given position, and a preceding process is repeated. This method performs high-efficient discharge of excavated soil, ensures safety of a work, and executes a work even at a soft ground without any trouble.
    • 3. 发明专利
    • METHOD AND DEVICE FOR CONSTRUCTION OF LANDSLIDE PROTECTION WALL
    • JPH028415A
    • 1990-01-11
    • JP15790588
    • 1988-06-28
    • FUJITA CORP
    • YAMAMOTO ITSUOHAMAZUKA SEIJI
    • E02D17/04
    • PURPOSE:To inhibit the deformation and stress of a landslide protection wall at small values, and to decrease the number of the stages of all timberings at the time of large depth by lowering two stages of the upper and lower timberings while the landslide protection wall is suppressed alternately in a measuring worm manner and advancing excavation. CONSTITUTION:Primary excavation is executed in an extent that the deformation of a landslide protection wall 1 is not increased, and two stages of upper and lower timberings A, A' are installed into an excavation section. Secondary excavation is conducted, and the lower-stage timbering A is brought down near an excavation surface B by a jack and fixed. A normal timbering C1 at a first stage is mounted to the upper section of the upper-stage timbering A', and the upper-stage timbering A' is lowered up to the upper section of the lower-stage timbering A by the jack. Excavation, the descent of the lower- stage timbering A, falling near the lower-stage timbering A of the upper-stage timbering A', and the installation of the normal timbering to the upper section of the upper-stage timbering A' are repeated, and excavation is advanced.
    • 9. 发明专利
    • LOAD TESTING METHOD OF CAST-IN-PLACE PILE AND DEVICE THEREOF
    • JPH03176509A
    • 1991-07-31
    • JP31427889
    • 1989-12-05
    • FUJITA CORP
    • YAMAMOTO ITSUOHAMAZUKA SEIJIKOBAYASHI KATSUMIMARU TAKAHIRO
    • E02D5/36E02D13/06G01L5/00
    • PURPOSE:To measure easily and economically by applying water pressure to an elastic pressure bag to load a bottom protective case to the ground, and measuring a quantity of settlement of the bottom protective case, water pressure and each life-free quantity of a top protective case and a pile head section. CONSTITUTION:An elastic pressure bag 4 covered with a top protective case 2 and bottom protective case 3 is loaded to the end of a case-in-place pile 1. Displacement wires 5 and 6 are respectively connected to the cases 2 and 3 to connect to displacement meters 7 and, at the same time, displacement meters 8 provided with pile head displacement measuring bars are loaded to a pile head section. After that, pressure water is poured into the bag 4 by a pressure pump 9 through an injection pipe 10, and the case 3 is pressed and loaded to the ground. A quantity of settlement of the case 3, water pressure and each lift-free quantity of the case 2 and pile head section are measured, and the relation between load of the pile end and settlement and the relation between frictional force of the circumferential surface of the pile and displacement are clearly separated from each other to measure. Accordingly, a load testing method can be easily and economically implemented.