    • 1. 发明专利
    • Hose for injecting water stop material, and method for injecting water stop material to concrete placing joint
    • 用于注射止水材料的软管,以及注射浇水材料混合浇注接头的方法
    • JP2011007223A
    • 2011-01-13
    • JP2009149103
    • 2009-06-23
    • Chugoku Fuji Kako Kensetsu KkShimizu Corp中国冨士化工建設株式会社清水建設株式会社
    • KUBO MASASHINOGUCHI TSUNEHISAONO TADASHIOKADA HIROYUKIANAZAWA KUNISHIGEKAKIZAKI TAKASHI
    • F16L11/12E04G21/02
    • PROBLEM TO BE SOLVED: To provide a hose for injecting a water stop material and method for injecting a water stop material to a concrete placing joint which can inject the water stop material to the concrete placing joint surely and suitably by preventing a flowing channel from being blocked as bleeding water or whitewash generated at the time of concrete placing flows in.SOLUTION: The hose is equipped with pipe materials 1-1 having through-holes penetrated from an inside 1b to an outside 1c, a base material 2 which has a through-hole penetrated from an inside 2b to an outside 2c and integrally holds these plural pipe materials 1-1 in such a condition that they are bundled in parallel by covering peripheries of the plural pipe materials 1-1, and nonwoven fabric 3 arranged to be piled to the base material 2 so that it may cover a part of the periphery of the base material 2. Furthermore, a hose B for water cut-off material injection is formed by applying a self-hardening material 4 on a periphery of the base material 2 excluding a part that the nonwoven fabric 3 is piled.
    • 要解决的问题:提供一种用于注射止水料的软管和一种将止水材料注入混凝土浇筑接头的方法,该混凝土浇筑接头可以通过防止流动通道不断地将混合物浇筑接头注入到混凝土浇筑接头中 阻塞在混凝土浇筑时产生的渗水或粉刷。解决方案:软管配有管道材料1-1,其具有从内部1b穿过外部1c的通孔,基材2具有通孔 从内侧2b向外部2c贯穿,并且通过覆盖多个管材1-1的周边而使这些多个管材1-1并列成一体的状态,并且将其布置成为 堆积在基材2上,使其可以覆盖基材2的周边的一部分。此外,通过将自固化材料4涂覆在基材2上而形成用于切断材料注入的软管B. 除了无纺布3的一部分以外的基材2的周边。
    • 3. 发明专利
    • Hose for grouting water cut-off material and method of grouting water cut-off material to concrete placing joint section
    • 用于组装水切割材料的软管和用于混合水切割材料以混合配置接合部分的方法
    • JP2009150074A
    • 2009-07-09
    • JP2007327234
    • 2007-12-19
    • Shimizu Corp清水建設株式会社
    • KUBO MASASHINOGUCHI TSUNEHISAONO TADASHIYOSHIDA TAKUO
    • E04G21/02
    • PROBLEM TO BE SOLVED: To provide a hose for grouting a water cut-off material and a method of grouting a water cut-off material to a concrete placing joint section capable of surely and suitably grouting the water cut-off material to the concrete placing joint section by surely preventing a flow passage from being closed due to the inflow of a bleeding water or slag produced when concrete is placed.
      SOLUTION: This hose A for grouting a water cut-off material is used to cut off water at the placing joint section T of a concrete. The hose comprises tube members 1 having through-holes 1c extending therethrough from the inner surface 1a to the outer surface 1b, respectively; a base member 2 which has a through part 2c extending therethrough from the inner surface 2a to the outer surface 2b, which covers the outer peripheries of the tube members 1, 1, and which integrally holds the tube members 1, 1 in the state of being bound parallel to each other, and a biodegradable member 3 so installed on the outer surface 2b of the base member 2 as to cover the through part 2c of the base member 2.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种用于灌浆截水材料的软管和将截水材料灌浆到能够可靠和适当地将截水材料灌浆的混凝土浇筑接头部分的方法 混凝土浇筑接头部分确保防止流道由于浇注混凝土时产生的出水或熔渣的流入而被关闭。

      解决方案:用于灌注截水材料的软管A用于切断混凝土的放置接合部分T处的水。 软管包括分别从内表面1a延伸穿过外表面1b的通孔1c的管构件1; 基部构件2具有从内表面2a延伸到外表面2b的贯穿部2c,该贯通部2c覆盖管构件1,1的外周,并且以管状构件1,1的一体状态 彼此平行地结合,以及安装在基底构件2的外表面2b上以覆盖基底构件2的贯通部2c的生物降解构件3.版权所有(C)2009,JPO&INPIT

    • 4. 发明专利
    • 鉄筋の位置決めシステム
    • 加固定位系统
    • JP2015048618A
    • 2015-03-16
    • JP2013180012
    • 2013-08-30
    • 清水建設株式会社Shimizu Corp大浦工測株式会社Oura Kosoku Kk
    • KANEMARU KIYOTOKUBO MASASHIITO TOSHIAKINAKAGAWA TAKUYAOURA AKIRA
    • E04G21/18
    • 【課題】鉄筋を設計位置に配置できるとともに、設計位置において鉄筋を組み立てることができる鉄筋の位置決めシステムを提供する。【解決手段】鉄筋11を設計位置に配置するための鉄筋の位置決めシステム1Aであって、3次元的にレーザー光21を投影するレーザー光投影装置2と、表面にレーザー光21が投影される被投影面31が形成され鉄筋11に着脱可能な被投影治具3と、を備え、被投影面31には、直線部(線状部)33,33…が複数形成され、レーザー光投影装置2は、被投影治具3が取り付けられた鉄筋11が設計位置に配置されたときの被投影治具3の2本以上の直線部33a,33aの位置に3次元的にレーザー光21を投影する。【選択図】図1
    • 要解决的问题:提供能够在设计位置布置加强件并且能够将加强件组装在设计位置的加强定位系统。解决方案:用于将加强件11布置在设计位置的加强定位系统1A包括 用于三维投影激光束21的激光束投射装置2和形成投射物面31的投影物体夹具3,用于将激光束21投射在表面上并且可附接到加强件11上,并且投影物体表面 31形成有多条直线部分(线部分)33,33等,激光束投影装置2将激光束21三维地突出在直线部分33a和 当投影物体夹具3-安装加强件11布置在设计位置时,投影物体夹具3的33a。