    • Marine structure and construction method for marine structure
    • 海洋结构海洋结构与施工方法
    • JP2009209577A
    • 2009-09-17
    • JP2008053179
    • 2008-03-04
    • Chugoku Electric Power Co Inc:ThePenta Ocean Construction Co Ltd中国電力株式会社五洋建設株式会社
    • SASAKI YUTAKAMATSUKAGE SHIGEOTAGUCHI SATOSHIKANEDA TOKIYOSHIIZUMI YUJIHAYASHI KOZOSATO TETSUYAYAZAWA TAKESHI
    • E02B3/14E02D25/00E02D27/20
    • PROBLEM TO BE SOLVED: To provide a marine structure, decreasing the complicated work process under the water to efficiently proceed with the work, and reducing the manufacturing cost such as material.
      SOLUTION: This marine structure includes: a caisson 1 laid in the sea; and a caisson foundation structure 2 provided at the bottom of the sea and serving as a sill of the caisson 1. The caisson foundation structure 2 includes: a plurality of steel pipe piles 21 driven in the bottom of the sea; caisson foundation units forming a predetermined space up to the bottom of the sea and suitable for the steel pipe piles 21; and a foundation concrete placed in the internal spaces of the caisson foundation units 20 to fix the caisson foundation structure 2. The caisson foundation unit 20 includes a caisson frame 22 formed of metal material and a tabular foundation form 28 provided on the side of the caisson frame 22, and the units are assembled on land.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了提供海洋结构,减少水下复杂的工作过程以有效地进行工作,并降低诸如材料的制造成本。

      解决方案:这种海洋结构包括:放置在海中的沉箱1; 以及设置在海底并作为沉箱1的底槽的沉箱基础结构2.沉箱基础结构2包括:在海底驱动的多个钢管桩21; 沉箱基础单元形成直到海底并且适合于钢管桩21的预定空间; 以及设置在沉箱基础单元20的内部空间中的基础混凝土,以固定沉箱基础结构2.沉箱基础单元20包括由金属材料形成的沉箱框架22和设置在沉箱侧面上的平板状基座形式28 框架22,并且单元在陆地上组装。 版权所有(C)2009,JPO&INPIT