    • 3. 发明专利
    • Method of construction of intake
    • 采食方法
    • JP2011102536A
    • 2011-05-26
    • JP2011016580
    • 2011-01-28
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • YAMADA KYOHEIHIRAOKA JUNJIMATSUKAGE SHIGEOTAKADA HIDEAKI
    • E02B9/04
    • Y02E10/22
    • PROBLEM TO BE SOLVED: To shorten the construction period and curtail the cost of construction.
      SOLUTION: An intake unit 3 comprising a caisson 4, a pneumatic lid 15 partitioning the inside of the caisson 4 into two sections, and working tubes 18, 18 which are erected on the upper part of the pneumatic lid 15 and incorporate pneumatic devices therein is manufactured on land. The intake unit 3 is transported on sea, and installed on a rock bed 30 of the seabed in the sea area of a work site. In this state, concrete is placed in the outer peripheral part of the caisson 4, and the working tubes 18 are used to compress the air in a space 14 on the lower side of the pneumatic lid 15 by the pneumatic devices. In this state, concrete is placed in the inner peripheral part of the space 14. The working tubes 18 are then removed, and the rock bed 30 is drilled toward the space 14 from the inside of a seabed intake tunnel 25 to connect the seabed intake tunnel 25 to the space 14. The pneumatic lid 15 is then removed, and an opening of the caisson 4 is closed with the lid.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:缩短施工期限,降低施工成本。 解决方案:包括沉箱4,将沉箱4的内部分成两部分的气动盖15和竖立在气动盖15的上部的工作管18,18的进气单元3,并且包括气动 其中的装置在陆地制造。 进气单元3在海上运输,并安装在工作场所海域的海床的岩床30上。 在这种状态下,混凝土被放置在沉箱4的外周部分,并且工作管18用于通过气动装置压缩在气动盖15的下侧的空间14中的空气。 在这种状态下,混凝土被放置在空间14的内周部分中。然后移除工作管18,并且从海底进气通道25的内部朝向空间14钻出岩石床30,以连接海底进气口 隧道25到空间14.然后移除气动盖15,并且用盖关闭沉箱4的开口。 版权所有(C)2011,JPO&INPIT
    • 6. 发明专利
    • Intake
    • 进气
    • JP2010185281A
    • 2010-08-26
    • JP2010101216
    • 2010-04-26
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • YAMADA KYOHEIHIRAOKA JUNJIMATSUKAGE SHIGEOTAKADA HIDEAKI
    • E02B9/04
    • Y02E10/22
    • PROBLEM TO BE SOLVED: To provide a method for simplifying installation work to considerably shorten a construction period and to reduce a construction cost regarding an intake construction method effective for an intake of an intake facility or the like for condenser cooling water of a thermal-nuclear power plant.
      SOLUTION: An intake unit 3 comprising a caisson 4, a pneumatic lid 15 partitioning the inside of the caisson 4 into two sections, and working cylinders 18, 18 which are erectly arranged in the upper part of the pneumatic lid 15, and embedded with pneumatic apparatuses is manufactured on the ground, and the intake unit 3 is transported by sea and installed on a rock bed 30 of the seabed in an area of site sea. In this state, concrete is placed in the outer peripheral section of the caisson 4, and the working cylinders 18 are used to compress air in a space 14 at the lower side of the pneumatic lid 15 by the pneumatic apparatus. In this state, concrete is placed in an inner peripheral section of the space 14. The working cylinders 18 are then removed, and the rock bed 30 is drilled toward the space 14 from the inside of a seabed intake tunnel 25 to connect the seabed intake tunnel 25 to the space 14. The pneumatic lid 15 is then removed, and an opening of the caisson 4 is closed with a lid.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种简化安装工作以显着缩短施工周期的方法,并且降低对于进气设施等的吸入设备有效的进气构造方法的冷却水冷却水的施工成本 热核电厂。 解决方案:包括沉箱4,将沉箱4的内部分成两部分的气动盖15和直立布置在气动盖15的上部的工作缸18,18的进气单元3,以及 在地面上制造嵌入有气动装置的进气单元3,并通过海运运输,并将其安装在海底的海床的岩床30上。 在这种状态下,混凝土被放置在沉箱4的外周部分中,并且工作缸18用于通过气动装置在气动盖15的下侧的空间14中压缩空气。 在这种状态下,混凝土被放置在空间14的内周部分中。然后移除工作缸18,并且从海底进气通道25的内部朝向空间14钻出岩石床30,以连接海底进气口 隧道25到空间14.然后移除气动盖15,并且用盖子关闭沉箱4的开口。 版权所有(C)2010,JPO&INPIT
    • 9. 发明专利
    • Construction method for intake
    • 建筑施工方法
    • JP2005113400A
    • 2005-04-28
    • JP2003345606
    • 2003-10-03
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • YAMADA KYOHEIHIRAOKA JUNJIMATSUKAGE SHIGEOTAKADA HIDEAKI
    • E02B9/04E02B9/06E02D23/00E02D23/06E02D25/00E02D29/09G21D1/00
    • Y02E10/22Y02E30/40
    • PROBLEM TO BE SOLVED: To shorten a construction period, and to reduce construction costs.
      SOLUTION: An intake unit 3, which is composed of a caisson 4, a pneumatic lid 15 for partitioning the inside of the caisson 4 into two sections, and working tubes 18 and 18 which are erected on an upper part of the pneumatic lid 15 and into which a pneumatic device is built, is manufactured on land. The intake unit 3 is transported by sea, and installed in baserock 30 on the sea bottom in a sea area on a job site; concrete is placed on the outer peripheral part of the caisson 4 in this state; the pneumatic device makes air compressed in a space 14 on the downside of the pneumatic lid 15 by using the working tube 18; the concrete is placed on the inner peripheral part of the space 14 in this state; after that, the working tube 18 is removed; the baserock 30 is excavated toward the space 14 from inside an undersea water-intake tunnel 25; the tunnel 25 and the space 14 are connected to each other; and after that, the pneumatic lid 15 is removed so that an opening of the caisson 4 can be closed with the lid.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:缩短施工期,降低施工成本。 解决方案:由沉箱4,用于将沉箱4的内部分成两部分的气动盖15和竖立在气动的上部的工作管18和18组成的进气单元3 在地面上制造盖15,其中构建气动装置。 进气单元3由海运运输,并安装在工作现场的海域的海底的底座30中; 在这种状态下,混凝土被放置在沉箱4的外周部分上; 气动装置通过使用工作管18使空气在气动盖15的下侧的空间14中被压缩; 在该状态下将混凝土放置在空间14的内周部上; 之后,去除工作管18; 从海底进水通道25的内部向空间14挖掘盆腔30; 隧道25和空间14彼此连接; 之后,移除气动盖15,使得可以用盖关闭沉箱4的开口。 版权所有(C)2005,JPO&NCIPI