会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Steam supply device and method
    • 蒸汽供应装置和方法
    • JP2006242522A
    • 2006-09-14
    • JP2005061868
    • 2005-03-07
    • Chugoku Electric Power Co Inc:TheHitachi Ltd中国電力株式会社株式会社日立製作所
    • MOMIKURA TADAYASUIJIRI TAKUMORIITO TAKAMASAKIDO KOJIKINOSHITA HIROYUKIUTSUNO RIICHISAITO SHUJIAOTO HIROAKI
    • F22B35/00F01D17/08F01K23/10F02G5/02
    • Y02E20/16Y02T10/166
    • PROBLEM TO BE SOLVED: To provide the technology capable of variably and quickly supplying steam in accordance with demands from the external by utilizing an existing power generating unit.
      SOLUTION: This steam supply device comprises a steam generating means 10 generating steam, a superheater 101 mounted on the steam generating means 10 for superheating the introduced water and supplying the steam, a primary turbine 11 to which the steam supplied from the superheater 101 is introduced, a reheater 102 mounted on the steam generating means 10 to introduce the steam supplied from the primary turbine 11 and to resuperheat the steam, a secondary turbine 12 to which the steam supplied from the reheater 102 is introduced, a steam supply means 32 for supplying a part of the steam introduced to the reheater 102 or the steam supplied from the reheater 102, and an adjusting means 15 for adjusting the quantity of steam introduced to the secondary turbine 12 in accordance with pressure fluctuation of the supplied steam so that combustion load of the steam generating means 10 becomes constant.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供能够根据来自外部的需求通过利用现有的发电单元来可变地和快速地供应蒸汽的技术。 解决方案:该蒸汽供应装置包括产生蒸汽的蒸汽发生装置10,安装在蒸汽发生装置10上的过热器101,用于使引入的水过热并供应蒸汽;主涡轮11,从过热器供应的蒸汽 101引入,安装在蒸汽发生装置10上的再热器102引入从主涡轮机11供应的蒸汽并重新加热蒸汽;从再热器102供应的蒸汽被引入的二次涡轮12;蒸汽供应装置 32,用于供给引入再热器102的蒸汽的一部分或从再热器102供给的蒸汽;以及调节装置15,用于根据所供应的蒸汽的压力波动来调节引入到次级涡轮机12的蒸汽的量,使得 蒸汽发生装置10的燃烧负荷变得恒定。 版权所有(C)2006,JPO&NCIPI
    • 2. 发明专利
    • Lng supply system using bulk container
    • 使用大容量集装箱的LNG供应系统
    • JP2005048789A
    • 2005-02-24
    • JP2003203096
    • 2003-07-29
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • IJIRI TAKUMORIITO TAKAMASAICHIKAWA TAKASHI
    • F17C6/00F17C9/02F17C13/08
    • PROBLEM TO BE SOLVED: To reduce cost for installation and operation of a satellite station, and to easily and quickly supply LNG (liquefied natural gas) to the satellite station by easily storing LNG in the satellite station.
      SOLUTION: This LNG supply system is provided with a means for transferring LNG stored in a LNG tank 2 provided in a shipping station 1 to a trailer type bulk container 3, a carrying means for carrying the bulk container 3 to the satellite station 4 for supplying gas to a plurality of users 9 and production equipment 10, a temporary installing means for temporarily installing the bulk container 3 in the satellite station 4, and a means for taking LNG from the bulk container 3 temporarily installed in the satellite station 4.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了降低卫星站的安装和运行成本,并且通过在卫星站中容易地储存LNG来容易且快速地向卫星站供应LNG(液化天然气)。 解决方案:该LNG供应系统设置有将储存在设置在运送站1中的LNG罐2中的LNG转移到拖车式散装容器3的装置,用于将散装容器3运送到卫星站的运送装置 4,用于向多个用户9和生产设备10供应气体;临时安装装置,用于将散装容器3临时安装在卫星站4中;以及用于从临时安装在卫星站4中的散装容器3取出LNG的装置 (C)2005,JPO&NCIPI
    • 3. 发明专利
    • Foundation structure of fuel storage tank
    • 燃料储存罐基础结构
    • JP2006118554A
    • 2006-05-11
    • JP2004305174
    • 2004-10-20
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • IJIRI TAKUMORIMATSUI ISAOICHIKAWA TAKASHI
    • F17C13/08
    • PROBLEM TO BE SOLVED: To provide a foundation structure of a fuel storage tank by which in the case of building a fuel storage tank, the tank can be installed without having any effect on existing conditions, generation of industrial waste can be reduced when it is evacuated, and repair work for the installation place is not needed.
      SOLUTION: Before the fuel storage tank is installed, a base plate 15 is laid on the surface of existing asphalt, H-steels 16 are fixed on the base plate 15, and legs 25 of the fuel storage tank (service tank) 6 are secured on the H-steels 16. The base plate 15 may be laid through mortar screen 14 applied on the asphalt surface. Displacement in the horizontal direction of the H-steels 16 may be inhibited by positioning means.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供燃料储罐的基础结构,在建立燃料储罐的情况下,可以安装罐而不对现有条件产生任何影响,可以减少工业废物的产生 疏散时,不需要安装场所的维修工作。 解决方案:在安装燃料储罐之前,在现有沥青的表面上铺设基板15,H钢被固定在基板15上,燃料储罐(维修箱) 6固定在H钢16上。基板15可以铺设在施加在沥青表面上的灰泥筛网14中。 可以通过定位装置来抑制H钢的水平方向的位移。 版权所有(C)2006,JPO&NCIPI
    • 5. 发明专利
    • Method and system for control of lng bulk container
    • 液化天然气集装箱控制方法与系统
    • JP2005075561A
    • 2005-03-24
    • JP2003308488
    • 2003-09-01
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • IJIRI TAKUMORIITO TAKAMASAICHIKAWA TAKASHI
    • F17C13/00B65G61/00F17C13/02
    • PROBLEM TO BE SOLVED: To optimize and labor-save an LNG physical distribution system by carrying and installing LNG in satellite stations in unit of bulk container and always detecting its position information/status information by a control station to monitor the positions of the satellite stations and the residual stored amount of LNG and collectively control the determination of the replacement intervals of the bulk containers.
      SOLUTION: The residual stored amount of LNG in the bulk container 3 is metered, information on the residual stored amount metered is notified to the control station 11, and information on the position and status of the satellite station 4 in which the bulk container 3 is temporarily installed are detected. The detected information on the position and status is notified to the control station 11, and based on the information on the residual stored amount, information on the position, and information on the status, an instruction for carrying another bulk container 3 filled with LNG to the satellite station 4 in which the bulk container 3 in which the residual stored amount is reduced to less than a specified value is installed is notified from the control station to a shipping station 1.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过在散货集装箱中以卫星站为单位携带和安装LNG,优化和节省LNG物流配送系统,并始终通过控制站检测其位置信息/状态信息来监控LNG的位置 卫星站和LNG的剩余存储量,并集体控制散装容器的更换间隔的确定。

      解决方案:将散装容器3中的LNG的剩余存储量计量,将关于计量的剩余存储量的信息通知给控制站11,以及关于卫星站4的位置和状态的信息,其中批量 检测到容器3暂时安装。 检测到的关于位置和状态的信息被通知给控制站11,并且基于关于剩余存储量的信息,关于位置的信息和关于状态的信息,用于承载装有LNG的另一散装容器3的指令 将其中剩余存储量减少到小于指定值的散装容器3的卫星站4从控制站通知给运送站1.版权所有(C)2005,JPO&NCIPI

    • 6. 发明专利
    • Bulk container for supply of lng
    • 大容量液化天然气供应
    • JP2005133735A
    • 2005-05-26
    • JP2003366804
    • 2003-10-28
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • IJIRI TAKUMORIITO TAKAMASAICHIKAWA TAKASHI
    • F17C13/02F17C13/12
    • PROBLEM TO BE SOLVED: To achieve safety of LNG, and optimize the physical distribution system by carrying LNG to a satellite station by the unit of bulk container to be installed, setting a control station to constantly grasp state information of the LNG for safe use in the satellite station, and unitarily controlling monitoring of residual stored quantity of LNG in the bulk container, determination of replacement timing of the bulk container, etc.
      SOLUTION: This device is provided with measuring means 16 and 17 to control the state of the LNG charged in the bulk container 2, measuring means 18, 19, and 20 to control consumption and residual quantity of the LNG charged in the bulk container 2, a tank inclination angle measuring means 22 to measure the inclination angle of the bulk container 2 to achieve safety and prevent disaster in relation to the bulk container, etc.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了实现LNG的安全性,并通过以待安装的散装容器为单位将LNG运送到卫星站来优化物流系统,设置控制站以不断掌握LNG的状态信息 卫星电台的安全使用,统一控制散装容器中LNG储存量残留量的确定,散装容器更换时间的确定等。解决方案:该装置设有测量装置16和17,用于控制 装载在散装容器2中的LNG的状态,测量装置18,19和20,以控制装入散装容器2中的LNG的消耗和剩余量;罐倾斜角度测量装置22, 散装集装箱2实现安全,防止散装集装箱等发生灾难。版权所有(C)2005年,JPO&NCIPI
    • 9. 发明专利
    • Lng supplying method using bulk container
    • 使用大容量容器的LNG供应方法
    • JP2005048794A
    • 2005-02-24
    • JP2003203252
    • 2003-07-29
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • IJIRI TAKUMORIITO TAKAMASAICHIKAWA TAKASHI
    • F17C13/02F17C13/00
    • PROBLEM TO BE SOLVED: To supply the gas converted from LNG (liquefied natural gas) without generating a trouble when supplying the gas to each of users and production equipment by carrying LNG in a bulk container as a unit for installation in a satellite station, and furthermore, to cope with BOG.
      SOLUTION: LNG is refined and stored in a LNG tank 2 provided in a shipping station 1, and the LNG is transferred to a trailer type bulk container 3, and the bulk container 3 is carried to the satellite station 4 for supplying the gas to a plurality of users 9 and production equipment 10. The bulk container 3 is temporarily installed in the satellite station 4, and the LNG is taken out of the bulk container 3 installed in the satellite station 4, and converted to gas. The gas is supplied to each of users 9 and production equipment 10 through a gas pipe 11, and the bulk container 3, in which the LNG is consumed, is returned to the shipping station.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供从LNG(液化天然气)转换的气体,在向用户和生产设备供应气体时不会产生麻烦,通过在散装容器中运载LNG作为安装在卫星中的单元 站,此外,应对BOG。 解决方案:LNG被精炼并存储在设置在运输站1中的LNG罐2中,并且LNG被转移到拖车式散装容器3,散装容器3被运送到卫星站4以供应 气体到多个使用者9和生产设备10.散装容器3暂时安装在卫星站4中,并且将LNG从安装在卫星站4中的散装容器3中取出并转换为气体。 气体通过气体管道11供给给使用者9和生产设备10,并且将消耗了LNG的散装容器3返回给运送站。 版权所有(C)2005,JPO&NCIPI