会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Manhole reinforcing method
    • 曼彻斯特加固方法
    • JP2008095369A
    • 2008-04-24
    • JP2006277658
    • 2006-10-11
    • Ashimori Engineering Co LtdAshimori Ind Co LtdKansai Electric Power Co Inc:TheSowa Sekkei Koji Kk双和設計工事株式会社芦森エンジニアリング株式会社芦森工業株式会社関西電力株式会社
    • ASARI KAZUNARINAKAMURA TOSHIHIROAZUMA KATSUHIKOTSUCHIYA TSUTOMUSUGAYA YUKIOTANAKA RYOHEI
    • E02D29/12
    • PROBLEM TO BE SOLVED: To provide a manhole reinforcing method for easily reinforcing an internal wall of a manhole and ensuring sufficient strength of the manhole even in the environment of a narrow working space where power cables etc. are stored. SOLUTION: The manhole reinforcing method is composed of: a hanging support means setting step of setting a hanging support means 21 over an opening of the manhole 120; a steel product joint body forming step of forming a steel product joint body 6; a steel product joint body arranging step of arranging the steel product joint body 6 along the internal wall of the manhole 120; a reinforcing member joint body forming step of fitting fitting members to the steel product joint body 6; a steel plate link adding step of connecting steel plate links 11 to upper and lower, and right and left portions of a reinforcing member joint body 8; a frame body forming step of arranging a frame body 1 by carrying out the steel plate link adding step and the reinforcing member joint body forming step a plurality of times; and a filler injection step. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种用于容易地加强人孔内壁的人孔加固方法,并且即使在存储电力电缆等的狭窄工作空间的环境中也能确保足够的人孔强度。 解决方案:人孔加固方法包括:将悬挂支撑装置21设置在人孔120的开口上方的悬挂支撑装置设定步骤; 形成钢制品接头体6的钢制品接头体形成工序; 钢制品接头体布置步骤,沿着人孔120的内壁布置钢制接头体6; 加强构件接合体形成步骤,将装配构件装配到钢制品接头体6; 将钢板连杆11连接到加固构件接合体8的上下左右部分的钢板连接加工工序; 框架体形成步骤,通过多次执行钢板连接添加步骤和加强件接合体形成步骤来布置框体1; 和填料注入步骤。 版权所有(C)2008,JPO&INPIT
    • 3. 发明专利
    • Method for laying optical fiber cable
    • 光纤电缆布线方法
    • JP2005346105A
    • 2005-12-15
    • JP2005207948
    • 2005-07-19
    • Ashimori Engineering Co LtdAshimori Ind Co LtdSanki Eng Co Ltd三機工業株式会社芦森エンジニアリング株式会社芦森工業株式会社
    • SEDO ICHIROTSUCHIYA FUMIAKIYAGI ISABUROAZUMA KATSUHIKO
    • G02B6/46H02G1/06
    • PROBLEM TO BE SOLVED: To provide a method for laying an optical fiber cable with which the optical fiber cable can be laid in an underground pipe line such as a sewer without applying tension directly to the optical fiber cable, and the optical fiber cables can be laid on the upper side in the pipe line to the sewer in which two or more optical fiber cables are to be laid, and moreover, an expensive robot is not necessary for laying work. SOLUTION: The optical fiber cable 20 is laid on the upper side in the underground pipe line 1 by arranging a tension member 25 of high strength and low elongation property so that it is slidable in the longitudinal direction, drawing the tension member 25 into the underground pipe line 1, and stretching the member almost linearly in the underground pipe line by applying tension to the tension member 25 between manholes 2, 3, and then, the tension member 25 and the optical fiber cable 20 are pressurized on the inner wall of the sewer 1 by a ring-form diameter expanders 50, 52. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种敷设光纤电缆的方法,可以将光纤电缆铺设在诸如下水道的地下管线中,而不会直接向光纤电缆施加张力,并且光纤 电缆可以放置在管线的上侧,到要铺设两根或更多条光纤电缆的下水道,此外,昂贵的机器人不需要铺设工作。 解决方案:通过布置具有高强度和低伸长率的张力构件25使光纤电缆20在纵向方向上可滑动,将拉伸构件25放置在地下管线1的上侧 进入地下管线1,并且通过向沙井2,3之间的张力构件25施加张力而在地下管线中几乎线性地拉伸构件,然后将张力构件25和光缆20在内部加压 (C)2006,JPO&NCIPI(C)2006年,JPO&NCIPI
    • 5. 发明专利
    • Inner diameter measurement device for conduit line and inner diameter measurement method for conduit line
    • 用于管线的内径测量装置和内径直径测量方法
    • JP2012058056A
    • 2012-03-22
    • JP2010200755
    • 2010-09-08
    • Ashimori Engineering Co LtdAshimori Ind Co Ltd芦森エンジニアリング株式会社芦森工業株式会社
    • AZUMA KATSUHIKOONISHI SHINJIMIYAZAKI KYOTARO
    • G01B5/12
    • PROBLEM TO BE SOLVED: To provide an inner diameter measurement device for a conduit line and an inner diameter measurement method for the conduit line that measure an inner diameter of the conduit line at an arbitrary peripheral position.SOLUTION: The inner diameter measurement device 1 includes a device body 10, a measurement unit 11 which is provided rotatably to the device body 10, and has a gage head 31 capable of moving in a radial direction of the conduit line, a centering mechanism 12 which positions the center of rotation of the measurement unit 11 on the center axis CL of the conduit line, and a motor 14 which rotates the measurement unit 11 along a peripheral direction of the conduit line. Then the measurement unit 11 is rotated on the device body 10 along the peripheral direction of the conduit line to change the position of the inner surface of the conduit line that the gage head 31 abuts against in the peripheral direction, and inner diameters are measured at a plurality of positions on the inner surface of the conduit line in the peripheral direction, respectively.
    • 要解决的问题:提供一种用于导管线的内径测量装置和用于测量任意周边位置处的导管线的内径的导管线的内径测量方法。 内径测量装置1包括装置主体10,可旋转地设置在装置主体10上的测量单元11,并且具有能够沿导管线的径向移动的量具头31, 定心机构12,其将测量单元11的旋转中心定位在导管线的中心轴线CL上;以及马达14,其使得测量单元11沿导管的周边方向旋转。 然后,测量单元11沿着导管线的周向方向在装置主体10上旋转,以改变量规头31沿圆周方向抵接的导管线的内表面的位置,并且内径在 分别在周边方向上的导管的内表面上的多个位置。 版权所有(C)2012,JPO&INPIT
    • 9. 发明专利
    • Method of reinforcing structure wall
    • 加固结构墙的方法
    • JP2008095368A
    • 2008-04-24
    • JP2006277655
    • 2006-10-11
    • Ashimori Engineering Co LtdAshimori Ind Co Ltd芦森エンジニアリング株式会社芦森工業株式会社
    • AZUMA KATSUHIKOTANAKA RYOHEIKUSUHA ICHIRO
    • E02D37/00
    • PROBLEM TO BE SOLVED: To provide a method of reinforcing a structure wall capable of securing sufficient strength by easily reinforcing the wall of a structure even in the environment in which an obstacle is contained and a working space is small.
      SOLUTION: This method of reinforcing the structure wall comprises a suspending/supporting means installation step of installing a suspending/supporting means 21, a link connection body forming step of forming a link connection body 6, a link connection body arranging step of arranging a link connection body 6 along the wall, a reinforcing member connection body forming step of fitting a fitting member to the link connection body 6, a frame body forming step of disposing the frame body 1 by repeating several times a reinforcing link adding step of connecting a reinforcing link 11 to the upper and lower and left and right sides of a reinforcing member connection body 8 while adjusting the suspended position of the reinforcing member connection body 8 in the vertical direction of the wall of the structure and the reinforcing member connection body forming step, and a filler filling step.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种通过容易地加强结构的壁而能够确保足够的强度的结构壁的方法,即使在容纳障碍物的环境和工作空间小的情况下也是如此。 解决方案:这种加固结构壁的方法包括:安装悬挂/支撑装置21的悬挂/支撑装置安装步骤,形成连杆连接体6的连接连接主体形成步骤,连接连接主体安装步骤 沿着壁布置连杆连接体6,将配合构件装配到连杆连接体6的加强构件连接体形成步骤;框架体形成步骤,通过重复多次加强框架体1的加强链接添加步骤 在加强构件连接体8的上下方向和左右两侧连接加强连杆11,同时调整加强构件连接体8在该结构体的壁的垂直方向上的悬挂位置和加强构件连接体 成型步骤和填料填充步骤。 版权所有(C)2008,JPO&INPIT