会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Aquatic life elimination device and method of eliminating aquatic life
    • 水生生物消除装置和消除水生生物的方法
    • JP2007198079A
    • 2007-08-09
    • JP2006020458
    • 2006-01-30
    • Chugoku Electric Power Co Inc:TheOsaka Prefecture Univ中国電力株式会社公立大学法人大阪府立大学
    • TANIDA KAZUMIBUTSUHARA HAJIMEOKAGAWA KAZUYOSHINANJO HIDEOOMURA TAKESHIFUJIE EIJI
    • E02B1/00C02F1/48
    • PROBLEM TO BE SOLVED: To provide an aquatic life elimination device and a method of eliminating an aquatic life which can eliminate the aquatic life relatively easily at low cost with low power consumption, and as a result can eliminate a nest of the aquatic life. SOLUTION: The elimination device 20 is provided with a plurality of electrode bars 21, 21, etc., a power source 23 and a voltage control part 24. Each of the electrode bars 21 is provided at intervals on the inner wall surface of a head race channel 4 which is in a position closer to a water intake 3 than the nearly midpoint of the head race channel 4 in the longitudinal direction. Then the voltage control part 24 controls the length of the time period of the non-application of a voltage, the length of the time period of the application of the voltage, and placement between the time period of the non-application of the voltage and the time period of the application of the voltage. During the time period of the non-application of the voltage, the aquatic life suspended in the water in the head race channel 4 is adhered to the inner wall surface of the head race channel 4 and nested without the application of the voltage to the electrode bars 21, 21, etc. On the other hand, during the time period of the application of the voltage, the aquatic life, which is adhered to the inner wall surface of the head race channel 4 during the period of the non-application of the voltage is moved away from the inner wall surface by the application of the voltage to the electrode bars 21, 21, etc. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种水生生物消除装置和消除水生生物的方法,其可以以低成本,低功耗相对容易地消除水生生物,并且因此可以消除水生生物的巢 生活。 解决方案:消除装置20设置有多个电极棒21,21等,电源23和电压控制部24.每个电极棒21间隔设置在内壁表面上 位于比头座圈通道4的纵向方向的接近中点更靠近进水口3的头部通道4。 然后,电压控制部24控制不施加电压的时间段的长度,施加电压的时间段的长度以及不施加电压的时间段和 施加电压的时间段。 在不施加电压的时间段期间,悬挂在头部游隙通道4中的水中的水生生物附着到头部座圈通道4的内壁表面,并且嵌套而不施加电压到电极 杆21,21等。另一方面,在施加电压的时间段期间,在不施加电压的期间内粘附到头座通道4的内壁面的水生生物 通过对电极棒21,21等施加电压,使电压从内壁表面移开。(C)2007,JPO&INPIT
    • 4. 发明专利
    • Measure extraction method and system and computer program
    • 测量提取方法与系统与计算机程序
    • JP2007264775A
    • 2007-10-11
    • JP2006085894
    • 2006-03-27
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • OKAGAWA KAZUYOSHIARAYA HIROAKINANJO HIDEO
    • E02B9/00G06Q50/00G06Q50/06G06Q50/10
    • Y02E10/22
    • PROBLEM TO BE SOLVED: To provide a measure extraction device and system for enabling even a beginner to easily select a measure and a computer program to be used for them concerning a power facility such as a water channel installed in a power plant. SOLUTION: This measure extraction system 1 of a power facility is provided with a measure extraction means 3 and a display means 9, and the measure extraction means includes a step ST2 for refining measures based on the factor of abnormal situations (a); steps ST3 to ST5 for weighting the measure refined by the step (a) based on the other factors, and for extracting the measure (b); and a step ST6 for displaying the measure extracted by the step (b) at the display means (c). COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种测量提取装置和系统,其使得即使初学者能够容易地选择用于关于诸如安装在发电厂中的水通道的电力设施的措施和计算机程序。 解决方案:电力设施的该测量提取系统1设置有测量提取装置3和显示装置9,并且测量提取装置包括用于基于异常情况的因素来改进措施的步骤ST2(a) ; 步骤ST3至ST5,用于基于其他因素对由步骤(a)精炼的度量进行加权,并提取测量(b); 以及用于在显示装置(c)处显示由步骤(b)提取的措施的步骤ST6。 版权所有(C)2008,JPO&INPIT
    • 5. 发明专利
    • Facilities diagnostic support apparatus, system, and computer program
    • 设备诊断支持设备,系统和计算机程序
    • JP2007232564A
    • 2007-09-13
    • JP2006054524
    • 2006-03-01
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • OKAGAWA KAZUYOSHIARAYA HIROAKINANJO HIDEO
    • G01M99/00E02B9/00
    • Y02E10/22
    • PROBLEM TO BE SOLVED: To provide a facilities diagnostic support apparatus, system, and a computer program used for them, which extract spots, in electric power facilities such as a waterway installed in a power plant, requiring priority monitoring and detailed investigations and spots requiring countermeasures exhaustively and provide an understanding of secular changes of the facilities.
      SOLUTION: The electric power facilities diagnostic support system 1 comprises: a display means 9; an inspection/investigation result evaluation means 3 for evaluating an inspection/investigation result for the facilities and displaying spots requiring priority monitoring or detailed investigations in the facilities on the display means prominently; a detailed investigation result evaluation means 4 for evaluating the detailed investigation result for the facilities and displaying spots requiring countermeasures in the facilities on the display means prominently; and a development creation means 5 for creating developments of the facilities and displaying them in a time series on the display means.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种设备诊断支持设备,系统和用于它们的计算机程序,其在诸如安装在发电厂中的水道的电力设施中提取点,需要优先监视和详细调查 以及需要采取对策的地点,并且了解设施的长期变化。 解决方案:电力设施诊断支持系统1包括:显示装置9; 用于评估设施的检查/调查结果的检查/调查结果评价装置3,显示装置上的设施的显示要点进行优先监视或者详细调查的显示点; 详细的调查结果评估手段4用于评估设施的详细调查结果,并在显示器上的设施中显示需要对策的显示点; 以及用于创建设施的开发并在显示装置上以时间序列显示设备的显影制作装置5。 版权所有(C)2007,JPO&INPIT
    • 6. 发明专利
    • Civil engineering cost integration system
    • 民用工程费用整合系统
    • JP2006268717A
    • 2006-10-05
    • JP2005089026
    • 2005-03-25
    • Chugoku Electric Power Co Inc:The中国電力株式会社
    • OKAGAWA KAZUYOSHINANJO HIDEO
    • G06Q30/06G06Q50/00G06Q50/08
    • PROBLEM TO BE SOLVED: To provide a civil engineering cost integration system capable of performing adequate work cost integration in conformation to various kinds of civil engineering works. SOLUTION: A work item that is an integration object is selected by a work item selection means (22) in reference to databases (31-36) used for integration of civil engineering cost, a template corresponding to the work item is displayed by a work item-based template display means (23). Information related to work cost breakdown of the template is referred to and displayed by a work cost breakdown reference means (27). A work cost breakdown is inputted based on the template and the information related to work cost breakdown, and the work cost is automatically calculated by an automatic work cost calculation means 25. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种土木工程成本整合系统,能够对各种土木工程作品进行适当的工作成本整合。 解决方案:参考用于土建工程成本的集成的数据库(31-36),通过工作项目选择装置(22)选择作为集成对象的工作项目,显示对应于工作项目的模板 通过基于工作项的模板显示装置(23)。 与模板的工作成本明细相关的信息由工作成本明细参照装置(27)引用并显示。 基于模板和与工作成本明细相关的信息输入工作成本明细,并且通过自动工作成本计算装置25自动计算工作成本。(C)2007年,JPO&INPIT