    • OBSTACLE PILE EXTRACTING METHOD AND DEVICE THEREOF
    • JP2001032277A
    • 2001-02-06
    • JP20613499
    • 1999-07-21
    • NISHITETSU KENKI KK
    • KAWAGUCHI EIJIROU
    • E02D9/02
    • PROBLEM TO BE SOLVED: To reduce a working time and costs by moving a high pressure water jetting means downward for excavating along the circumferential face of an obstacle pile while jetting high pressure water, detaching the circumferential face of the obstacle pile from the soil sticking to the circumferential face for lower frictional resistance applied to the circumferential face of the obstacle pile from the soil, and extracting the obstacle pile upward. SOLUTION: Just above an obstacle pile K inserted into the ground G, a high pressure water jetting means 2 is hung by means of a hanging means. While high pressure water is supplied by a high pressure water supplying means 1 for excavating the ground G with high pressure water W jetted from a high pressure water jetting nozzle 10, the high pressure water jetting nozzle 10 is lowered and guided along the circumferential face of the obstacle pile K by means of a nozzle supporting and guiding body. In this way, the circumferential face of the obstacle pile K is disconnected from the soil sticking to it and frictional resistance applied to the circumferential face of the obstacle pile K from the soil during upward movement can be reduced, so that the obstacle pile K can be pulled out from the ground G.
    • 2. 发明专利
    • EXCAVATOR
    • JPH11107663A
    • 1999-04-20
    • JP34923397
    • 1997-12-18
    • NISHITETSU KENKI KK
    • KAWAGUCHI EIJIROU
    • E21B7/18
    • PROBLEM TO BE SOLVED: To improve workability by excavating a ground by the high-pressure water of a high-pressure water supply flow path while pushing up excavated earth and sand upward by the compressed air in a compressed-air supply flow path. SOLUTION: The excavator A is composed of an excavating section 1, in which a high-pressure water feed pipe 27 and a compressed-air feed pipe 28 are juxtaposed, a hanging section 2, a high-pressure water supply section 3 and a compressed-air supply section 4. When soil and sand in a steel-pipe sheet pile connector, etc., are excavated, high-pressure water W is ejected from the high-pressure water injection nozzle 29 of the pipe 27, and compressed air (a) is ejected from the lower-end opening section 30 of the pipe 28. Vibrations are applied by a vibration-connecting body 5 and the excavating section 1 is lowered, soil and sand in an excavating space are excavated by high-pressure water W, and excavated materials are pushed up by compressed air (a). A compressed-air feed hose 12 is replaced with a mortar injection hose, and the inside of the excavating space is filled with mortar from the pipe 28. The excavating section 1 may also be formed in double pipes, in which the pipe 28 is disposed onto the outer circumference of the pipe 27. Accordingly, the efficiency of excavation and mortar injection works can be improved.
    • 6. 发明专利
    • GUIDE FRAME BODY FOR ERECTING SHEET PILE
    • JPH10298951A
    • 1998-11-10
    • JP10964097
    • 1997-04-25
    • NISHITETSU KENKI KK
    • KAWAGUCHI EIJIROU
    • E02B3/06E02D13/04
    • PROBLEM TO BE SOLVED: To erect a sheet pile smoothly and surely at the prescribed position by horizontally fixing a guide frame body between a coast and stanchions vertically erected at the constant interval from the coast, inserting the sheet pile between a pair of sheet pile guide bodies, and pressing the one side end face of the sheet pile with the sheet pile guide bodies to regulate the erecting posture. SOLUTION: This guide frame body is provided with a frame body main body 1 extended in the lateral direction along a coast B, a pair of the front and back sheet pile guide bodies 2, 3 guiding the front and back faces of a concrete sheet pile C to be erected in the erecting direction of the sheet pile C, and a sheet pile pressing body 4 pressing the side end face of the sheet pile C to the direction nearly perpendicular to the erecting direction of the sheet pile C and regulating the erecting posture of the sheet pile C. The right side end face of the suspended first sheet pile C is brought into contact with a reference stanchion 6, it is inserted between facing front and back guide rollers 21, 24, and a winding adjusting lever 51 is operated to press a pressing roller 36 to the left side end face of the sheet pile C. The sheet pile C is erected by an erecting machine while vibration is applied to the sheet pile C.
    • 7. 发明专利
    • GROUND IMPROVEMENT METHOD
    • JPH10159083A
    • 1998-06-16
    • JP810598
    • 1998-01-19
    • IDC KKNISHITETSU KENKI KKJ T C KK
    • IKEDA TSUTOMU
    • E02D3/12
    • PROBLEM TO BE SOLVED: To improve shearing force and prevent generation of accompanying rotation and excavated soil dumpling by differing the rotational direction of the upper stage outer blade and lower stage middle blade of an agitation blade body connected in upper and lower two stages from the rotational direction of the upper stage middle blade and the lower stage outer blade. SOLUTION: An inner shaft 12 and an outer shaft 14 are rotated in the mutually reverse directions by a double reverse gear mechanism 17 existing between them and a hydraulic motor. A rotary shaft composed of the inner shaft 12 and the outer shaft 14 and an excavation blade part 7 are lowered as they are rotated by operation of the hydraulic motor at the time of ground improvement working. Furthermore, a plurality of agitation rods 13 and a plurality of agitation blade bodies 15 continuously provided on the inner shaft 12 and the outer shaft 14 are mutually reversely rotated by the mutually reverse directional rotation of the inner shaft 12 and the outer shaft 14, their whole is integrally biaxially rotated, and a circular column-like excavated hole is excavated in the ground. Thereby shearing force is improved, the generation of accompanying rotation and excavated soil dumpling can be prevented.