    • 1. 发明专利
    • Casing for pulling out existing pile
    • 推出现有的皮带
    • JP2010255214A
    • 2010-11-11
    • JP2009103724
    • 2009-04-22
    • Nippon Beesu Kk日本ベース株式会社
    • KOMAZAWA KAZUOKOMAZAWA TATSUYA
    • E02D9/02E02D13/08
    • PROBLEM TO BE SOLVED: To surely pull out an existing pile when it is damaged, destroyed or ruptured. SOLUTION: This cylindrical casing for pulling out the existing pile has an excavating claw at a lower edge, and has an inside diameter larger than an outside diameter of the existing pile to be pulled out. In the casing, the plurality of claws are provided at regular spaces in a circumferential direction among them on a peripheral wall near a lower end of the casing. Each of the claws is journaled in such a manner as to be swingable between a position to be brought about almost along the peripheral wall of the casing by earth pressure in the casing during the normal rotation of the casing, and a position to be raised almost in a centripetal direction by the earth pressure in the casing during the reverse rotation of the casing. Additionally, each of the claws has a length which is set so that the claw in the position to be raised in the centripetal direction can be locked to a lower end of the existing pile when the casing is jacked into the outer periphery of the existing pile. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:当损坏,破坏或破裂时,确保拔出现有的桩。

      解决方案:用于拉出现有桩的圆柱形壳体在下边缘处具有挖掘爪,并且其内径大于要拉出的现有桩的外径。 在壳体中,多个爪在壳体的下端附近的周壁上沿周向的规则的间隔设置。 每个爪以这样一种方式进行记录,以便在壳体正常旋转期间几乎沿壳体的周壁几何在壳体周围的位置上摆动,以及几乎可以升高的位置 在壳体的反向旋转期间,通过壳体中的土压力在向心方向上。 此外,每个爪具有这样设定的长度,使得当将套管插入到现有桩的外周中时,将在向心方向上升高的位置上的爪可以锁定到现有桩的下端 。 版权所有(C)2011,JPO&INPIT

    • 2. 发明专利
    • EXPANSIBLE EARTH REMOVING DEVICE FOR EXCAVATED EARTH
    • JP2003221994A
    • 2003-08-08
    • JP2002022686
    • 2002-01-31
    • NIPPON BEESU KK
    • KOMAZAWA KAZUO
    • E21B7/00
    • PROBLEM TO BE SOLVED: To prevent earth in an inner excavation work uplifted by an earth auger in a hollow tunnel by connecting a hopper to the top end of the hollow tunnel from being filled in the hopper and dropping and scattering on the ground. SOLUTION: An extensible earth removing device 5 for excavated earth is constituted of a hopper 6 coming into contact with the head of an inner excavation tunnel 7 and an expansible cylindrical part 11 installed on its upper part. A large diametral cylinder 21 and a smaller diametral cylinder 22 of the expansible cylindrical part 11 are cocentrically engaged with each other to constitute an expansible telescopic body. The smaller diametral cylinder 22 having a flange 25 is connected to a drive structure 3 and the whole body is suspensibly supported. The lower part of the large diametral cylinder 21 gets into contact with the upper part of the hopper 6 to fit to the peripheral guide pipe 27 of holes 15 formed on the lower part. COPYRIGHT: (C)2003,JPO
    • 3. 发明专利
    • JPH05247936A
    • 1993-09-24
    • JP4458492
    • 1992-03-02
    • NIPPON BEESU KKTAKAWAKI KISO KOJI KK
    • KOMAZAWA KAZUO
    • E02D5/50E02D7/00
    • PURPOSE:To lessen an earth removing amount and to construct a bearing pile with one continuous stage of work by inserting an auger into a hollow hole of a pile to make the force-fit of the auger into the hole while making excavation, making excavation larger than an diameter of the pile when it reaches a bearing layer, and constructing a bulb while injecting a foot protection agent to penetrate the lower end of the pile into the bulb. CONSTITUTION:An auger 2 is inserted into a concrete pile 1, and an excavation device 3 is mounted to the lower end thereof and is settled into the ground 11. At that time, most part of excavated moving earth is consolidated in a hollow hole of the pile 1. After that, the lower end of the pile 1 is made to reach a bearing layer 12, and a diameter of a wing 4 is widened to excavate a forming section of a bulb 13. Cement milk is injected to construct the bulb 13. Then, the force-fit of the lower end of the pile 1 is made. According to the constitution, the pile having strong bearing force can be quickly executed with one continuous stage of work.
    • 4. 发明专利
    • Pile construction method and equipment therefor
    • 桩施工方法及其设备
    • JP2005220594A
    • 2005-08-18
    • JP2004028869
    • 2004-02-05
    • Nippon Beesu Kk日本ベース株式会社
    • KOMAZAWA KAZUO
    • E21B7/00E02D5/44
    • PROBLEM TO BE SOLVED: To provide a pile construction method and equipment therefor which enable a pile to be efficiently constructed while excavated soil is discharged, and which enhance a load bearing capacity by the possession of a pile base.
      SOLUTION: An auger screw 4 is inserted into a hollow pile 7 whose lower end is provided with a flange 8; a detachable excavating head 9 is coupled to the lower end of a rod 12 by means of an engaging protrusion 17 and a protrusion 16; and the hollow pile 7 which is held in a sandwiched state by a chucking member 6 is pressed into the ground so that an interval between the flange 8 and the excavating head 9 can be kept constant. The excavated soil can be discharged to the outside from the upper end of the hollow pile 7 by ascending in the hollow pile 7. The excavating head 9 can be left behind on the inner bottom of an underground hole, and integrated with the flange 8 so as to constitute a reinforcing member for forming a pile base at the lower end of the hollow pile 7.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种桩施工方法和设备,其能够在挖掘土壤排放时使桩能够有效地构建,并且通过拥有桩基来增强承载能力。 解决方案:将螺旋螺杆4插入中空桩7,中空桩7的下端设有凸缘8; 可拆卸的挖掘头9通过接合突起17和突起16联接到杆12的下端; 并且通过夹紧构件6保持在夹持状态的中空桩7被压入地面,使得凸缘8和挖掘头9之间的间隔可以保持恒定。 挖掘出的土壤可以从空心桩7的上端排出到外部,上空在中空桩7中。挖掘头9可以留在地下孔的内底上,与法兰8一体化 构成用于在中空桩7的下端形成桩基的加强构件。版权所有(C)2005,JPO&NCIPI
    • 5. 发明专利
    • INNER EXCAVATION CONSTRUCTING METHOD FOR PRECAST CONCRETE PILE
    • JP2000336647A
    • 2000-12-05
    • JP15351499
    • 1999-06-01
    • NIPPON BEESU KK
    • KOMAZAWA KAZUO
    • E21B7/00E02D7/00E21B10/32
    • PROBLEM TO BE SOLVED: To effectively take reaction during inner excavation by rotating an auxiliary earth auger with a diameter enlarging drilling head by an auxiliary auger driver disposed at a leader mast, and fixing a diameter enlarging cutting edge into the ground to serve as an anchor. SOLUTION: At least one side part of a leader mast 63 is provided with a guide rail spaced by about 90 deg. from a main earth auger 66 with the leader mast 63 as the center, and an auxiliary auger driver 68 is elevatingly disposed at the guide rail. An auxiliary earth auger 69 is connected to the auxiliary auger driver 68. An underground hole 70 of specified depth is drilled by a diameter enlarging drilling head 1 at the lower end part of the auxiliary earth auger 69. A diameter enlarging cutting edge 7 is extended in the outer diameter direction of the underground hole 70 so as to be fixed as an anchor in the ground to take reaction when drilling with the main earth auger 66. Work execution can thereby be easily completed only by erecting the leader mast 63 on the ground and suspending and supporting it from a truck crane vehicle 60, and work can be executed even at a construciton site which a crawler crane vehicle cannot enter.
    • 6. 发明专利
    • Destruction device and destruction and discharge device of precast end-plated concrete hollow pile
    • 预制末端混凝土中空桩的破坏装置和破坏装置
    • JP2012041674A
    • 2012-03-01
    • JP2010180889
    • 2010-08-12
    • Nippon Beesu Kk日本ベース株式会社
    • KOMAZAWA KAZUO
    • E04G23/08
    • PROBLEM TO BE SOLVED: To surely break a ring-like iron end plate fixed to an end part of a PC hollow pile and to easily destroy the entire hollow pile.SOLUTION: For a destruction device of a precast end-plated concrete hollow pile, a breaking body A composed by disposing a plurality of roughly vertically extended cutting long blades 11 of a necessary length at equal angle intervals with each other around a rotational shaft having an excavation guide member at a lower end is provided on a position higher than the excavation guide member of the rotational shaft, and the plurality of cutting long blades 11 are disposed roughly in a wedge shape by successively narrowing the horizontal intervals of tips of each other downwards. The tip horizontal interval at the lowermost end in the wedge-shaped cutting long blades 11 is made slightly smaller than an inner diameter of the precast end-plated concrete hollow pile, the tip horizontal interval is successively enlarged upwards, and the tip horizontal interval at the uppermost end is made slightly larger than an outer diameter of the end plate of the precast end-plated concrete hollow pile.
    • 要解决的问题:确定地将固定在PC空心桩的端部上的环状铁端板破坏并容易地破坏整个空心桩。 解决方案:对于预制终端电镀混凝土空心桩的破坏装置,将破碎体A以相等角度的间隔围绕旋转方向相互设置多个大致垂直延伸的切割长刀片11, 具有下端的挖掘引导构件的轴设置在比旋转轴的挖掘引导构件更高的位置,并且多个切割长刀片11通过依次缩小尖端的水平间隔而大致设置为楔形 彼此向下。 楔形切割长刀片11中的最下端的尖端水平间隔被制成略小于预制结构的混凝土空心桩的内径,尖端水平间隔连续地向上扩大,并且尖端水平间隔在 使最上端略大于预制电镀混凝土空心桩的端板的外径。 版权所有(C)2012,JPO&INPIT
    • 7. 发明专利
    • Method and equipment for hanging excavation-rod charging deformed pile
    • 用于悬挂钻孔荷载变形桩的方法和设备
    • JP2007132067A
    • 2007-05-31
    • JP2005325622
    • 2005-11-10
    • Nippon Beesu KkSanwa Kizai Co LtdSeiji Tsuji三和機材株式会社日本ベース株式会社清二 辻
    • TSUJI SEIJIKOMAZAWA KAZUOYAMAZAKI KAZUO
    • E02D7/00
    • PROBLEM TO BE SOLVED: To set an excavation-rod charging deformed pile in an erection starting position perpendicular to the ground without needing dangerous high lift work.
      SOLUTION: A deformed-rod erection machine is equipped with a plurality of excavation rods which can be freely brought into contact with and separated from an ascendably/descendably-supported rotary drive part, and an ascendable/descendable pile hanging bracket. In this method for hanging the excavation-rod charging deformed pile, the excavation rods are charged into grooves of the deformed pile which is horizontally placed on the ground, respectively, the rotary drive part is lowered to the vicinity of the deformed pile, the excavation rods in a state of being charged into the deformed pile are connected to the rotary drive part in expandably/contractibly bent states, the deformed pile is connected to the hanging bracket, and subsequently, the excavation-rod charging deformed pile is hung in the vertical erection starting position while the excavation rods are brought into unbent states from the bent states.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:将挖掘杆充填变形桩设置在垂直于地面的竖立起始位置,而不需要危险的高起重作业。 解决方案:变形杆安装机配备有可以自由地与上升/下降支撑的旋转驱动部件接触并分离的多个挖掘杆以及可升降的桩吊架。 在这种用于悬挂挖掘杆装填变形桩的方法中,挖掘杆分别装入水平放置在地面上的变形桩的槽中,旋转驱动部分下降到变形桩附近,挖掘 被装入变形桩状态的杆以可展开/收缩的弯曲状态连接到旋转驱动部,变形的桩连接到悬挂支架,随后将挖掘杆充装变形的桩悬挂在垂直 开挖杆从弯曲状态进入未弯曲状态时的安装起始位置。 版权所有(C)2007,JPO&INPIT
    • 9. 发明专利
    • DIAMETER ENLARGING EXCAVATOR
    • JPH1122358A
    • 1999-01-26
    • JP17790997
    • 1997-07-03
    • NIPPON BEESU KK
    • KOMAZAWA KAZUO
    • E21B10/32E21B10/44
    • PROBLEM TO BE SOLVED: To provide a locking means in place of a conventional guide cutter to prevent an enlarging cutter from spreading radially. SOLUTION: The enlarging excavator is structured so as to make an excavation head 3 connected to the lower end of an excavation rod 2 and inserted into a pipe casing 1 that is forced out from the pipe casing by normal rotation and axial force fitting and the enlarging cutter 11 of the excavation head 3 spreads radially in the enlargement direction. In such case, it is structured by providing locking hardware 15 to prevent the enlarging cutter 11 from spreading in the excavation head 3 when the excavation head 3 is in the pipe casing 1, and by fixing a shear ring 16 to take out the locking hardware 15 from the excavation head 3 to the inside perimeter of the lower end of the pipe casing 1 when the excavation head 3 is pushed out from the lower end portion of the pipe casing 1.
    • 10. 发明专利
    • EXPANDED HOLE DRILLING HEAD
    • JPH0960467A
    • 1997-03-04
    • JP21690695
    • 1995-08-25
    • NIPPON BEESU KK
    • KOMAZAWA KAZUO
    • E21B10/32
    • PROBLEM TO BE SOLVED: To drill an expanded hole with forward rotation, form the expanded hole to the desired depth, and prevent expansion blades from being inadvertently expanded at the time of forward rotation. SOLUTION: An outer tube body 7 provided with key sections 5 loosely fitted with keyways 3 on the inner peripheral face and drilling blades 6 on the outer peripheral face is inserted to a shaft 4 formed with the connection section 2 of a drive shaft at the upper end section and the keyways 3 in the axial direction facing each other in the radial direction at the lower end section. Expansion blades 8 are pivotally supported rotatably in the prescribed angle at least at two positions facing each other in the radial direction on the outer tube body 7, and kick pins 9 holding the expansion blades 8 via the engagement with the blade 8 in the folded state within the maximum radius of the drilling blades 6 during the forward rotation of the shaft 4 and releasing the engagement with the expansion blades 8 to press and expand the expansion blades 8 outward during the reverse rotation of the shaft 4 are provided integrally with the shaft 4.