会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Waste disposal furnace
    • 废物处理炉
    • JP2006247459A
    • 2006-09-21
    • JP2005063896
    • 2005-03-08
    • Kenso:KkOkisou Kensetsu:Kk株式会社 建創株式会社沖創建設
    • YOKOTA YOSHIFUMIMIYAGI TADAYUKISUNAKAWA MASAKAZU
    • B09B3/00B01J19/08C10B53/00F27B3/22
    • PROBLEM TO BE SOLVED: To solve the problems that disposal of waste is ununiform, incomplete disposal is generated and disposal efficiency is lower than an expected value in a process of waste disposal.
      SOLUTION: The waste disposal furnace 1 is provided with an airtightly closed vessel 2 charged with the waste; a gas discharge passage 4 provided on an upper part of the airtightly closed vessel and discharging the generated gas in the airtightly closed vessel; an air feeding passage 3 for feeding a slight amount of air into the airtightly closed vessel; and a pair of magnets 20 provided so as to clamp the air feeding passage and forming a magnetic field crossing the air feeding passage. A downstream side of the air feeding passage is connected to the airtightly closed vessel while branched in a vertical direction through a branch pipe 17 and the pair of magnets is arranged in an upstream side than a branched point of the branch pipe.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了解决废弃物处理不均匀的问题,在废物处理过程中产生的处理不完善,处理效率低于预期值。 解决方案:废物处理炉1设置有充满废物的气密密闭容器2; 设置在气密密闭容器的上部的气体排出通路4,将气体排出气密密闭容器内; 空气供给通道3,用于将少量空气供给到气密密封的容器中; 以及一对磁铁20,其被设置成夹紧空气供给通道并形成与供气通道相交的磁场。 空气供给通道的下游侧通过支管17在垂直方向上分支连接到气密密封容器,并且一对磁体布置在比分支管的分支点更上游的一侧。 版权所有(C)2006,JPO&NCIPI
    • 2. 发明专利
    • Waste disposal furnace
    • 废物处理炉
    • JP2006247457A
    • 2006-09-21
    • JP2005063837
    • 2005-03-08
    • Kenso:KkOkisou Kensetsu:Kk株式会社 建創株式会社沖創建設
    • YOKOTA YOSHIFUMIMIYAGI TADAYUKISUNAKAWA MASAKAZU
    • B09B3/00B01J19/08
    • PROBLEM TO BE SOLVED: To solve the problems that disposal of waste is ununiform, incomplete disposal is generated and disposal efficiency is lower than an expected value in a process of waste disposal.
      SOLUTION: The waste disposal furnace 1 is provided with an airtightly closed vessel 2 charged with the waste; a gas discharge passage 4 provided on an upper part of the airtightly closed vessel and discharging the generated gas in the airtightly closed vessel; an air feeding passage 3 provided on the airtightly closed vessel and feeding a slight amount of air into the airtightly closed vessel; and a pair of magnets 20 provided so as to clamp the air feeding passage and forming a magnetic field crossing the air feeding passage. When a distance of the air feeding passage and a bottom part of the airtightly closed vessel is made to L, L≤200 mm is satisfied.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了解决废弃物处理不均匀的问题,在废物处理过程中产生的处理不完善,处理效率低于预期值。 解决方案:废物处理炉1设置有充满废物的气密密闭容器2; 设置在气密密闭容器的上部的气体排出通路4,将气体排出气密密闭容器内; 空气供给通道3,设置在气密密闭的容器上,并将少量空气供给到气密密封的容器中; 以及一对磁铁20,其被设置成夹紧空气供给通道并形成与供气通道相交的磁场。 当空气供给通道和气密密闭容器的底部的距离为L时,满足L≤200mm。 版权所有(C)2006,JPO&NCIPI
    • 3. 发明专利
    • Waste disposal furnace
    • 废物处理炉
    • JP2006247455A
    • 2006-09-21
    • JP2005063782
    • 2005-03-08
    • Kenso:KkOkisou Kensetsu:Kk株式会社 建創株式会社沖創建設
    • YOKOTA YOSHIFUMIMIYAGI TADAYUKISUNAKAWA MASAKAZU
    • B09B3/00B01J19/08F27B17/00
    • PROBLEM TO BE SOLVED: To solve the problems that disposal of waste is ununiform, incomplete disposal is generated and disposal efficiency is lower than an expected value in a process of waste disposal.
      SOLUTION: The waste disposal furnace is provided with an airtightly closed vessel 2 charged with the waste; a gas discharge passage 4 for discharging the generated gas in the airtightly closed vessel; an air feeding passage 3 for feeding a slight amount of air into the airtightly closed vessel; a pair of magnets 20 provided so as to clamp the air feeding passage and forming a magnetic field crossing the air feeding passage; and a flow rate adjustment means 18 provided on the midway of the air feeding passage and adjusting an amount of air fed into the airtightly closed vessel. A casing 19 formed by a non-magnetic body is provided on the midway of the air feeding passage and an air feeding passage formation hole 19a constituting a part of the air feeding passage is formed on the casing. A pair of magnets is arranged so as to clamp the air feeding passage formation hole and a throttle part 19c having a gradually narrowed downstream side is formed on the air feeding passage formation hole.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了解决废弃物处理不均匀的问题,在废物处理过程中产生的处理不完善,处理效率低于预期值。

      解决方案:废物处理炉设有带有废物的气密封闭容器2; 气体排出通道4,用于排出气密密闭容器中产生的气体; 空气供给通道3,用于将少量空气供给到气密密封的容器中; 设置成夹持空气供给通道并形成与空气供给通道相交的磁场的一对磁铁20; 以及设置在空气供给通道的中途的流量调节装置18,并且调节进入气密密闭容器的空气量。 在空气供给通道的中途设置有由非磁性体形成的壳体19,并且在壳体上形成构成空气供给通道的一部分的送风通道形成孔19a。 一对磁铁被布置成夹紧供气通道形成孔,并且在空气供给通道形成孔上形成具有逐渐变窄的下游侧的节流部19c。 版权所有(C)2006,JPO&NCIPI

    • 4. 发明专利
    • Waste treatment furnace
    • 废物处理炉
    • JP2006289296A
    • 2006-10-26
    • JP2005115451
    • 2005-04-13
    • Kenso:KkOkisou Kensetsu:Kk株式会社 建創株式会社沖創建設
    • YOKOTA YOSHIFUMIMIYAGI TADAYUKISUNAKAWA MASAKAZU
    • B09B3/00B01J19/08F27B3/02F27B3/22
    • PROBLEM TO BE SOLVED: To provide a waste treatment furnace which improves a generation of ununiform and incomplete treatment of waste and a lower treatment efficiency than an expected value in a process of waste treatment.
      SOLUTION: The waste treatment furnace has a hexahedral sealed container 2 into which waste is charged, a gas outlet 3 which is arranged at an upper part of this container to discharge a generating gas inside, an air inlet 4 which is arranged at the sealed container to supply a small amount of air to its inside, and a pair of magnets 5 placed to sandwich the air supplying opening to form a magnetic field crossing an air supplying pathway, wherein the gas outlet is arranged near the first side wall 7a at the upper wall 6 of the sealed container, the air inlet is arranged at both the sides of lower parts of the first side wall 7a and the second side wall 7b facing with it, respectively, and each air inlet is arranged in the area G surrounded with the lower edge A, each side edge B of the second side wall and imaginary parallel lines X, Y which are arranged with 200 mm spaced inside from these edges.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供废物处理炉,其在废物处理过程中改善废物的不均匀和不完全处理的产生以及比预期值低的处理效率。 解决方案:废物处理炉具有六面体密封容器2,废物被装入其中,气体出口3设置在该容器的上部,以将内部的发生气体排出;空气入口4,其布置在 密封容器向其内部供给少量空气;以及一对磁铁5,放置成夹着供气口以形成与空气供给路径交叉的磁场,其中,气体出口配置在第一侧壁7a附近 在密封容器的上壁6处,分别在第一侧壁7a和第二侧壁7b的下部的两侧分别设置空气入口,并且每个进气口布置在区域G中 被下边缘A围绕,第二侧壁的每个侧边缘B以及与这些边缘间隔开200mm的假想平行线X,Y。 版权所有(C)2007,JPO&INPIT