    • 71. 发明专利
    • EXECUTION METHOD OF HORIZONTAL BEAM OF CONCRETE MAIN TOWER
    • JPH11200320A
    • 1999-07-27
    • JP808198
    • 1998-01-19
    • MAEDA CONSTRUCTION
    • SATO HIDETOSHI
    • E01D11/00E01D11/02E01D11/04E01D19/14E01D21/00
    • PROBLEM TO BE SOLVED: To divert a supporting girder to some other purpose, eliminate the lateral movement of the supporting girder, reduce a casting amount of concrete at one time and to enable a supporting to make a small-scale. SOLUTION: A supporting girder 19, hanging girders 23, two forms 21, etc., used in the case a horizontal beam is constructed are conveyed to specific sites of a tower column 5, the supporting girder 19 is built upward of the site in which the horizontal beam is built, a plurality of hanging girders 23 are extended to the supporting girder 19, and the forms 21 are hung on different hanging girders 23 respectively. The forms 21 cover the sides and bottom of the horizontal beam to have the openable bottom. The forms 21 are moved to both ends of the tower column 5, and a constitutive block 8 (8c) projected to the inside of each of the forms 21 in the direction of the inside between tower columns 5 is constructed by dividing into several times to erect the horizontal beam between the tower columns 5. The bottom of each of the forms 21 is opened, the inside thereof vertically passes through, and the forms 21 pass through both outsides of the constructed horizontal beam and are moved to specific sites in which the following horizontal beam is erected.
    • 73. 发明专利
    • DAMPING METHOD OF BRIDGE AND DAMPING BRIDGE
    • JPH11190006A
    • 1999-07-13
    • JP36663597
    • 1997-12-26
    • NIPPON KOKAN KK
    • SATO TAKESHIMURAKAMI TAKUYAKATO SHINJITAKAO MICHIAKI
    • E01D1/00E01D2/00E01D11/00E01D11/02E01D101/00
    • PROBLEM TO BE SOLVED: To install a damping device even in a narrow space while reducing the construction period and cost and securely damp a bridge by dividing a bridge girder into bridge girder blocks having an appropriate length in the axial direction of the bridge and depressing the vibration of the girders by dampers installed between blocks. SOLUTION: Dampers made of highly attenuating rubber are installed at both outsides of a bridge girder 6 and adjacent bridge girder blocks 1 are connected together through the damper. In this time, a damping action caused by the dampers is easily obtained by the FEM eigen value analysis on the basis of the viscous attenuation of a single damper and the number of installed dampers. The dampers effectively function even when a relatively warped displacement or a tortional displacement has arisen and attenuates the bridge girders 6. When the bridge girders 6 vibrates by wind, the girders 6 are restricted by both main towers and the displacement of the bridge girder 6 is small at the vicinity of the main towers and maximal in the vicinity of the central part of the span. In this way, many days are not required for development and design and the bridge is securely attenuated by the installed dampers and further the dampers can be installed even in a narrow space.