会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 71. 发明专利
    • POST-EXECUTION ANCHOR
    • JPH10131302A
    • 1998-05-19
    • JP28520196
    • 1996-10-28
    • KAJIMA CORPMIYANAGA KK
    • YAMANAKA HIROYUKIYOSHIKAWA TADASHIAKIYAMA TERUHISHIKI TAKEYOSHIARAI TAKAHIROMIYANAGA MASAAKI
    • E04B1/41
    • PROBLEM TO BE SOLVED: To improve tenacity by installing an expansion member to be pressed into a diameter expansion section and a sleeve pushing the expansion member around a section in the vicinity of the lower section of an anchor body in a post-execution anchor inserted into an anchor hole, to which the diameter expansion section is formed. SOLUTION: An anchor hole 2 is formed to an existing concrete structure 1 by a pit for a lower hole, etc., and an undercutter is inserted into the anchor hole 2 and a diameter expanding section 2a is formed near a hole bottom. An anchor body 3 formed of a screw-knotted reinforcement is inserted into the anchor hole 2, and a sleeve 7 is drive by a driving bar and an expansion member 6 is pushed downwards. A plurality of expansion pieces 6a of the expansion member 6 are moved onto the tapered section 4a of a bolt 4, each expansion piece 6a is expanded along the tapered section 4a and pressed into the diameter expanding section 2a, and the anchor 3 is fixed into the anchor hole 2. Accordingly, the slipping-out of cracks due to an earthquake, etc., is prevented, and reinforcing bars having high tenacity can be fixed.
    • 72. 发明专利
    • SLOPE CONSTRUCTION METHOD
    • JPH0860651A
    • 1996-03-05
    • JP19919694
    • 1994-08-24
    • KAJIMA CORP
    • MATSUI NOBUYUKISAKURAMA YUZOKANEUJI MAKOTOYOSHIKAWA TADASHI
    • E02D17/20E02D5/18E02D5/20E02D17/04E02F5/06
    • PURPOSE: To make it possible to construct a vertical slope by impregnating grout into a mountain side of a vertical groove while excavating the vertical groove with a double chain saw, and erecting a segment S through a cover plate. CONSTITUTION: A tilting cylinder 6 is operated to revolve a double chain saw 11, and a vertical groove B is excavated to move excavated soil with screw 8 and a belt conveyer 9. After that, a horizontal movement frame 5 is horizontally moved in the direction of the excavation to excavate the vertical groove B, grout C is impregnated in a space between a segment S and the vertical groove B to seal. Then, a new segment is inserted between a pair of side plates of a cover plate 13, and the existing segment S is guided and is inserted in the vertical groove B. According to the constitution, second and third stage main body walls are constructed from a first stage main body wall, and the double chain saw 11 is set at right angles to the third stage main body wall to construct a bottress groove. A buttress segment is provided to connect to the segment S of the third stage main body wall with a joint, and a third stage buttress is formed to construct a parapet.
    • 77. 发明专利
    • ANCHOR STRUCTURE
    • JP2001311224A
    • 2001-11-09
    • JP2000127608
    • 2000-04-27
    • KAJIMA CORPMIYANAGA KK
    • YAMANAKA HIROYUKIAKIYAMA TERUYOSHIKAWA TADASHIFURUICHI KOSUKEYOSHIDA KENTAROMIYANAGA MASAAKI
    • E04B1/41
    • PROBLEM TO BE SOLVED: To enable sure anchoring in anchoring length shorter than a bonding type anchor, to improve initial stiffness and adhesive performance, to obtain high reliability even to cracking, to freely set anchoring length and projecting length and to enhance usability as an anchor metal fitting. SOLUTION: A hole wall is cut to an anchor hole 2 formed to an existing concrete structure 1, expanding a diameter and upwards tapered diameter- expanding section 2a is formed, the anchor metal fitting composed of a screw bar 14 as an anchor body, a tapered nut 15, in which an upwards tapered taper section 15a is formed to an upper section screwed to the screw bar 14, and a diameter-expanding metal fitting 16, in which an expanding piece 17 abutted against the tapered section 15a of the tapered nut 15 and pushed and expanded is formed to the lower section of a ring body 19 in a skirt shape, is inserted into the anchor hole 2, the diameter-expanding metal fitting 16 is pushed down by a jig and the expanding piece 17 is expanded and the expanding piece 17 is engaged with the diameter-expanding section 2a of the hole wall, and an opening between the screw bar 14 and the anchor hole 2 is filled with fillers 22.
    • 78. 发明专利
    • RESTORATION METHOD OF STRUCTURE
    • JP2000008623A
    • 2000-01-11
    • JP18023298
    • 1998-06-26
    • KAJIMA CORP
    • YOSHIKAWA TADASHI
    • E02D3/12E02D35/00E04G23/06
    • PROBLEM TO BE SOLVED: To provide a restoration method of a structure in which the structure can be returned to the original location while using an existing underground structure and a soft ground around the underground structure can be stabilized at the same time to prevent subsidence of the ground in the future. SOLUTION: A rise control ruler 7 is laid between piles 3 on the ground above an underground structure 1a and a hydraulic device and a pressing member 9 are installed. A buoyant force acting on the underground structure 1a becomes larger than the weight by excavating soil above the underground structure 1a and removing it and hence, the underground structure rises. The upper and lower parts of the underground structure 1b after rising are filled with a light-weight backfill material 11. Finally, the whole part or a part of the rise control ruler 7, the hydraulic device, the pressing member 9, the piles 3, and ground anchors 5 is removed.
    • 79. 发明专利
    • CONSTRUCTION OF WATER-SHIELD FILM WALL
    • JPH03217518A
    • 1991-09-25
    • JP1193890
    • 1990-01-23
    • KAJIMA CORP
    • YOSHIKAWA TADASHIMATSUI NOBUYUKISAKATA NOBORU
    • E02D19/12E02D5/20
    • PURPOSE:To raise the constructibility of a water-shield film wall as well as gain the exact water shielding function of joints by a method in which a water- permeable bag is provided to the ends of a water-shield sheet and packed with a self-adhesive material, the sheet is set in a trench, and the bags are bonded by the self-adhesive material. CONSTITUTION:A viscous substance-permeable bag 4, e.g. porous sponge sheet, is provided in the longitudinal direction at the ends of a water-shield sheet 2. The bags 4 are set in a lapped form in a banded trench 1, a tremie tube 5 is inserted into the bags 4, and a self-adhesive material 6 such as asphalt mortar is charged into the bags 4 in such a way as to close the trench 1 by the expanded bags 4, where the ends of the sheet 2 are put into the aperture and the bags 4 are bonded to each other by the material 6 coming from the inside of the bags 4. The aperture between the sheet 2 and the trench 1 is packed with mortar 3, etc., to exactly shut out the intrusion of water into the joint of the sheets 2.