    • 65. 发明专利
    • Connection between steel pipe column and flat slab
    • 钢管和平板之间的连接
    • JP2008101419A
    • 2008-05-01
    • JP2006285869
    • 2006-10-20
    • Kajima Corp鹿島建設株式会社
    • FUKUMOTO TOSHIYUKITANAKA SHUNPEITANAKA NAOKIKUBOTA ATSUSHISAWAMOTO YOSHIKAZUTAKEI KOJIROOGIWARA YUKIMASAFUJIMURA HIROSHIYOSHIGAI SHIGERUTAKI MASAYATSUKAMOTO KIYOSHI
    • E04B1/30E04B5/43
    • PROBLEM TO BE SOLVED: To provide a connection between a steel pipe column and a flat slab, which is constructed by penetrating the steel pipe column into the flat slab having an almost even thickness over the entire area, wherein the amount of steel products necessary for reinforcing an area around the steel pipe column can be reduced, to thereby enhance pipe arrangement efficiency around the steel pipe column.
      SOLUTION: According to the structure of the connection, shear reinforcements 2 are projected from a peripheral surface of the steel pipe column 1 in parallel with slab reinforcements 4 in the range of the thickness of the flat slab 3 to be connected to the steel pipe column 1, and then anchored into the flat slab 3. If necessary, strengthening reinforcements 5 each having an upper edge reinforcement 51 and a lower edge reinforcement 52 are arranged in the flat slab 3 around the steel pipe column 1.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种钢管柱和平板坯之间的连接,其通过将钢管柱贯穿整个区域具有几乎均匀的厚度的平板坯而构成,其中钢的量 可以减少对钢管柱附近的区域进行加固的产品,从而提高钢管柱周围的配管效率。 解决方案:根据连接结构,剪切加强件2从钢管柱1的圆周表面平行于板坯加强件4在平板3的厚度范围内突出以连接到 钢管柱1,然后固定在平板坯3中。如果需要,在钢管柱1周围的平板坯3中设置有具有上边缘加强件51和下边缘加强件52的加强筋5。 版权所有(C)2008,JPO&INPIT
    • 66. 发明专利
    • Column-beam joining part structure of steel frame structure
    • 钢框架结构的柱梁加工部分结构
    • JP2006063564A
    • 2006-03-09
    • JP2004245049
    • 2004-08-25
    • Kajima Corp鹿島建設株式会社
    • FUKUMOTO TOSHIYUKIOGIWARA YUKIMASAFUJIMURA HIROSHITSUKAMOTO KIYOSHIOTSUKA KATSUMITAKI MASAYAMIYASAKA TATSUKUBOTA ATSUSHI
    • E04B1/24E04B1/58
    • PROBLEM TO BE SOLVED: To provide a column-beam joining part structure of a steel frame structure, for enhancing efficiency of a joint, by providing bolt arrangement for uniformly sharing stress between a column and a beam by respective joining bolts.
      SOLUTION: The beam 2 composed of H shape steel is joined to the column 1 composed of a square steel pipe via a plurality of joining hardware 3. The joining hardware 3 projects a tee flange 3a on a flange 1a of the column 1 in a side surface part of the column 1 by a plurality of high strength bolts 4
      1 and 4
      2 . The beam 2 respectively welds and joins an end part of upper and lower flanges 2a and 2a to a tee web 3b of the joining hardware 3. The high strength bolts 4
      1 and 4
      2 are arranged in two stages in the direction perpendicular to the axis of the respective columns 1 on the upper side and the lower side of the tee web 3b. The respective high strength bolts 4
      1 and 4
      2 of a first stage and a second stage are arranged in a position becoming h
      1 2 , and s
      1 > s
      2 when a distance from the tee web 3b of the joining hardware 3 is respectively set to h
      1 and h
      2 , and a distance from a web 1b of the column 1 is respectively set to s
      1 and s
      2 .
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种用于提高接头效率的钢框架结构的柱梁接合部分结构,通过提供用于通过相应的接合螺栓使塔和梁之间的应力均匀分布的螺栓布置。 解决方案:由H型钢构成的梁2通过多个接合五金件3与由正方形钢管构成的柱1接合。接合五金件3将三通法兰3a突出在列1的凸缘1a上 在多个高强度螺栓4&lt; SB&gt;和&lt; SB&gt; 2&gt;之间的塔1的侧面部分中。 梁2分别焊接并将上凸缘2a和下凸缘2a的端部连接到连接硬件3的三通网3b上。高强度螺栓4&lt; SB&gt;和&lt; 2&gt; 2& SB>在发条网3b的上侧和下侧沿垂直于相应列1的轴线的方向分成两级。 第一阶段和第二阶段的相应的高强度螺栓4&lt; SB&gt; 1&gt;和&lt; SB&gt; 2&lt; / SB&gt;被排列成h <1> 1时,SB> 2 和s 1 > s 2 和h 2 ,并且与柱1的纤维网1b的距离分别设定为s 1 和s 2 。 版权所有(C)2006,JPO&NCIPI
    • 68. 发明专利
    • Steel concrete composite floor
    • 钢混凝土复合地板
    • JP2005213754A
    • 2005-08-11
    • JP2004018320
    • 2004-01-27
    • Kajima Corp鹿島建設株式会社
    • MIYASAKA TATSUOGIWARA YUKIMASAFUKUMOTO TOSHIYUKIYAJIMA KAZUMIYOSHIGAI SHIGERU
    • E04B5/40
    • PROBLEM TO BE SOLVED: To provide a steel concrete composite floor capable of being simply constructed without carrying out a large-scale form work or concrete work. SOLUTION: A plurality of box-shaped forms 2 adjacent to each other and connected to each other are arranged between beams 1 and 1. A plurality of reinforcing bars 3 are longitudinally and laterally consecutively arranged on a plurality of box-shaped forms 2. Concrete 4 is consecutively placed in each box-shaped form 2 and on the box-shaped forms 2. The box-shaped form 2 is formed in an approximately hexagonal-shape in plan view, and it is formed in a state to open the upper end section. The box-shaped form 2 comprises a frame body 2a formed in a hexagonal-shape in plan view from a channel steel, a reinforcing rib 2b placed inside of the frame body 2a and a bottom plate 2c placed on the inside bottom section of the frame body 2a, and it is formed in the size capable of being carried by human power. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种能够简单构造而不进行大规模形式作业或具体工作的钢混凝土复合地板。 解决方案:彼此相邻并且相互连接的多个箱形形状2被布置在梁1和1之间。多个钢筋3纵向和横向地连续布置在多个箱形形式 混凝土4连续地放置在每个盒状的形式2和盒形的形式2上。盒状形状2在平面图中形成为大致六边形,并且形成为打开的状态 上端部分。 盒状形状2包括从通道钢的平面图形成六边形的框架体2a,放置在框架体2a内部的加强肋2b和放置在框架的内部底部的底板2c 身体2a,并且其形成为能够由人力携带的尺寸。 版权所有(C)2005,JPO&NCIPI