会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 41. 发明专利
    • Method for controlling hot blast stove, control unit, control system, computer program, and computer readable recording medium
    • 控制单元,控制单元,控制系统,计算机程序和计算机可读记录介质的方法
    • JP2005325446A
    • 2005-11-24
    • JP2005114957
    • 2005-04-12
    • Nippon Steel Corp新日本製鐵株式会社
    • FUJII AKIRAUENO TOSHIAKISATO TAKASHIITO MASAHIROKAWAMURA TAKUSHIYOMOTO KAZUOHONDA MOTOKI
    • C21B9/00G05B13/04
    • PROBLEM TO BE SOLVED: To improve thermal efficiency in the operation of a hot blast stove, as regards the control method of the hot blast stove for supplying hot blast into a blast furnace, a controller, a control system, a computer program, and a computer readable recoding medium.
      SOLUTION: The hot blast stove is constituted of a regenerator for giving the heat to blasting into the blast furnace 200 and a combustion chamber for heating the regenerator, and when the hot blast stove 100 operating the combustion and the blasting as one cycle, is controlled, the combustion term in the one cycle, is divided into the plurality of terms, and the combustion gas temperature and the combustion gas flow-rate, are controlled for each divided term. At this time, the combustion gas temperature at the first term in the one cycle, is higher than the combustion gas temperature at the latter term, and the combustion gas flow-rate at the first term is less than the combustion gas flow-rate at the latter term. Timing for changing from the first term to the latter term, is set to the changing time of the combustion gas temperature and the changing time of the combustion gas flow-rate, respectively, and controlled so as to improve the thermal efficiency.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提高热风炉的运行中的热效率,关于用于向高炉供应热风的热风炉的控制方法,控制器,控制系统,计算机程序 ,以及计算机可读记录介质。 解决方案:热风炉由用于将热量喷射到高炉200中的再生器和用于加热再生器的燃烧室构成,并且当热风炉100操作燃烧和爆破作为一个循环 被控制在一个循环中的燃烧项被分为多个项,燃烧气体温度和燃烧气体流量对于每个分割项被控制。 此时,一个循环中的第一期的燃烧气体温度高于后期的燃烧气体温度,第一期间的燃烧气体流量小于第一期间的燃烧气体流量, 后一个术语。 从第一项到第二个任期的时间分别设定为燃烧气体温度的变化时间和燃烧气体流量的变化时间,并且被控制以提高热效率。 版权所有(C)2006,JPO&NCIPI