会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 35. 发明专利
    • CIVIL WORK METHOD OF UNDERGROUND PIPE
    • JPH02213537A
    • 1990-08-24
    • JP3265789
    • 1989-02-14
    • JAPAN STEEL & TUBE CONSTR
    • IWASHITA FUMIHIKOURAMOTO TOSHIAKISATO KIMIO
    • E03F3/06
    • PURPOSE:To shorten the periods of temporary restoring after temporary digging performed when an underground pipe is damaged, and real digging, and simplify a restoring work by positioning a form of foam styrene block on the underground pipe after temporarily digging the sediment over the underground pipe to restore temporarily the temporarily digged portion. CONSTITUTION:When a pipe 3 is damaged, the sediment over the upper side of the pipe 3 is digged temporarily and exposed, and the damaged portion of the pipe 3 is located and the damaged condition is confirmed. Then the upper side of the pipe 3 is restored temporarily to prevent trouble due to traffic, etc. In performing temporary restoring a semicircular groove 9 having a radius (r) corresponding to the outside diameter of the pipe 3 is formed on a frame 7a made of foam styrene block, which is set on the upper side of the exposed pipe 3. First, the falsework 7a is positioned and worked according to the size of the groove 2 digged temporarily. The form 9 is positioned so that the groove 9 may be applied tightly on the upper surface of the pipe 3. Then multiple forms 7b, 7c made of foam styrene block the upper and lower surfaces of which are formed flat, are stacked according to the degree of each covering depth over the buried pipe 3, and then the top of the groove 2 is covered by a protective steel plate 10. As a result, temporary restoring is completed.