会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 24. 发明专利
    • Unloading device
    • 卸载装置
    • JP2012167468A
    • 2012-09-06
    • JP2011028452
    • 2011-02-14
    • Seiji TakechiShige IkuzoUenishi Tatsuo上西 龍雄成治 武市重 郁三
    • TAKECHI SEIJI
    • E04G23/08B66F7/02B66F7/28E04G3/30
    • PROBLEM TO BE SOLVED: To provide an unloading device capable of lowering a load of scrap wood or the like generated at a high place from the high place and promptly, simply and easily discharging it to a load-carrying platform of a transportation vehicle or the other place while saving work.SOLUTION: The unloading device includes a gondola 10, a suspension part 20, and elevating/lowering drive means 30. The gondola 10 is provided with a freely turnably pivoted bottom plate 13, and is provided with a link arm 16 for turning the bottom plate 13 around an axis to a bottom closing position and a bottom opening position. Also, the suspension part 20 is connected to the gondola 10 with a fixed play section and is connected to the link arm 16 as well. When elevating the gondola 10, by elevating the suspension part 20, the bottom plate 13 is turned to the bottom closing position, and then the gondola 10 is elevated. When lowering the gondola, by lowering the suspension part 20, the gondola 10 is lowered to a lowering stop position, and then the bottom plate 13 is turned to the bottom opening position.
    • 解决的问题:提供一种卸载装置,其能够从高处降低在高处产生的废木材等的负荷,并且能够简单,容易地将其排出到运送用承载平台 车辆或其他地方,同时节省工作。 解决方案:卸载装置包括吊车10,悬架部分20和升降驱动装置30.吊车10设置有可自由转动地枢转的底板13,并且设置有用于转动的连杆臂16 底板13围绕轴线到底部关闭位置和底部打开位置。 此外,悬挂部20也与固定的游隙部连接到吊篮10,并且也连接到连杆臂16。 当升降缆车10时,通过升起悬架部分20,底板13转到底部关闭位置,然后平台车架10升高。 当降低吊舱时,通过降低悬架部分20,将吊篮10降低到下降停止位置,然后底板13转到底部打开位置。 版权所有(C)2012,JPO&INPIT
    • 26. 发明专利
    • Gondola device
    • GONDOLA设备
    • JP2012097440A
    • 2012-05-24
    • JP2010244946
    • 2010-11-01
    • Sansei Co Ltdサンセイ株式会社
    • KISHIMOTO TAKESHIHORI MASAKAZU
    • E04G3/30E04D13/18
    • Y02B10/12
    • PROBLEM TO BE SOLVED: To provide a gondola device which allows power source of the gondola to be supplied from other than an electric power company for energy cost reduction and a roof floor space to be effectively utilized.SOLUTION: A gondola device includes two parallel rails 3 which are arranged on a roof floor of a building 1, and a gondola 4 which is movably installed on the two rails 3. The gondola device further includes a plurality of solar cell modules 5 which are arranged side-by-side in movement direction of the gondola 4 between the two rails 3, and a power supply device 6 which is connected between the gondola 4 and the solar cell modules 5 and supplies energy generated by the solar cell modules 5 to the gondola 4.
    • 要解决的问题:提供一种吊舱装置,其允许从电力公司以外的电力公司供应能源成本降低的电动机和屋顶空间以有效地利用。 解决方案:吊舱装置包括布置在建筑物1的屋顶地板上的两个平行轨道3和可移动地安装在两个轨道3上的吊舱4.缆车装置还包括多个太阳能电池模块 它们在两个轨道3之间的吊篮4的移动方向上并排布置;以及电源装置6,其连接在吊舱4和太阳能电池模块5之间,并且提供由太阳能电池模块产生的能量 版权所有:(C)2012,JPO&INPIT
    • 27. 发明专利
    • Construction method of hollow box type laminated concrete structure
    • 中空箱型层压混凝土结构的施工方法
    • JP2012026159A
    • 2012-02-09
    • JP2010165710
    • 2010-07-23
    • Morisaki Kensetsu Kogyo Co LtdNanei Kensetsu Kogyo Co Ltd株式会社南栄建設工業株式会社森崎建設工業
    • MORISAKI ISAMUOKAMOTO HIROSHI
    • E04G3/30E04G11/28
    • PROBLEM TO BE SOLVED: To safely construct a hollow box type laminated concrete structure.SOLUTION: A floor board of a work gage is mounted on a bracket installed in a layer one stage lower than a construction layer, the floor board of the work gage and a main body are separated, the main body is lifted to the outside, an inner side form of the construction layer is mounted on a retainer installed in the layer one stage lower than the construction layer, and concrete is placed between the outer side form and inner side form of the construction layer to form a concrete wall of the construction layer. The inner side form of the construction layer is removed, the main body is mounted on the upper part of the floor board of the work gage mounted on the bracket installed in the layer one stage lower than the construction layer, the bracket of the construction layer and the retainer are installed, the work gage is lifted, the middle part of the main body is mounted on the bracket installed to the construction layer, and the bracket and the retainer installed in the layer one stage lower than the construction layer are removed. By repeating the process, the hollow box type laminated concrete structure is constructed.
    • 要解决的问题:安全地构造中空箱型层压混凝土结构。

      解决方案:工作规格的地板安装在安装在比施工层低一层的支架上,工作规的底板和主体分开,主体被提升到 外部,构造层的内侧形式安装在安装在比构造层低一层的保持器上,并且混凝土被放置在构造层的外侧形式和内侧形式之间以形成混凝土壁 施工层。 拆除施工层的内侧形式,将主体安装在安装在支架上的工作台的地板上部,安装在比施工层低一层的施工层,施工层的支架 并安装保持架,工作量提升,主体中部安装在安装在施工层上的支架上,安装在比施工层低一层的托架和保持架上。 通过重复该过程,构建了中空箱型层压混凝土结构。 版权所有(C)2012,JPO&INPIT