会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Pipe bend structure
    • 管道弯曲结构
    • JP2013072253A
    • 2013-04-22
    • JP2011213312
    • 2011-09-28
    • Mitsui Zosen Tekko Koji Kk三井造船鉄構工事株式会社Mitsui Eng & Shipbuild Co Ltd三井造船株式会社
    • HAZAMA TADANORIMATSUMOTO SHINICHIHIROSE SHIGEYUKIHATTORI KAZUMIKAMIJO SATORUKIKUCHI TOMONOBU
    • E01D21/00
    • PROBLEM TO BE SOLVED: To provide a pipe bend structure which enables assembling and disassembling work on a bridge erection site to be performed in a short construction period by enabling assembly to be performed in a factory and enabling an assembled member to be transported by a truck.SOLUTION: A safety fence is ascendably/descendably held by predetermined horizontal joint frames 41-44, and a scaffold board 61 is swingably supported. The safety fence and the scaffold board 61 are carried into an erection site together with the horizontal joint frames 41-44. A pipe bend is assembled by coupling the horizontal joint frames 41-44 together. Thus, the safety fence and the scaffold board 61 are also located in predetermined positions. The safety fence is lifted to make an upper horizontal fence fixed to corresponding gussets. A support plate 62 is laid across a predetermined horizontal member, and the scaffold board 61 is swung to engage a tip part with the support plate 62. This makes the scaffold board 61 installed in the predetermined position.
    • 要解决的问题:提供一种弯管结构,其能够在桥架安装位置组装和拆卸工作,以在短的施工周期内进行,使得能够在工厂中进行组装并且能够运输组装构件 用卡车

      解决方案:安全栅栏由预定的水平关节框架41-44上升/下降地保持,并且脚手架板61可摆动地支撑。 安全栅栏和脚手板61与水平关节框架41-44一起被运送到安装位置。 通过将水平接头框架41-44联接在一起来组装弯管。 因此,安全栅栏和脚手架板61也位于预定位置。 安全栅被提起,使上部水平围栏固定在相应的角撑板上。 支撑板62穿过预定的水平构件,并且摆动脚手架板61以与支撑板62接合尖端部分。这使得脚手架板61安装在预定位置。 版权所有(C)2013,JPO&INPIT

    • 8. 发明专利
    • Land transportation device of elongated article
    • 延长文章的陆地运输装置
    • JP2008189099A
    • 2008-08-21
    • JP2007024642
    • 2007-02-02
    • Mitsui Eng & Shipbuild Co LtdMitsui Zosen Tekko Koji Kk三井造船株式会社三井造船鉄構工事株式会社
    • TOMARI RYOICHI
    • B60P3/40
    • PROBLEM TO BE SOLVED: To provide a land transportation device of an elongated article capable of turning a corner in a stable state of a low gravity center without requiring an outrigger type auxiliary wheel mechanism.
      SOLUTION: This land transportation device is provided with a supporting table for supporting one end of the elongated article and projecting the other end from a vehicle. An interference evading device 3 constituted of a supporting table lateral moving device 13 for laterally moving the supporting table 4 in relation to the vehicle 2 and a supporting table rotating device 14 for rotating the supporting table 4 clockwise or counterclockwise in relation to the vehicle 2 in the device is provided in the vehicle 2.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种能够在低重心的稳定状态下转动拐角的细长制品的陆地输送装置,而不需要外伸支架型辅助轮机构。 解决方案:该陆上输送装置设置有支撑台,用于支撑细长物品的一端并将另一端从车辆突出。 由支撑台横向移动装置13构成的防干扰装置3,用于使支撑台4相对于车辆2横向移动;以及支撑台旋转装置14,用于使支撑台4相对于车辆2顺时针或逆时针转动 该设备在车辆2中提供。版权所有(C)2008,JPO&INPIT
    • 10. 发明专利
    • Bridge installing method
    • 桥梁安装方法
    • JP2006045913A
    • 2006-02-16
    • JP2004228501
    • 2004-08-04
    • Mitsui Eng & Shipbuild Co LtdMitsui Zosen Tekko Koji Kk三井造船株式会社三井造船鉄構工事株式会社
    • SUDO NORISUKETOMARI RYOICHI
    • E01D21/06E01C1/04E01D21/00E01D21/08
    • PROBLEM TO BE SOLVED: To provide a bridge installing method capable of smoothly installing a bridge between piers in a short time, by minimizing restriction on a place, while reducing cost, in a construction area unable to install a crane under a girder.
      SOLUTION: A plurality of steel wires 5 being a tension member 4 are tensioned in the longitudinal direction on a tip part upper surface of the bridge 1, and are fixed to the bridge 1. While applying bending stress for projecting the lower side to the bridge 1 by tension of these steel wires 5, the bridge 1 is sent out in the longitudinal direction upward onto the other pier from above one pier. Since the bridge 1 is installed between one pier and the other pier, even if the bridge 1 is sent out of one pier and put in a cantilever state, the applied bending stress negates downward deflection by dead weight of the bridge 1, and the bridge can be smoothly installed between the piers.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够在短时间内平稳地安装码头之间的桥梁的桥安装方法,通过在不能在大梁下安装起重机的结构区域中减少对场所的限制,同时降低成本, 。 解决方案:作为张力构件4的多根钢丝5在桥1的前端部上表面上沿长度方向张紧,并且固定在桥1上。在施加弯曲应力的同时, 通过这些钢丝5的张力向桥1施加桥梁1,桥1从上方的一个码头上方向上方送出到另一码头上。 由于桥梁1安装在一个码头和另一个码头之间,即使桥梁1从一个码头送出并处于悬臂状态,施加的弯曲应力消除桥梁1的自重向下偏移,桥梁 可以顺利地安装在码头之间。 版权所有(C)2006,JPO&NCIPI