热词
    • 11. 发明专利
    • Draining method for use in extra-thin lining method
    • 排水方法用于超薄内衬方法
    • JP2003003797A
    • 2003-01-08
    • JP2001193209
    • 2001-06-26
    • Kumagai Gumi Co LtdMitsui Kinzoku Toryo Kagaku Kk三井金属塗料化学株式会社株式会社熊谷組
    • KIDO YOSHIKAZUKAWAMURA YOSHIYUKINAOZUKA KAZUHIRONARABE HIROSHINAKANISHI HIDEYUKI
    • E21D11/38E03F3/04
    • PROBLEM TO BE SOLVED: To provide a draining method which efficiently drains leakage from an underground structure constructed according to an extra-thin lining method, after completion of construction of the structure.
      SOLUTION: The draining method for draining leakage W from the underground structure constructed according to the extra-thin lining method which is carried out by extra-thinly lining the underground structure with a coating material such as urethane. According to the draining method, a porous sheet 6a formed of an elastic material is arranged beforehand on an inner surface of the underground structure 1 at a location at which the leakage W is expected, and a peripheral portion 7 of the sheet 6a is fixed to the underground structure 1. When leakage pressure is applied on the sheet, pores 8, 8, etc., in the porous sheet 6a are opened due to the elastic deformation of the same, to thereby drain the leakage.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:提供一种排水方法,该方法能够在结构构造完成之后有效地从根据超薄衬里法构造的地下结构中排出泄漏。 解决方案:排水方法,从地下结构排水泄漏W,根据超细衬层法,通过用氨基甲酸乙酯等涂层材料对地下结构进行超薄衬砌。 根据排水方法,在地下结构体1的内表面预先设置由弹性材料形成的多孔板6a,在预期泄漏W的位置处,将片6a的周边部分7固定到 地下结构体1.当在片材上施加泄漏压力时,多孔片材6a中的孔隙8,8等由于其弹性变形而打开,从而排出泄漏物。
    • 14. 发明专利
    • PRODUCTION OF PC SEGMENT
    • JPH07314430A
    • 1995-12-05
    • JP13806894
    • 1994-05-28
    • KUMAGAI GUMI CO LTD
    • KITAYAMA HIROYASUNAOZUKA KAZUHIROKIDO YOSHIKAZU
    • E21D11/10B28B23/04E04G21/12
    • PURPOSE:To eliminate a possibility of deformation of a form for a segment and produce a PC segment of high waterstop properties. CONSTITUTION:A plurality of wires 20, 20... are fastened to a PC steel rod 12 at predetermined intervals between abutments A1, A2 forming a tensing device. Each of the wires 20, 20... is extended in the centrifugal direction of the circular PC steel rod 12 through an outer peripheral form 10b. When the set PC steel rod 12 is tensed, it is tensed with a force corresponding to a required tensing force while a reaction force is produced from the abutments A1, A2. If at this time the respective wires 20 are also simultaneously tensed in accordance with the tensing force, the PC steel rod 12 cannot be deformed in shape but can be formed into an accurate circle. Therefore, a prestress can be uniformly introduced. Mortar, such as concrete, is placed in a forms 10 with the PC steel rod 12 tensed. After the concrete is hardened with the generation of a predetermined strength, the form 10 is disassembled for the removal of the segment.