会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Updating method of control board
    • 控制板更新方法
    • JP2009232553A
    • 2009-10-08
    • JP2008073873
    • 2008-03-21
    • Toshiba Corp株式会社東芝
    • SUZUKI HIROMITSUKAMIYAMA MASAHIKOASHIHARA MUTSUROTAKAHASHI ATSUSHI
    • H02B3/00H02B1/015H02B1/30H02B1/54
    • PROBLEM TO BE SOLVED: To solve the matter that the facility cost increases and the function shut-down and update periods of a control board are prolonged at the time of update in an update work where the housing of the control board and a control unit are exchanged collectively. SOLUTION: A updating method of control board for replacing the control unit 3 of the control board 1 containing the control unit 3 for plant equipment with a new control unit N3 by mounting various electrical components in the housing 2 of the control board which is installed on a channel base 4 fixed to the floor surface G comprises a first step of separating and removing an existing control unit 3 mounted on an existing control unit mounting rack 2 -2 in the housing 2 of the control board from an external circuit, a second step of mounting a new control unit N3 on an updating control unit mounting rack 6 prepared anew, a third step of fixing a rack fixing base 7 to the existing channel base 4, a fourth step of mounting the updating control unit mounting rack 6 on the rack fixing base 7, and a fifth step of connecting the new control unit N3 and the external circuit after the fourth step. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:为了解决设备成本增加和控制板的功能关闭和更新周期在更新时的更新时间更长的事项,其中控制板和 控制单元集体交换。

      解决方案:控制板的更新方法,用于通过在控制板的壳体2中安装各种电气部件来将包含用于设备设备的控制单元3的控制板1的控制单元3替换为新的控制单元N3, 安装在固定在地板表面上的通道基座4上G包括将安装在现有控制单元安装架2上的现有控制单元3分离和移除的第一步骤, 控制板,将新的控制单元N3安装在重新准备的更新控制单元安装架6上的第二步骤,将机架固定座7固定到现有的通道底座4上的第三步骤,第四步安装 更新控制单元安装架6在机架固定座7上,以及在第四步之后连接新的控制单元N3和外部电路的第五步骤。 版权所有(C)2010,JPO&INPIT

    • 2. 发明专利
    • Plant protection instrumentation device
    • 植物保护仪器设备
    • JP2003287587A
    • 2003-10-10
    • JP2002088942
    • 2002-03-27
    • Toshiba Corp株式会社東芝
    • KONDO YUTAKAKAMIYAMA MASAHIKONISHIKAWA HIROSHISAKAMOTO HIROSHITARUMI TERUTSUGUYUNOKI AKIRAMAEKAWA YOSHIZOKONDO KATSUYAIZUMI MIKIO
    • G21C17/00G05B9/02
    • G05B9/02
    • PROBLEM TO BE SOLVED: To avoid much trouble and time which cause to increase product cost because of needs of verification for ensuring reliability of software and the work for intactness confirmation in the case an instrumentation circuit of comparing process signal and set value is constituted of a microprocessor in a plant protection instrumentation device, and avoid increase in pattern number of digital input in the case of function confirmation test when using a hardware device for process signal only. SOLUTION: The instrumentation circuit is constituted of a logic integrated circuit of hardware electrically independent of a plurality of different process signals. The instrumentation circuit is multi-plexed for a single process signal. The output signal from the multi-plexed instrumentation circuit is logically decided using a majority decision circuit and operation signal is output. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了避免由于验证需要而导致产品成本增加的麻烦和时间,以确保软件的可靠性和完整性确认的工作,在比较过程信号和设定值的仪表电路是 由工厂保护仪表设备中的微处理器构成,并且在仅使用硬件设备进行功能确认测试的情况下避免增加数字输入的模式数量。 解决方案:仪表电路由与多个不同过程信号电气独立的硬件的逻辑集成电路构成。 仪器电路是单路过程信号的多路复用。 来自多路复用仪表电路的输出信号由多数决定电路逻辑决定,输出运算信号。 版权所有(C)2004,JPO
    • 3. 发明专利
    • Method of monitoring and controlling power generation
    • 监测和控制发电的方法
    • JP2010267061A
    • 2010-11-25
    • JP2009117566
    • 2009-05-14
    • Toshiba Corp株式会社東芝
    • SASAKI TOSHIYAKAMIYAMA MASAHIKOASHIHARA MUTSURONAGAHISA KOJIFUKUSHIMA MASAKIMOGI KENICHI
    • G05B9/03
    • PROBLEM TO BE SOLVED: To provide monitoring and controlling, in the event that a permanent computer of a power generation monitoring and controlling system stops functioning or fails, until the function of the permanent computer is recovered, regarding monitoring and control for which only a short period of unmonitorable time is permitted because of operational and regulatory restrictions.
      SOLUTION: The power generation monitoring and controlling system 1 includes a permanent computer 10, a PLC device 20n, a field device 30n, a display operation unit 40n, and a network 50. The permanent computer 10 causes the display operation unit 40n to display device information coming from the field device 30n, and allows the input of operation information based on a touch operation that an operator performs on a screen of the display operation unit 40n. In the event that the permanent computer 10 stops functioning or fails, a temporary computer 60 is connected to the generation monitoring and controlling system 1, thereby it is made possible to transfer signals indicating the device information and limited operating information between the temporary controller 60 and the field device 30n to perform part of the monitoring and controlling of the field device 30n.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供监测和控制,在发电监测和控制系统的永久计算机停止运行或故障的情况下,直到永久计算机的功能恢复,关于其监测和控制 由于操作和监管限制,只允许短时间内不可监视的时间。 发电监视和控制系统1包括永久计算机10,PLC设备20n,现场设备30n,显示操作单元40n和网络50.永久计算机10使显示操作单元40n 显示来自现场设备30n的设备信息,并且允许基于操作者在显示操作单元40n的屏幕上执行的触摸操作来输入操作信息。 在永久计算机10停止运行或故障的情况下,将临时计算机60连接到生成监视和控制系统1,从而可以在临时控制器60和临时控制器60之间传送指示设备信息和有限操作信息的信号 现场设备30n执行现场设备30n的监视和控制的一部分。 版权所有(C)2011,JPO&INPIT
    • 4. 发明专利
    • Field operation executing state management device and management method
    • 现场操作执行状态管理设备和管理方法
    • JP2008084068A
    • 2008-04-10
    • JP2006264158
    • 2006-09-28
    • Toshiba Corp株式会社東芝
    • SAKUMA MASATAKENEZU MOTOTSUGUSASAKI MASAHIKOMOGI KENICHIYAMAMOTO HIROKIKAMIYAMA MASAHIKOSHIMIZU SHUNICHI
    • G06Q50/00G06Q50/10
    • PROBLEM TO BE SOLVED: To guarantee objective accuracy in creation of operation record information containing photographic image information of an operation content in a field operation. SOLUTION: The field operation executing state management device 100 for recording and managing operation contents executed by a worker in a field comprises an operation data acquisition part 101 for acquiring operation process information from the worker, a sensor set in a device in use or the device in use itself; an operation place information acquisition part 102 for acquiring place information related to the executing place of an operation; an operation time information acquisition part 103 for acquiring time information related to the time when the operation is executed; an imaging part 104 for acquiring image information related to the operation; and an operation information recording part 105 for collectively recording and managing each piece of information acquired by the operation data acquisition part, the operation place information acquisition part, the operation time information acquisition part and the imaging part in an operation unit. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:确保在现场操作中创建包含操作内容的摄影图像信息的操作记录信息的客观准确性。 解决方案:用于记录和管理由现场人员执行的操作内容的现场操作执行状态管理装置100包括操作数据获取部分101,用于从工作人员获取操作处理信息,在使用的装置中设置传感器 或正在使用的设备本身; 用于获取与操作的执行场所相关的地点信息的操作地点信息获取部分102; 操作时间信息获取部103,用于获取与执行操作的时间有关的时间信息; 用于获取与该操作相关的图像信息的成像部分104; 以及操作信息记录部105,用于在操作单元中共同地记录和管理由操作数据获取部分获取的每个信息,操作地点信息获取部分,操作时间信息获取部分和成像部分。 版权所有(C)2008,JPO&INPIT
    • 5. 发明专利
    • Suppression pool temperature monitoring device in nuclear power plant
    • 核电站抑制池温度监测装置
    • JP2003270378A
    • 2003-09-25
    • JP2002066243
    • 2002-03-12
    • Toshiba CorpToshiba Eng Co Ltd東芝エンジニアリング株式会社株式会社東芝
    • KAMIYAMA MASAHIKOHORI TOMOO
    • G21C17/00G09G5/00G09G5/36G21C17/02
    • PROBLEM TO BE SOLVED: To solve the problem that improvement in monitoring performances is required, such as misjudgment of monitoring, a long time required for monitoring or the like, with a background information wherein, concerning temperature monitoring of water in a suppression pool in a nuclear power plant, the temperature monitoring is performed hitherto in such a way that monitoring parameters detected by a plurality of temperature sensors are displayed by lines on a recording paper, and that a watchman confirms the lines visually and performs comparative monitoring of a temperature change or temperatures between each temperature sensor.
      SOLUTION: Arrangement of the plurality of temperature sensors is displayed on a typical chart of the suppression pool, and the detected temperature of each temperature sensor and information on the temperature sensor position are displayed in each temperature sensor display.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了解决需要监视性能的改善的问题,诸如监视的误判,监视所需的时间长等,具有背景信息,其中关于在抑制中的水的温度监视 在核电站中进行温度监视,以这样的方式执行温度监视,使得由多个温度传感器检测的监测参数通过记录纸上的线显示,并且守望者在视觉上确认线,并且进行比较监视 每个温度传感器之间的温度变化或温度。 解决方案:多个温度传感器的布置显示在抑制池的典型图表上,每个温度传感器显示屏上显示每个温度传感器的检测温度和温度传感器位置信息。 版权所有(C)2003,JPO
    • 6. 发明专利
    • Equipment replacement method of power generation monitoring control system
    • 发电监控系统的设备更换方法
    • JP2010267057A
    • 2010-11-25
    • JP2009117452
    • 2009-05-14
    • Toshiba Corp株式会社東芝
    • MOGI KENICHIFUKUSHIMA MASAKIKAMIYAMA MASAHIKOASHIHARA MUTSUROSASAKI TOSHIYANAGAHISA KOJI
    • G06F1/00
    • PROBLEM TO BE SOLVED: To shorten the operation stop time of a power generation monitoring control system when replacing a computer and an PIO device existing in the power generation monitoring control system with a new computer and PIO device. SOLUTION: An existing power generation monitoring control system 1 is provided with: an existing computer 110; an existing PIO board 120; and on-site equipment 130. The existing PIO board 120 is provided with: an existing PIO device 121 and a terminal stand 122 connected by wiring 123. When the existing computer 110 and the existing PIO device 121 are replaced, a replacement unit 3 having the newly installed computer 210 and the newly installed PIO device 221 is prepared (S1), and a testing device 270 is connected to the newly installed PIO device 221 (S2). The operation of the replacement unit 3 is confirmed by using the testing device 270 (S3). The operation of the power generation monitoring control system 1 is stopped (S4). The wiring 123 is removed from the existing PIO device 121 (S5), and connected to the newly installed PIO device 221 (S6). COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:在用新的计算机和PIO设备更换发电监控控制系统中存在的计算机和PIO设备时,缩短发电监控控制系统的运行停止时间。 现有的发电监控控制系统1具有:现有的计算机110; 现有的PIO板120; 现有的PIO板120设置有现有的PIO设备121和通过接线123连接的终端机架12.当现有的计算机110和现有的PIO设备121被更换时,更换单元3具有 准备新安装的计算机210和新安装的PIO设备221(S1),并且测试设备270连接到新安装的PIO设备221(S2)。 通过使用测试装置270来确认更换单元3的操作(S3)。 停止发电监视控制系统1的动作(S4)。 接线123从现有的PIO设备121(S5)中取出,并连接到新安装的PIO设备221(S6)。 版权所有(C)2011,JPO&INPIT
    • 7. 发明专利
    • Method of updating control panel
    • 更新控制面板的方法
    • JP2010259137A
    • 2010-11-11
    • JP2009102736
    • 2009-04-21
    • Toshiba Corp株式会社東芝
    • NAGAHISA KOJIWADA HIROYUKIASHIHARA MUTSUROKAMIYAMA MASAHIKOTAKAHASHI ATSUSHINORIKI HIDEMITSUKATO MAMORU
    • H02B3/00
    • PROBLEM TO BE SOLVED: To provide a method of updating a control panel which can shorten the period of function loss, from the start of update of the control panel to the test of a new control panel. SOLUTION: The method of updating the control panel, in which an existing controller 3a for an existing control panel 3 is updated, includes: a new controller installing process in which a new controller 5a, a new network 7 and a testing device 6 are installed outside the existing control panel 3; a new network connecting process in which the installed new controller 5a and the testing device 6 are connected to each other by the new network 7; a new controller testing process in which the test of the new controller 5a is performed outside the existing control panel 3; an existing controller removing process in which the existing controller 3a is removed from the existing controller 3; a new controller installing process, in which the new controller 5a is installed in the existing control panel 3 from which the existing controller 3a is removed; an existing terminal block connecting process in which the stored new controller 5a and the existing terminal block 3b of the existing control panel 3 are connected with each other; and a site equipment checking process in which the connection between the connected new controller 5a and the site equipment 1 is checked. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种从控制面板的更新开始到新的控制面板的测试的更新控制面板的方法,其可以缩短功能损失的周期。 解决方案:更新现有控制面板3的现有控制器3a的控制面板的更新方法包括:新的控制器安装过程,其中新的控制器5a,新的网络7和测试设备 6安装在现有控制面板3的外部; 通过新网络7将安装的新控制器5a和测试装置6相互连接的新的网络连接过程; 新的控制器测试过程,其中新控制器5a的测试在现有的控制面板3之外执行; 现有的控制器移除过程,其中现有控制器3a从现有控制器3中移除; 新的控制器安装过程,其中新的控制器5a安装在现有控制面板3中,现有的控制器3a从该控制面板3被移除; 存储的新控制器5a和现有控制面板3的现有端子块3b彼此连接的现有端子块连接处理; 以及检查连接的新的控制器5a和现场设备1之间的连接的现场设备检查处理。 版权所有(C)2011,JPO&INPIT
    • 9. 发明专利
    • Method for updating of input device
    • 用于更新输入装置的方法
    • JP2010267119A
    • 2010-11-25
    • JP2009118622
    • 2009-05-15
    • Toshiba Corp株式会社東芝
    • NAGAHISA KOJIKAMIYAMA MASAHIKOASHIHARA MUTSUROSASAKI TOSHIYAFUKUSHIMA MASAKIMOGI KENICHI
    • G05B19/05
    • PROBLEM TO BE SOLVED: To update an input device without the need for setting of a temporary device and alternative monitoring using other monitoring equipment.
      SOLUTION: Connection between the input device 2-1 to be updated among a plurality of input devices 2-1 to 2-4 to which a given value is input, and an arithmetic device 3 is cut out, an input device simulator 8 is connected to the arithmetic device 3, the input device simulator 8 outputs a simulated signal to the arithmetic device 3, the arithmetic device 3 performs operation using the simulated signal of the input device simulator 8, the connection between the input device simulator 8 and the arithmetic device 3 is cut out, and the updated input device is connected to the arithmetic device 3.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:更新输入设备而不需要设置临时设备,并使用其他监控设备进行替代监控。 解决方案:切换输入给定值的多个输入装置2-1至2-4中要更新的输入装置2-1和运算装置3之间的连接,输入装置模拟器 8连接到运算装置3,输入装置模拟器8向运算装置3输出模拟信号,算术装置3使用输入装置模拟器8的模拟信号,输入装置模拟器8和 剪切运算装置3,将更新的输入装置连接到运算装置3.版权所有(C)2011,JPO&INPIT
    • 10. 发明专利
    • Digital control system, digital control device, and method of testing transmission of the digital control system
    • 数字控制系统,数字控制装置以及测试数字控制系统传输方法
    • JP2010178106A
    • 2010-08-12
    • JP2009019095
    • 2009-01-30
    • Toshiba Corp株式会社東芝
    • NORIKI HIDEMITSUKAMIYAMA MASAHIKOASHIHARA MUTSUROFURUKAWA TOMOAKIKATO AKIONEZU MOTOTSUGUUEJI TATSUYANAGAHISA KOJIHOSHINO MASATERUKATO MAMORU
    • H04B17/00G05B23/02H04L12/70H04Q9/00
    • PROBLEM TO BE SOLVED: To prevent effect on a network by a transmission test even when executing the transmission test of a digital control system connected to the network. SOLUTION: Digital control devices 10, 20 connected to each other via a network include: input address memories 11, 21 each used for storing signal information received by transmission function parts; previous input address value memories 14, 24 for separately storing signal information stored in the input address memories 11, 21; control and calculation units 12, 22 for executing calculation based on the signal information stored in the input address memories 11, 21 or the previous input address value memories 14, 24; signal switches 15, 25 for input of the signal information stored in the input address memories 11, 21 or the signal information stored in the previous input address value memories 14, 24 to the control and calculation units 12, 22; and output address memories 13, 23 for storing the calculation results by the control and calculation units 12, 22. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:即使在执行连接到网络的数字控制系统的传输测试时,也可以通过传输测试来防止对网络的影响。 解决方案:经由网络彼此连接的数字控制设备10,20包括:输入地址存储器11,21,每个用于存储由传输功能部件接收的信号信息; 用于分别存储在输入地址存储器11,21中的信号信息的先前输入地址值存储器14,24; 用于基于存储在输入地址存储器11,21中的信号信息或先前的输入地址值存储器14,24执行计算的控制和计算单元12,22; 信号开关15,25,用于输入存储在输入地址存储器11,21中的信号信息或将存储在先前输入地址值存储器14,24中的信号信息输入到控制和计算单元12,22; 以及用于通过控制和计算单元12,22存储计算结果的输出地址存储器13,23。版权所有(C)2010,JPO&INPIT