会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • OFFSHORE PREPARATION SYSTEM
    • 离岸VORBEREITUNGSSYSTEM
    • EP3008251A4
    • 2017-08-09
    • EP14810356
    • 2014-06-12
    • MEEDL68 LP
    • PIENADO RENE E
    • E02D15/06B28C9/04B63B35/00E02D27/52
    • B28C9/0454B28C7/165B63B27/25E02D15/06
    • A waterborne facility on a body of water includes a primary spoolable pipe and a pump. The end of the primary spoolable pipe may be guided from the waterborne facility to a location proximate to a selected site. The pump may be used to discharge a flowable material through the primary spoolable pipe. The waterborne facility may include a ready-mix concrete preparation system. However, the waterborne facility may deliver any flowable material to a selected site, which may be a land surface, underground, on a water surface, or underwater. Illustrative flowable materials include seawater, grout, cement, and sediment/mud.
    • 水体上的水上设施包括初级可缠绕管道和泵。 主要可缠绕管道的末端可以从水上设施被引导至靠近选定地点的位置。 该泵可用于排出可流动材料通过主可缠绕管。 水运设施可能包括预拌混凝土制备系统。 然而,水运设施可以将任何可流动的材料输送到选定的场地,该场地可以是陆地表面,地下,水面或水下。 说明性的可流动材料包括海水,泥浆,水泥和沉积物/泥浆。