会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明公开
    • LOWER SEALING VALVE ASSEMBLY FOR A SHAFT FURNACE CHARGING INSTALLATION AND VALVE ACTUATION MECHANISM THEREFORE
    • 下部密封阀安排植物货物竖炉和阀门控制机制THEREFOR
    • EP2307578A1
    • 2011-04-13
    • EP09804587.5
    • 2009-08-10
    • Paul Wurth S.A.
    • RIZZUTI, EttoreVANDIVINIT, JeffLOUTSCH, Jeannot
    • C21B7/20
    • C21B7/20C21C5/527C21C5/54F27B1/20F27D99/0073F27D2003/105Y02P10/216
    • The invention concerns a lower sealing valve assembly for a shaft furnace charging installation. It comprises a lower sealing valve housing (1) with a lower outlet (7) through which charge material can freely drop onto a distribution device. The housing has at least one upper inlet (4, 6) for communicating with an outlet of a hopper arranged above the housing. Each inlet has an associated valve seat (12, 14) that is arranged inside the lower sealing valve housing and turned towards the interior of the housing (1). A shutter (40) is operatively connected to an actuation mechanism (46, 50) for moving the shutter into and out of sealing contact with the valve seat. The valve actuation mechanism comprises a turn-slide cylindric joint (50) having a typically vertical joint axis (51) for swiveling the shutter (40) in a plane perpendicular to the joint axis (51) inside the lower sealing valve housing and for translating the shutter (40) up and down along the joint axis (51). According to the invention, the cylindric joint comprises a shaft (52) that is axially fixed and rotatably in a hollow sleeve (54), which in turn is axially slideable in an outer shell (56) that is fixed to the housing. Further according to the invention, the mechanism comprises: a first hydraulic cylinder (72), which is connected on one side to the shell (56) and on the other side to the hollow sleeve (54) to impart axial translation to the sleeve and therewith to the shaft along the joint axis (51); and: a second hydraulic cylinder (74), which is hinged on one side to the sleeve and on the other side to the shaft, to impart rotation to the shaft (52) and about the joint axis (51).
    • 8. 发明公开
    • Multiple hopper charging installation for a shaft furnace
    • MehrfacherFülltrichtereines Schachtofens
    • EP1811045A1
    • 2007-07-25
    • EP06100682.1
    • 2006-01-20
    • PAUL WURTH S.A.
    • Lonardi, EmileThillen, GuyThinnes, ClaudeLoutsch, Jeannot
    • C21B7/20F27B1/20F27D3/00
    • F27D3/10C21B7/20F27B1/20F27D3/0025F27D3/0032F27D3/0033F27D2003/105
    • A multiple hopper charging installation (10, 10') for a shaft furnace comprises a rotary distribution device (14) for distributing bulk material in the shaft furnace (12) by rotating a distribution member about a central axis (A) of the shaft furnace and at least two hoppers (20, 22) arranged in parallel and offset from the central axis above the rotary distribution device. Each hopper has a lower funnel part (76) ending in an outlet portion (78) and each hopper has a material gate valve (82) with a shutter member (84) associated to its outlet portion. According to the invention, each funnel part (76) is configured asymmetrically with its outlet portion (78) being eccentric and arranged proximate to the central axis (A), each outlet portion (78) is oriented vertically so as to produce a substantially vertical outflow (140) of bulk material and each material gate valve (82) is configured with its shutter member (84) opening in a direction pointing away from the central axis (A) such that any partial valve opening area is located on the side of the associated outlet portion (78) proximate to the central axis (A).
    • 用于竖炉的多料斗加料装置(10,10')包括旋转分配装置(14),用于通过围绕竖炉的中心轴线(A)旋转分配构件来分配竖炉(12)中的散装材料 和至少两个排料斗(20,22),平行布置并偏离旋转分配装置上方的中心轴线。 每个料斗具有终止在出口部分(78)中的下漏斗部分(76),并且每个料斗具有材料闸阀(82),其具有与其出口部分相关联的闸门构件(84)。 根据本发明,每个漏斗部分(76)被非对称地构造,其出口部分(78)是偏心的并且靠近中心轴线(A)布置,每个出口部分(78)垂直取向,以便产生基本垂直的 散装材料的出口(140)和每个材料闸阀(82)构造成其挡板部件(84)沿着远离中心轴线(A)的方向开口,使得任何部分阀开口区域位于 相邻的出口部分(78)靠近中心轴线(A)。
    • 9. 发明公开
    • VORRICHTUNGS- UND PROZESSSYSTEM ZUM VORWAERMEN VON STAHLSCHROTT
    • 机器和过程系统,用于废钢PREWARMING
    • EP1034313A1
    • 2000-09-13
    • EP98963516.4
    • 1998-11-27
    • SMS SCHLOEMANN-SIEMAG AKTIENGESELLSCHAFT
    • WÜNSCHE, Robert, Roy
    • C21C5/56F27D13/00
    • C21C5/565F27D3/003F27D3/04F27D3/10F27D13/002F27D2003/0065F27D2003/105Y02P10/216
    • The invention relates to a novel preheating device and a method for preheating an iron scrap mixture before delivering the scrap iron into a metallurgical furnace. The invention primarily makes use of heat which is recovered from hot waste gasses that have been emitted from the furnace outlet. The invention is also provided for simultaneously reducing contaminated substances from the scrap iron and from the waste gasses with a downward stream comprised of the hot waste gas and of the downward falling scrap iron which flow in the same direction. The invention has a chamber comprising an upper compartment having a cold scrap iron feed provided for dumping cold scrap iron into the upper compartment and a hot gas inlet which is flow-connected to the furnace outlet. The chamber also has a lower compartment with an unloading mechanism for the heated scrap iron in order to forcibly deliver the heated scrap iron into the furnace and has a waste gas outlet which is flow-connected to a vacuum outlet and provided for evacuating the used waste gas. Gates which allow gas to pass through are arranged between each chamber compartment and sequentially operate between a closed gate position and an open gate position for receiving a scrap iron charge which is delivered in a closed gate position from the cold scrap iron feed in the same direction by means of gravity. During a predetermined hold period, the scrap iron charge is stored while hot waste gas flows downward out of the hot gas inlet in the upper compartment, penetrates through the scrap iron charge and through the closed gate, and flows out of the waste gas outlet in the lower compartment. The gates mix the scrap iron when it falls and serve to control the gravitational downward movement of the scrap iron charge from the upper compartment to the lower compartment after the hold period has elapsed.