会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • HEATING DEVICE WITH TWO COMBINED HEAT UNIT AND HEATING METHOD
    • 双组合加热装置加热装置及加热方法
    • EP3255356A1
    • 2017-12-13
    • EP16173600.4
    • 2016-06-08
    • Vestel Elektronik Sanayi ve Ticaret A.S.
    • Ayran, ÇaglarÖzen, Erol
    • F24J2/32F24J2/05
    • F24S20/40F24D2200/123F24D2220/07F24S10/90F24S60/30Y02B10/22Y02E10/40
    • The present invention refers to a heating device (1). The heating device (1) according to the present invention comprises a heat pipe unit (2), wherein the heat pipe unit (2) comprises at least one heat pipe (4) for heating water, and a heat pump unit (6) for heating the water inside the heat pipe (4), wherein the heat pump unit (6) comprises a fluid conducting means (8) for conducting an energy transferring fluid, wherein the fluid conducting means (8) comprises an evaporation section (10) for evaporating the energy transferring fluid, and wherein the fluid conducting means (8) comprises a condensing section (12) for condensing the evaporated transferring fluid, wherein the condensing section (12) is at least thermally coupled with the at least one heat pipe (4) of the heat pipe unit (2).
    • 加热装置(1)技术领域本发明涉及加热装置(1)。 根据本发明的加热装置(1)包括热管单元(2),其中热管单元(2)包括至少一个用于加热水的热管(4),以及用于热泵单元 加热热管(4)内的水,其中热泵单元(6)包括用于传导能量传递流体的流体传导装置(8),其中流体传导装置(8)包括蒸发部分 蒸发能量传递流体,并且其中流体传导装置(8)包括用于冷凝蒸发的传递流体的冷凝部分(12),其中冷凝部分(12)至少与至少一个热管(4) )的热管单元(2)。
    • 3. 发明公开
    • Energy-saving water boiler
    • Energiesparender Wasserkessel
    • EP2388534A2
    • 2011-11-23
    • EP11152671.1
    • 2011-01-31
    • Shun-Chi, YangMao, Hsiung YangYANG, Tsung-ChuanFANG, Ming-WuCHENG-YEN, Wu
    • Shun-Chi, YangMao, Hsiung YangYANG, Tsung-ChuanFANG, Ming-WuCHENG-YEN, Wu
    • F24H1/06F24H1/22
    • F24H1/225F24D2220/07F24H1/06F24H1/201F24H1/208F24H2250/08F28D15/0275H05B6/108
    • A water boiler (10) includes a water storage tank (12), a heater (16), and a heat pipe unit (18). The water storage tank (12) includes a heating room (34), an outer water storage room (36), and an inner water storage room (40) between and spaced from the heating room (34) and the outer water storage room (36) in a radial direction. Outside water (56) flows from an inlet pipe (54) to the outer water storage room (36), and water (56) in the outer water storage room (36) flows into the inner water storage room (40) and the heating room (34) for storage. The heater (16) includes an induction coil (78). The heat pipe unit (18) includes a plurality of heat-transfer pipes (84). An upper segment (86) of each heat-transfer pipe (84) is arranged in the heating room (34), while a lower segment (88) of each heat-transfer pipe (84) is received in the induction coil (78). When the induction coil (78) turns ON, heat-transfer pipes (84) are heated to heat the water (56) in the heating room (34).
    • 水锅炉(10)包括储水箱(12),加热器(16)和热管单元(18)。 储水箱(12)在加热室(34)和外部储水室(32)之间和间隔开之后具有加热室(34),外部储水室(36)和内部储水室(40) 36)。 外部水(56)从入口管(54)流向外部储水室(36),外部储水室(36)内的水(56)流入内部储水室(40),加热 房间(34)存放。 加热器(16)包括感应线圈(78)。 热管单元(18)包括多个传热管(84)。 每个传热管(84)的上段(86)布置在加热室(34)中,而每个传热管(84)的下段(88)被容纳在感应线圈(78)中, 。 当感应线圈(78)接通时,加热传热管(84)以加热加热室(34)中的水(56)。
    • 8. 发明公开
    • METHOD OF CONSTRUCTION OF A WALL HEATING PANEL AND A WALL HEATING PANEL
    • 一种壁式加热板和一种壁式加热板的结构方法
    • EP3204696A1
    • 2017-08-16
    • EP15775276.7
    • 2015-08-26
    • Wójcik, JanuszWójcik, MarekWójcik, Pwel
    • Wójcik, JanuszWójcik, MarekWójcik, Pwel
    • F24D3/12F24D3/14F28D15/02
    • F24D3/125E04C2/043E04C2/525E04F13/12E04F2290/023F24D3/142F24D2220/07F28D15/02F28D15/0275F28D15/06F28D2021/0035Y02B30/24
    • The method of construction of a wall heating panel and a wall heating panel consists in constructing an aluminium multi-channel collector, preferably with one phase transition channel, connecting it inseparably with vertical aluminium heating elements, arranging the heating elements in the grooves of a dry wall construction board, preferably magnesium, and filling the space between the grooves and the heating elements with elastic compound, and then applying paper—aluminium foil laminate onto the whole surface of the board. A wall heating panel consists of an aluminium collector (1) with stub pipes (2), inside the collector there are horizontal parallel phase transition channels (3) and a water channel (4), the phase transition channel (3) is inseparably connected with the vertical aluminium heating elements (5) which are inserted into the grooves of the dry wall construction board (6), spaces between the grooves and the heating elements are filled with elastic compound (7) and sealed with paper—aluminium foil laminate (8), whereas the top part of the collector (1) adjoins the bottom surface of the board (6).
    • 构造壁式加热板和壁式加热板的方法在于构造铝多通道收集器,优选具有一个相变过渡通道,将其不可分离地与垂直铝加热元件连接,将加热元件布置在干燥槽中 最好是镁制成,并用弹性化合物填充凹槽和加热元件之间的空间,然后在纸板的整个表面上涂覆纸铝箔层压板。 一个壁式加热板由带有短管(2)的铝质收集器(1)组成,在收集器内部具有水平平行的相变通道(3)和水通道(4),相变通道(3)不可分离地连接 通过插入干墙结构板(6)的凹槽中的垂直铝加热元件(5),凹槽与加热元件之间的空间填充有弹性化合物(7)并用纸 - 铝箔层压板( 8),而收集器(1)的顶部邻接板(6)的底表面。
    • 10. 发明公开
    • High efficiency water boiling device
    • Hochleistungsboiler
    • EP2420755A2
    • 2012-02-22
    • EP11152689.3
    • 2011-01-31
    • Shun-Chi, YangMao, Hsiung YangYANG, Tsung-ChuanFANG, Ming-WuCHENG-YEN, Wu
    • Shun-Chi, YangMao, Hsiung YangYANG, Tsung-ChuanFANG, Ming-WuCHENG-YEN, Wu
    • F24H1/06F24H1/10
    • F24H1/106F24D2220/07F24H1/06F24H1/201F24H1/208F24H2250/08Y02P80/156
    • A water boiling device (10) includes a heat tank unit (14) received in a machine body (12), a high frequency induction heater (16), and a heat pipe unit (18). Heat tank unit (14) includes first and second heating tanks (34, 35) in communication with each other. Outside water (44) can flow into first and second heating tanks (34, 35). The high frequency induction heater (16) includes a heat pipe induction coil (66) and first and second induction coils (60, 62). The heat pipe unit (18) includes first and second heating pipes (72). An upper section (74) of each heating pipe (72) is received in one of heating tanks (34, 35), and a lower section (76) of each heating pipe (72) extends out of heating tanks (34, 35) and is inserted into heat pipe induction coil (66). The first and second heating tanks (34, 35) will heat up to heat the water (44) in the first and second heating tanks (34, 35) when a high frequency current is passed through the heat pipe induction coil (66) and first and second induction coils (60, 62).
    • 水沸腾装置(10)包括容纳在机体(12)中的加热箱单元(14),高频感应加热器(16)和热管单元(18)。 热箱单元(14)包括彼此连通的第一和第二加热箱(34,35)。 外部水(44)可以流入第一和第二加热箱(34,35)。 高频感应加热器(16)包括热管感应线圈(66)和第一和第二感应线圈(60,62)。 热管单元(18)包括第一和第二加热管(72)。 每个加热管(72)的上部(74)被容纳在一个加热箱(34,35)中,并且每个加热管(72)的下部(76)从加热箱(34,35)中延伸出来, 并插入热管感应线圈(66)。 当高频电流通过热管感应线圈(66)时,第一和第二加热箱(34,35)将被加热以加热第一和第二加热箱(34,35)中的水(44) 第一和第二感应线圈(60,62)。