会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • Method and system for controlling a vehicle
    • Methode und System zur Steuerung von einem Fahrzeug
    • EP1619102A1
    • 2006-01-25
    • EP04077113.1
    • 2004-07-21
    • Nedtrain Consulting B.V.
    • Peters, Johannes Josepf
    • B61L3/12
    • B61L3/065B61L3/02
    • Traffic detection system (4) for detecting a motion of a vehicle (2) on a track (1), the traffic detection system (4) including a traffic sign state detection arranged for detecting at least a stop state signal (S3) of a traffic sign (3), the stop state signal indicating to the vehicle to stop at or before a standstill position (x0) at the traffic sign (3), wherein the traffic detection system (4) includes a motion detector (5), the motion detector (5) being arranged for measuring at least one of a set of motion parameters of the vehicle, and the traffic detection system (4) is arranged for determining based on the at least one motion parameter obtained by the motion detector (5), a prediction signal relating to the vehicle (2) while approaching the traffic sign (3), to predict if during the stop state signal (S3) the vehicle (2) is capable to stop at or before the standstill position (x0).
    • 用于检测轨道(1)上的车辆(2)的运动的交通检测系统(4),所述交通检测系统(4)包括交通标志状态检测,所述交通状况检测被布置成用于检测至少一个停止状态信号 交通标志(3),所述停车状态信号指示车辆在交通标志(3)处的停止位置(x0)处或之前停止,其中所述交通检测系统(4)包括运动检测器(5) 运动检测器(5)被布置成用于测量车辆的一组运动参数中的至少一个,并且交通检测系统(4)被布置为基于由运动检测器(5)获得的至少一个运动参数来确定, 在车辆(2)接近交通标志(3)时与车辆(2)相关的预测信号,以预测在停车状态信号(S3)期间车辆(2)是否能够在停车位置(x0)处或停车位置(x0)之前停止。
    • 7. 发明公开
    • INFORMATION PROCESSING DEVICE AND OPERATION CURVE GENERATION METHOD
    • 比利时革命组织
    • EP3156303A1
    • 2017-04-19
    • EP15805991.5
    • 2015-06-04
    • Kabushiki Kaisha Toshiba
    • SAMEDA, YoshitoSUZUKI, Tatsunori
    • B61L27/00B60L15/40
    • B61L3/006B60L15/40B61L3/008B61L3/02B61L27/00
    • An information processing device in an embodiment includes a storage and an operation curve generator. The storage stores therein linear data including a slope and a curve for each set of certain locations, and train data including an acceleration-deceleration characteristic. The operation curve generator sets a plurality of deceleration section candidates on the basis of information about the set of certain locations stored in the storage, obtains, for each of the deceleration section candidates, a change rate of energy consumption when the deceleration is performed by a certain speed using a preset operation curve, the linear data, and the train data, selects the section in which the change rate of energy consumption in the obtained change rates of energy consumption is the largest from the deceleration section candidates, and updates the preset operation curve utilizing the selected deceleration section and the certain speed.
    • 实施例中的信息处理装置包括存储器和操作曲线发生器。 存储器存储包括每组某些位置的斜率和曲线的线性数据,以及包括加速 - 减速特性的列车数据。 操作曲线发生器基于存储在存储器中的某些位置的信息的信息来设定多个减速区间候补,对于每个减速区间候选,获得当减速度执行时的能量消耗的变化率 使用预设操作曲线,线性数据和列车数据的一定速度,从减速区间候选中选择所获得的能量消耗的变化率中的能量消耗的变化率最大的部分,并且更新预设操作 曲线利用所选择的减速段和一定速度。