会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • ÜBERGANG ZWISCHEN ZWEI GLEISABSCHNITTEN
    • ÜBERGANGZWISCHEN ZWEI GLEISABSCHNITTEN
    • EP2729617A1
    • 2014-05-14
    • EP12735944.6
    • 2012-06-20
    • RTE Technologie GmbH
    • KOWALSKI, MartinAL-THUWAINY, TariqKNITTEL, Stefan
    • E01B1/00E01B2/00
    • E01B1/001E01B1/002E01B2/00
    • The invention creates a transition (10) between a track section (12) laid in a ballast bed (11) and a track section (13) constructed as a ballastless railway track (14). In order to take the different settling conditions of the two types of track into account and create a continuous transition in the course of the track between the two types of tracks, the invention proposes a compensation unit (19) mounted on the ballastless railway track (14) at an abutment point (15) between the two types of track and extending over a transition zone (20) into the ballast bed (11) under the track section (12) laid there, forming a type of support ramp for the track section lying above and ensuring a uniform decline in the sinkage level of the track in the ballast bed towards the ballastless railway track.
    • 本发明在布置在压载床(11)中的轨道部分(12)和构造为无碴轨道(14)的轨道部分(13)之间形成过渡(10)。 为了考虑两种类型的轨道的不同的建立条件,并且在两种类型的轨道之间的轨道的过程中形成连续的过渡,本发明提出了一种安装在无碴铁路轨道上的补偿单元(19) 14)在两种类型的轨道之间的邻接点(15)处并且在过渡区域(20)上延伸到放置在其中的轨道部分(12)下方的压载床(11)中,形成用于轨道的一种支撑斜面 并确保压载舱中的轨道向无碴铁路轨道的下沉水平均匀下降。