会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明公开
    • FLUE-GAS TREATMENT APPARATUS AND OPERATING METHOD THEREFOR
    • 布鲁塞尔国家大学
    • EP2993398A1
    • 2016-03-09
    • EP15183249.0
    • 2015-09-01
    • Mitsubishi Hitachi Power Systems, Ltd.
    • SHIMAMURA, JunOKAWA, TsuyoshiSAITO, TakayukiYAMANE, NobuoSHIMAZU, HiromichiOCHIAI, RyotaISHIZAKA, Hiroshi
    • F23J15/02F23J15/00F23J15/06F23J15/08
    • F23J15/02F23J15/00F23J15/006F23J15/06F23J15/08Y02E20/363
    • A heat recovery unit (first device) 9, a precipitator 4, and a desulfurization unit 6 are disposed in this order in the flue-gas flow path of a boiler 1; a heating-medium using unit (second device) 10 is disposed in a region independent of the flue-gas flow path; and a heating-medium circulation line 11 (inlet-side line 11a and outlet-side line 11b) through which a heating medium is circulated and fed, a first heating-medium bypass line 13 that allows the heating medium from the line 11b to circulate to the line 11a while bypassing the second device 10, and a second heating-medium bypass line 15 that allows the heating medium from the line 11b to return to the line 11a while bypassing the first device 9 and the first line 13 are disposed between the second device 10 and first device 9. During the startup of the boiler 1 or immediately after igniting burners of the boiler 1, the following control process is performed: the entire heating medium is circulated to the second line 15 without feeding the heating medium to the first device 9; when the flue-gas temperature at the inlet of the first device 9 is increased, the heating medium is gradually fed into the heating-medium circulation line 11; when the flow rate of the heating medium in the line 11a becomes a predetermined rate and subsequently the temperature of the heating medium falls below a preset temperature, the heating medium flowing through the line 11b is circulated to the inlet of the first device 9 through the first line 13 to increase the temperature of the heating medium in the line 11a adjacent to the inlet of the first device 9; and when the flue-gas temperature at the outlet of the first device 9 exceeds a preset temperature, the heating medium is prevented from flowing through the first line 13. Thus, during the startup of the boiler, the inside of the flue-gas flow path downstream of the first device 9 is prevented from being placed in a corrosive environment, and the temperature of the heating medium flowing through the first device 9 is stably kept high.
    • 依次在锅炉1的烟气流路中设置热回收单元(第一装置)9,除尘器4和脱硫单元6; 加热介质使用单元(第二装置)10设置在独立于烟道气流路径的区域中; 和加热介质循环供给的加热介质循环管路11(入口侧管线11a和出口侧管路11b),允许来自管路11b的加热介质循环的第一加热介质旁通管路13 而绕过第二装置10的线路11a和允许来自线路11b的加热介质返回到线路11a同时旁路第一装置9和第一线路13的第二加热介质旁路管线15被布置在 第二装置10和第一装置9.在锅炉1启动期间或在点燃锅炉1的燃烧器之后立即执行以下控制过程:整个加热介质循环到第二管线15,而不将加热介质供给到 第一装置9; 当第一装置9的入口处的烟道气温度升高时,加热介质逐渐进入加热介质循环管线11; 当线路11a中的加热介质的流量变为预定速率,随后加热介质的温度下降到预定温度以下时,流经管线11b的加热介质通过第一装置9的入口循环通过 第一管线13,以增加与第一装置9的入口相邻的管线11a中的加热介质的温度; 并且当第一装置9的出口处的烟道气体温度超过预设温度时,防止加热介质流过第一管线13.因此,在锅炉启动期间,烟道气流 防止第一装置9下游的路径被放置在腐蚀性环境中,并且流过第一装置9的加热介质的温度稳定地保持高。