    • Method of operating a power plant
    • Verfahren zum Betreiben einer Kraftwerksanlage
    • EP2562383A2
    • 2013-02-27
    • EP12180613.7
    • 2012-08-16
    • General Electric Company
    • Wichmann, Lisa AnneSnook, Daniel DavidDraper, Samuel DavidOuellett, Noemie DionRittenhouse, Scott Allen
    • F02C1/00F02C7/228F02C9/28
    • F02C6/06F02C3/34F02C9/18F05D2260/85F05D2270/301
    • At least one main air compressor (12) makes a compressed ambient gas flow (26). The compressed ambient gas flow (26) is delivered to a turbine combustor (32) at a pressure that is greater than or substantially equal to an output pressure delivered to the turbine combustor (32) from a turbine compressor (30) as at least a first portion of a recirculated gas flow (50). A fuel stream (28) is delivered to the turbine combustor (32), and a combustible mixture is formed and burned, forming the recirculated gas flow (50). A turbine power is produced that is substantially equal to at least a power required to rotate the turbine compressor (30). At least a portion of the recirculated gas flow (50) is recirculated through a recirculation loop (52). An excess portion of the recirculated gas flow (50) is vented or a portion of the turbine compressor exhaust (44) bypasses the turbine combustor (32) or both.
    • 至少一个主空气压缩机(12)形成压缩的环境气流(26)。 压缩的环境气体流(26)以大于或基本等于从涡轮压缩机(30)输送到涡轮机燃烧器(32)的输出压力的压力被输送到涡轮机燃烧器(32),至少至少 循环气流(50)的第一部分。 燃料流(28)被输送到涡轮机燃烧器(32),并且形成并燃烧可燃混合物,形成再循环的气流(50)。 产生涡轮机功率,其大致等于至少旋转涡轮压缩机(30)所需的功率。 再循环气体流(50)的至少一部分通过循环回路(52)再循环。 排出再循环气体流(50)的一部分,或涡轮压缩机排气(44)的一部分绕过涡轮机燃烧室(32)或两者。
    • 7. 发明公开
    • Method of operating a power plant
    • 运行发电厂的方法
    • EP2562384A2
    • 2013-02-27
    • EP12180614.5
    • 2012-08-16
    • General Electric Company
    • Wichmann, Lisa AnneSnook, Daniel DavidOuellet, Noemie DionRittenhouse, Scott Allen
    • F02C1/00F02C7/228F02C9/28
    • F02C9/42F02C3/34F02C9/18
    • At least one main air compressor (12) makes a compressed ambient gas flow (26, 66). The compressed ambient gas flow (26, 66) is delivered to both master and slave turbine combustors (32, 72) at a pressure that is greater than or substantially equal to an output pressure delivered to each turbine combustor (32, 72) from each turbine compressor (30, 70) as at least a first portion of a recirculated gas flow (50, 90). A fuel stream (28, 68) is delivered to each turbine combustor (32, 72), and combustible mixtures are formed and burned, forming the recirculated gas flows (50, 90). A master and slave turbine power are produced, and each is substantially equal to at least a power required to rotate each turbine compressor (30, 70). At least a portion of the recirculated gas flows (50, 90) are recirculated through recirculation loops (52, 92), at least a portion of the output from the turbine compressors (30, 70) bypass the combustors (32, 72), and an excess portion of each recirculated gas flow (50, 90) is vented.
    • 至少一个主空气压缩机(12)产生压缩的环境气流(26,66)。 压缩的环境气流(26,66)以大于或基本上等于从每个涡轮燃烧器(32,72)输送到每个涡轮燃烧器(32,72)的压力的压力被输送到主涡轮燃烧器(32,72)和主涡轮燃烧器 涡轮压缩机(30,70)作为再循环气流(50,90)的至少第一部分。 燃料流(28,68)被输送到每个涡轮机燃烧器(32,72),并且形成并燃烧可燃混合物,形成再循环气流(50,90)。 主涡轮功率和从功率涡轮功率被产生,并且每个都大致等于旋转每个涡轮压缩机(30,70)所需的至少一个功率。 至少一部分再循环气流(50,90)通过再循环回路(52,92)再循环,来自涡轮压缩机(30,70)的输出的至少一部分绕过燃烧器(32,72), 并且每个再循环气流(50,90)的过量部分被排空。
    • 9. 发明公开
    • Method of operating a power plant
    • 运行发电厂的方法
    • EP2562383A3
    • 2018-01-03
    • EP12180613.7
    • 2012-08-16
    • General Electric Company
    • Wichmann, Lisa AnneSnook, Daniel DavidDraper, Samuel DavidOuellett, Noemie DionRittenhouse, Scott Allen
    • F02C1/00F02C7/228F02C9/28F02C3/34F02C6/06F02C9/18
    • F02C6/06F02C3/34F02C9/18F05D2260/85F05D2270/301
    • At least one main air compressor (12) makes a compressed ambient gas flow (26). The compressed ambient gas flow (26) is delivered to a turbine combustor (32) at a pressure that is greater than or substantially equal to an output pressure delivered to the turbine combustor (32) from a turbine compressor (30) as at least a first portion of a recirculated gas flow (50). A fuel stream (28) is delivered to the turbine combustor (32), and a combustible mixture is formed and burned, forming the recirculated gas flow (50). A turbine power is produced that is substantially equal to at least a power required to rotate the turbine compressor (30). At least a portion of the recirculated gas flow (50) is recirculated through a recirculation loop (52). An excess portion of the recirculated gas flow (50) is vented or a portion of the turbine compressor exhaust (44) bypasses the turbine combustor (32) or both.
    • 至少一个主空气压缩机(12)产生压缩的环境气流(26)。 压缩的环境气流(26)以大于或基本上等于从涡轮压缩机(30)输送到涡轮机燃烧器(32)的输出压力的压力被输送到涡轮燃烧器(32),作为至少一个 再循环气流(50)的第一部分。 燃料物流(28)被输送到涡轮机燃烧室(32),并且形成并燃烧可燃混合物,形成再循环气流(50)。 产生的涡轮功率基本上等于旋转涡轮压缩机(30)所需的至少一个动力。 再循环气流(50)的至少一部分再循环通过再循环回路(52)。 再循环气流(50)的过量部分被排空或者涡轮压缩机排气(44)的一部分绕过涡轮燃烧室(32)或两者。