    • System and method for re-indexing a pitch bearing of a wind turbine
    • 系统和Verfahren zur Re-Indizierung eines Blattlagers einer Windkraftanlage
    • EP2775137A2
    • 2014-09-10
    • EP14156315.5
    • 2014-02-24
    • General Electric Company
    • Yenigun, Esat SadiKulasekera, Vishan RashmiMoore, Bradley GrahamNeumann, Ulrich Werner
    • F03D1/00F03D7/02F03D11/00
    • F03D80/70F03D7/0224F03D80/50F05B2260/79Y02E10/723
    • A method 100 and system 30 for re-indexing a pitch bearing 40 of a wind turbine 10 includes: installing a plurality of first mounts 32 to the fixed outer race 42 of the pitch bearing 40; positioning the rotor blade 22 to a downwardly-oriented position; installing a hydraulic system 50; pressurizing the hydraulic system 50 so as to support the weight of the rotor blade 22 with the hydraulic system 50; detaching 105 the rotor blade 22 from the pitch bearing 40; lowering 106 the rotor blade 22 a predetermined vertical distance from the hub 20; installing a plurality of second mounts 60 to the rotor blade 22; attaching a plurality of supports 58 between the first mounts 32 and the second mounts 60; transferring the weight of the rotor blade 22 from the hydraulic system 50 to the plurality of supports 58; disengaging the hydraulic system 50; and re-indexing 111 the pitch bearing 40 so as to engage a new set of pitch bearing teeth.
    • 用于对风力涡轮机10的变桨轴承40进行重新分度的方法100和系统30包括:将多个第一安装件32安装到变桨轴承40的固定外座圈42上; 将转子叶片22定位到向下定向的位置; 安装液压系统50; 对液压系统50加压,以便利用液压系统50支撑转子叶片22的重量; 将转子叶片22从变桨轴承40拆下; 将转子叶片22从毂20减小预定的垂直距离; 将多个第二安装件60安装到转子叶片22上; 在第一安装件32和第二安装件60之间安装多个支撑件58; 将转子叶片22的重量从液压系统50传递到多个支撑件58; 使液压系统50脱开; 并对变桨轴承40进行重新分度111,以便接合一组变桨轴承齿。
    • 8. 发明公开
    • System and method for re-indexing a pitch bearing of a wind turbine
    • 用于重新索引风力涡轮机的变桨轴承的系统和方法
    • EP2775137A3
    • 2018-03-21
    • EP14156315.5
    • 2014-02-24
    • General Electric Company
    • Yenigun, Esat SadiKulasekera, Vishan RashmiMoore, Bradley GrahamNeumann, Ulrich Werner
    • F03D1/00F03D7/02F03D11/00
    • F03D80/70F03D7/0224F03D80/50F05B2260/79Y02E10/723
    • A method 100 and system 30 for re-indexing a pitch bearing 40 of a wind turbine 10 includes: installing a plurality of first mounts 32 to the fixed outer race 42 of the pitch bearing 40; positioning the rotor blade 22 to a downwardly-oriented position; installing a hydraulic system 50; pressurizing the hydraulic system 50 so as to support the weight of the rotor blade 22 with the hydraulic system 50; detaching 105 the rotor blade 22 from the pitch bearing 40; lowering 106 the rotor blade 22 a predetermined vertical distance from the hub 20; installing a plurality of second mounts 60 to the rotor blade 22; attaching a plurality of supports 58 between the first mounts 32 and the second mounts 60; transferring the weight of the rotor blade 22 from the hydraulic system 50 to the plurality of supports 58; disengaging the hydraulic system 50; and re-indexing 111 the pitch bearing 40 so as to engage a new set of pitch bearing teeth.
    • 用于重新索引风力涡轮机10的变桨轴承40的方法100和系统30包括:将多个第一安装座32安装到变桨轴承40的固定外座圈42; 将转子叶片22定位在向下取向的位置; 安装液压系统50; 对液压系统50加压以便用液压系统50支撑转子叶片22的重量; 将转子叶片22从变桨轴承40分离105; 将转子叶片22从轮毂20下降106预定的垂直距离; 将多个第二安装件60安装到转子叶片22; 将多个支撑件58附接在第一安装件32和第二安装件60之间; 将转子叶片22的重量从液压系统50传递到多个支撑件58; 分离液压系统50; 并重新索引111变桨轴承40以便接合一组新的变桨轴承齿。