    • NUCLEAR POWER PLANT EQUIPMENT GATE CONNECTION FASTENING STRUCTURE AND FASTENING METHOD THEREFOR
    • EP3886114A1
    • 2021-09-29
    • EP18940789.3
    • 2018-12-02
    • China Nuclear Power Design Company Ltd. (Shenzhen)China Nuclear Power Engineering Co., Ltd.China General Nuclear Power GroupCGN Power Co., Ltd.
    • LIU, XiaohuaZHANG, FengXIE, HonghuCHEN, ChuyuanLI, YueLI, Shilei
    • G21C13/028
    • The present invention provides a nuclear power plant equipment gate connection fastening structure and fastening method therefor. The nuclear power plant equipment gate connection fastening structure includes a sleeve flange (10) fixedly connected to a penetrating sleeve (12) pre-embedded in a containment wall and a shell cover flange (20) fixedly connected to a gate shell cover (22). A number of "U"-shaped holes (30) having openings facing outward are provided at the corresponding positions of the sleeve flange (10) and the shell cover flange (20) along the circumference thereof. After the sleeve flange (10) and the shell cover flange (20) are in butt joint, the sleeve flange (10) and the shell cover flange (20) are fastened by means of eyelet bolt assemblies (40). Each eyelet bolt assembly (40) includes a detachable eyelet bolt (42), an external nut (44), and an adjustable gasket (46) sheathed onto the eyelet bolt (42). The fastening method of the present invention includes the steps of: 1) arranging orientations according to the eyelet bolt assemblies (40) of an equipment gate, and performing bolt pre-tightening by a bolt tensioner, the bolt tensioner containing 2-4 combination tension heads, each combination tension head containing 2-4 tension cylinders for pre-tightening 4-16 eyelet bolt assemblies (40) each time; 2) during pre-tightening, symmetrically and evenly placing the combination tension heads on the eyelet bolt assemblies (40) which are circumferentially arranged, and connecting a hydraulic pump station (83) via a hydraulic pipeline (82); 3) performing tension and pre-tightening operations on the eyelet bolts (42) by using hydraulic power assist after starting the hydraulic pump station (83); 4) performing the pre-tightening operation by switching to the next set of the eyelet bolt assemblies (40) clockwise or counterclockwise after one set of the eyelet bolt assemblies (40) being pre-tightened fully. The connection fastening structure and fastening method therefor can enable the equipment gate to be opened and closed quickly, to avoid some of the bolts from being incapable of being mounted due to the deformation of the sleeve flange (10) and a bolt hole of the equipment from being damaged.