会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 10. 发明公开
    • Method and apparatus for determining and representing continuous resource loading profiles for complex discrete manufacturing
    • 在复杂的离散生产确定和呈现用于生产资源连续可用性轮廓的方法和装置
    • EP1640833A1
    • 2006-03-29
    • EP05019494.3
    • 2005-09-07
    • Siemens Technology-to-Business Center, LLC
    • Giebels, Mark Mathieu TheodorusBenson, Daniel Conrad
    • G05B19/418
    • G05B19/41865Y02P90/20
    • A method of analyzing a manufacturing system. The manufacturing system includes a plurality of manufacturing resources. A set of orders is currently appointed for processing by the manufacturing system. Each order of the set of orders requires performance of at least one task. Each task is to be performed by at least a respective one of the manufacturing resources. The method includes determining stochastic parameters for each task of the plurality of tasks. The method also includes calculating a loading profile for at least one of the manufacturing resources that is allocated to at least one of the plurality of tasks. The loading profile function is a function of time and represents a probability that the manufacturing resource is occupied at a given time. The calculation is based at least in part on the stochastic parameters of the tasks.
    • 分析的制造系统的方法。该制造系统包括:制造资源的复数。 一组订单,目前任命由制造系统处理。该组订单的每个订单至少需要一个任务的执行能力。 每个任务是由至少一个respectivement制造资源中的一个来执行。 该方法包括任务的多个每项任务确定性采矿随机参数。 因此,该方法包括计算负载简档的制造资源中的至少一个没有被分配给任务的多个的至少一个。 加载配置文件功能是时间的函数和darstellt概率DASS模具制造资源在给定时间占用。 该计算是在对任务的随机参数至少部分地基于。