热词
    • 2. 发明申请
    • AN APPARTUS FOR LATERALLY DISPLACING A PAIR OF RAILWAY TRACKS
    • 用于横向移动铁路轨道的一个对象
    • WO2012122585A1
    • 2012-09-20
    • PCT/AU2012/000194
    • 2012-02-29
    • KREYMBORG, Shayne, Robert
    • KREYMBORG, Shayne, Robert
    • E01B35/02E01B35/10
    • E01B33/04
    • The present invention relates generally to an apparatus (10) for laterally displacing a pair of railway tracks (12A and 12B). The apparatus (10) generally comprises a pair of abutment elements (14A and 14B) interconnected by an intermediate member (16) with one of the abutment elements (14A) operatively coupled to an actuator (18). The actuator (18) moves the abutment element ((14A)) into pressing engagement with an outer face (20A) of the railway track (12A) which consequentially urges the other abutment element (14B) into pressing engagement with an outer face (20B) of the other railway track (12B). These forces are effective in displacing the pair of railway tracks (12A/B) inwardly toward one another.
    • 本发明一般涉及用于横向移位一对铁路轨道(12A和12B)的装置(10)。 装置(10)通常包括通过中间构件(16)与可操作地联接到致动器(18)的抵靠元件(14A)中的一个相互连接的一对邻接元件(14A和14B)。 致动器(18)使邻接元件((14A))移动成与铁路轨道(12A)的外表面(20A)压力接合,从而促使另一个邻接元件(14B)与外表面(20B) )的另一条铁路轨道(12B)。 这些力有效地将一对铁路轨道(12A / B)朝向彼此向内移动。
    • 3. 发明公开
    • 콘크리트 도상 선로의 궤간정정기
    • 混凝土床轨道轨道调整装置
    • KR1020120013655A
    • 2012-02-15
    • KR1020100075777
    • 2010-08-06
    • 한국철도공사
    • 이우용김종만박종삼김종규이환영
    • E01B35/02E01B33/00
    • E01B35/02E01B33/04E01B2205/00
    • PURPOSE: A gauge corrector on a concrete railway track is provided to enable one operator to repair the gauge of railway easily, accurately and rapidly if deformation occurs on the gauge of rail on a concrete railway track. CONSTITUTION: A gauge corrector(30) on a concrete railway track comprises a body(31), a rail hanger(32), a ratchet wrench(33), and an insulator(37). The body is formed as a hollow pipe. The central part of the body is separated, and a block(31a) is installed so that a screw is fastened to the inner end of the separated part of the body. The rail hanger is installed on both ends of the body. The rail hanger makes tight contact with the side ends of both rails when a work is done. The ratchet wrench is installed on the central part of the body, and moving screws(34,35) are respectively fixed to both sides of the ratchet wrench.
    • 目的:提供混凝土轨道上的量规校正器,使得一个操作员能够在混凝土轨道上的轨道上发生变形时,容易,准确和快速地修理铁路规。 构成:混凝土轨道上的量规校正器(30)包括主体(31),导轨悬挂器(32),棘轮扳手(33)和绝缘体(37)。 身体形成为中空管。 主体的中心部分被分离,并且安装有一块(31a),使得螺钉紧固到主体的分离部分的内端。 铁路吊架安装在车身的两端。 当工作完成时,导轨挂架与两个导轨的侧端紧密接触。 棘轮扳手安装在主体的中心部分,并且移动螺钉(34,35)分别固定在棘轮扳手的两侧。