会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Device for producing slag in an electric arc furnace
    • 电弧炉炉渣生产装置
    • US06424672B1
    • 2002-07-23
    • US09674965
    • 2001-01-11
    • Wilfried SteinKarl Stein
    • Wilfried SteinKarl Stein
    • F27D2304
    • F27B3/22C21C5/5217F27B3/085F27B3/28F27D3/18Y02P10/143Y02P10/216
    • An electric arc furnace (1), wherein solids are injected into the furnace chamber. The lances (9, 10, 11) are guided through the wall (12) of the electric arc furnace (1) and inserted into the wall of the furnace, whereby at least one lance is associated with each electrode (2, 3, 4), in order to enable a homogenous formation of slag and to inject as great an amount of solids as possible. The lances are distributed in an approximately uniform manner along the periphery of the furnace. The inclination of the lances and thus the angle of injection are selected in such a way that they form an angle of approximately 30-80° in relation to the flow direction of the melting bath and form an angle of approximately 10-30° in relation to the horizontal.
    • 一种电弧炉(1),其中固体被注入到炉室中。 喷枪(9,10,11)被引导通过电弧炉(1)的壁(12)并插入炉壁中,由此至少一个喷枪与每个电极(2,3,4) ),以便能够均匀地形成炉渣并且尽可能地注入大量的固体。 喷枪沿着炉的周边以大致均匀的方式分布。 喷枪的倾斜度以及喷射角的选择方式使得它们相对于熔融槽的流动方向形成大约30-80°的角度并形成大约10-30°的角度 到水平线。
    • 2. 发明授权
    • Method for operating an electric arc furnace to build up and maintain foamed slag
    • 操作电弧炉以建立和保持泡沫炉渣的方法
    • US06400748B1
    • 2002-06-04
    • US09674966
    • 2001-01-08
    • Wilfried SteinKarl Stein
    • Wilfried SteinKarl Stein
    • H05B1100
    • F27B3/28C21C5/52C21C5/54F27B3/085F27B3/22F27D3/18Y02P10/216
    • In order to operate an electric arc furnace (1) in optimum conditions, especially in order to build up and maintain a certain intensity of foamed slag, the amount of slag builder fed into the furnace (1) and therefore the power consumption of the furnace (1) is regulated according to the current received by the electrodes (2) in such a way that a maximum amount of slag builder is initially added in order to build up said foamed slag until the amount of current received by the electrodes (2) is reduced. Subsequently, the amount of added slag builder is reduced until the amount of current received reaches a predetermined set value. The theoretical amount of current received is kept constant by reducing or increasing the added amount of slag builder.
    • 为了在最佳条件下操作电弧炉(1),特别是为了建立和保持一定强度的泡沫炉渣,进料到炉子(1)中的炉渣助洗剂的量以及炉的功率消耗 (1)根据由电极(2)接收的电流调节,使得最初添加最大量的炉渣助洗剂,以便建立所述泡沫渣直到由电极(2)接收的电流量为止, 降低了。 随后,添加的渣助渣剂的量减少,直到接收的​​电流达到预定的设定值。 通过减少或增加添加量的渣渣助熔剂,可以使理论电流量保持不变。