    • Obstacle removing device in skeleton underground piping
    • 在SKELETON地下管道中的障碍物去除装置
    • JP2005125264A
    • 2005-05-19
    • JP2003365413
    • 2003-10-27
    • Ohbayashi CorpShowa Sangyo:KkTokyo Gas Co Ltd東京瓦斯株式会社株式会社大林組株式会社昇和産業
    • NAKANO MASABUMIKAWAMURA YOSHINORIAOKI HIROYUKIAZEYANAGI TOMOSUMISATO TAKETOMITO TSUNEJI
    • B08B9/02B08B9/049
    • PROBLEM TO BE SOLVED: To reduce the cost and time by making it possible to cope with curved portions and whole-cross section blocking. SOLUTION: A removing device removes the obstacle 14 when it intrudes into the piping 12 laid in the skeleton, and is provided with a top rod 16 disposed at the top inside the piping 12, an intermediate rod 18 that is connected through a universal joint 32 mounted at the rear side of the rod 16 and a plurality of extension rods 20 that are sequentially connected. A grinding bit 22 is fixedly bonded to the top of the rod 16, a first guide ball 24 rotatable axially is mounted in the outer periphery of the rod 16. Second and third guide balls 26, 28 rotatable axially are mounted in both end outer peripheries of the rod 18, and a vibration damping weight 29 movable along the axial direction of the rod 18 is mounted. A rotary drive that rotates the bit 22 is provided through the extensions, the intermediate and top rods 20, 18, 16 at the rear ends of the rods 20 that are the last ends. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过使得可以应对弯曲部分和全截面阻塞来减少成本和时间。 解决方案:移除装置在进入到骨架中的管道12中时,去除障碍物14,并且设置有设置在管道12内的顶部的顶杆16,中间杆18通过 万向接头32安装在杆16的后侧,并且多个延伸杆20依次连接。 研磨钻头22固定地接合到杆16的顶部,可轴向旋转的第一导向球24安装在杆16的外周。轴向可旋转的第二和第三导向球26,28安装在两端外周边 并且安装沿着杆18的轴向可移动的减震重量29。 旋转钻头22的旋转驱动器通过延伸部分提供,中间杆和顶杆20,18,18位于作为最后端的杆20的后端。 版权所有(C)2005,JPO&NCIPI
    • 6. 发明专利
    • Total inspection device for concrete
    • 混凝土总检验装置
    • JP2003004728A
    • 2003-01-08
    • JP2001190725
    • 2001-06-25
    • Kochi Univ Of TechnologyOhbayashi CorpTokyo Gas Co Ltd学校法人高知工科大学東京瓦斯株式会社株式会社大林組
    • SUGANO SHIGERUAOKI SHIGERUKUBO YUKINORINAKANO MASABUMIAOKI HIROYUKIAZEYANAGI TOMOSUMIOUCHI MASAHIRO
    • G01N33/38
    • PROBLEM TO BE SOLVED: To accurately inspect self-filling capacity regardless of a flow down speed generated at the time of charging of concrete.
      SOLUTION: The total inspection device 1 for concrete is equipped with a concrete flow down bottom plate 2 on which highly flowable concrete flows down, a pair of side plates 3a and 3b opposedly arranged to the lateral edges of the concrete flow down bottom plate 2 and the obstacle 4 arranged on the downstream side of the concrete flow down bottom plate 2 and constituted so as to form an almost box shape as a whole. A first barrier wall 6 is vertically provided on the concrete flow down bottom plate 2 as a predetermined barrier wall so as to obstruct the flow down of highly flowable concrete charged from the upstream side of the concrete flow down bottom plate 2 and a pair of guide walls 7a and 7b are vertically provided in opposed relationship on the downstream side thereof and highly flowable concrete is gathered to the guide flow channel 11 formed to the space held between the guide walls.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:无论在混凝土充电时产生的流下速度如何,都能准确地检查自填充能力。 解决方案:混凝土总检查装置1装有一个混凝土流下底板2,高流动混凝土向下流动,一对侧板3a和3b相对地设置在混凝土的侧边缘下流到底板2, 布置在混凝土下游侧的障碍物4流下底板2,并且构成为整体形成几乎箱形。 第一阻挡壁6垂直地设置在作为预定阻挡壁的混凝土流下底板2上,以便阻碍从底部板2的混凝土流的上游侧填充的高流动性混凝土的下流,以及一对导向件 壁7a和7b在其下游侧以相对的关系垂直地设置,并且高流动性混凝土被聚集到形成到保持在引导壁之间的空间的引导流动通道11。